英语人>词典>汉英 : 下承桥 的英文翻译,例句
下承桥 的英文翻译、例句

下承桥

词组短语
through bridge
更多网络例句与下承桥相关的网络例句 [注:此内容来源于网络,仅供参考]

By the finite element simulation to Qingchuan Bridge dynamic characteristic, the thesis discusses manifold factors which influence the dynamic characteristic of half-through concrete filled steel tubular arch bridge, and gets some conclusions.

本文通过对晴川桥的动力特性进行有限元模拟,论述了影响下承式钢管混凝土拱桥动力特性的多种因素,并得出了一些结论。

At last, with the elevated pile foundation model of a floating type cable-stayed bridge, pushover analysis with common patterns and new pattern on longitudinal direction is made, then compared with nonlinear time history analysis. The result shows the new pattern works well.

以一飘浮体系斜拉桥的高桩承台模型为例,进行常见模式以及新模式下纵桥向的推倒分析,并将推倒分析曲线与非线性时程分析的结果进行了比较,发现新模式的结果与时程分析的结果吻合得较好。

With the increasing of concrete deck slab gap for dense transverse girder deck system, the vertical displacement of tied-girder increases unconspicuously, and the internal forces of tied girder and arch rib vary slowly.

针对高速铁路下承式结合梁系杆拱桥,通过有限元分析,对纵横梁桥面系和密布横梁桥面系2种结合方式、混凝土桥面板不同的分块方式等问题进行研究。

This graduation primary of project coverage is: 2×80m bottom-road bridge continual steel truss girder bridge structure analysis and load experimental design.

猫(13):本次毕业设计的主要内容是:2×80m下承式连续钢桁梁桥结构分析与荷载试验设计。

The 4th Qiantangjiang River Bridge in Hangzhou is a concrete-filled steel tubular composite tied arch bridge with double decks and double main arches.

钱江四桥为双层桥面双主拱钢管混凝土组合系杆拱桥,主桥共有11跨,包括了下承、中承、上承三种拱桥形式。

Constraint of the middle truss on the crossbeams approximates to absolute rigidity and the distance between the stringer and the middle low chord are small in the four-line through truss bridge with three main trusses, which produces much larger horizontal bending stresses of the crossbeams as compared with two-truss bridges.

在四线铁路三主桁下承式钢桁梁桥中,中桁对横梁的约束近于绝对刚性,纵梁离中桁下弦杆的距离较小,使横梁的面外弯曲应力较二主桁桥梁大得多。

Horizontal push will arise Pier displacement of the through arch bridge of concrete-filled steel tubes under the condition of erection of arch ribs , concreting process, transverse beam pouring and installation.

下承式钢管拱系杆拱桥在拱肋安装、钢管混凝土浇筑、横梁安装和现浇横梁、桥面板湿接头时对拱脚产生的水平推力极易造成桥墩位移,通过对不同过程中的水平力计算,确定体外束张拉方案,使水平力通过体外束得以平衡。

In this paper, the through truss composite beam is first equalized to a box beam and the progression solutions to the temperature effect of the composite beam are then obtained with the variation method.

首先将下承式桁梁结合梁等效为箱形梁,再用变分法求出了下承式桁梁结合梁温度效应的级数解,并对京沪高速铁路上的一座简支下承式钢桁结合梁桥进行了计算,其结果可供下承式桁梁结合梁设计参考。

This paper is based on the former research taking the No.1 Tong-Lv Bridge as an example; the large universal finite element program Midas/Civil is adopted, a three-dimensional finite element model is established. The static performance, the comparative analysis of influence surfaces, the experimental study and the analysis of a local finite element model of the new style three-span continuous through type bow-string arch bridge is made. With these studies, this paper is aimed at revealing the performance of this kind of construction.

本文在前人研究的基础上,以通吕一号桥为背景,采用空间有限元法对结构形式新颖的三跨连续下承式系杆拱桥的静力性能、影响面比较分析、实桥荷载试验、局部节点分析等进行研究,旨在深入理解该结构形式桥梁的力学性能,为今后相同结构体系桥梁的结构分析提供可以参考的建议。

更多网络解释与下承桥相关的网络解释 [注:此内容来源于网络,仅供参考]

half through bridge; midheight deck bridge:半穿式桥;中承式

上承式桥 deck bridge | 半穿式桥;中承式 half through bridge; midheight deck bridge | 下承式桥 through bridge

through plate girder:下承钣梁

through lot 完成宅地 | through plate girder 下承钣梁 | through plate girder bridge 下承钣梁桥

Through Cut:路斩

through bridge 穿式桥 ,下承桥 | through cut 路斩 | through highway 直达公路 ,优先公路

through cut WESTBANK:路斩

through bridge WESTBANK 穿式桥 ,下承桥 | through cut WESTBANK 路斩 | through highway WESTBANK 直达公路 ,优先公路

through bridge:下承式桥

半穿式桥;中承式 half through bridge; midheight deck bridge | 下承式桥 through bridge | 双层桥 double-deck bridge

through bridge:穿式桥 ,下承桥

through bolt 穿螺栓,贯穿螺栓 | through bridge 穿式桥 ,下承桥 | through cut 路斩

through bridge:下承桥,下承式桥

through bolt ==> 双头贯空螺栓,贯穿螺栓 | through bridge ==> 下承桥,下承式桥 | through call ==> 直接通话

through bridge WESTBANK:穿式桥 ,下承桥

through bolt WESTBANK 穿螺栓,贯穿螺栓 | through bridge WESTBANK 穿式桥 ,下承桥 | through cut WESTBANK 路斩

through plate girder bridge:下承钣梁桥

through plate girder 下承钣梁 | through plate girder bridge 下承钣梁桥 | through road 通路

through bolt:穿螺栓,贯穿螺栓

through beam 连续梁 | through bolt 穿螺栓,贯穿螺栓 | through bridge 穿式桥 ,下承桥