upper beam
- upper beam的基本解释
-
-
远光
- 相似词
- 更多 网络例句 与upper beam相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.
在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。
-
Based on the system feedback archetype mode theory, the dissertation introduce the upper limit stepwise generation and elimination method of the system pullulate upper limit mode, construct the five upper limit archetype mode such as: market demand upper limit archetype mode, human resource upper limit archetype mode; fund upper limit archetype modes; technology innovation upper limit archetype mode; government support upper limit archetype mode ;By combining the five upper limit archetype mode ,we can attain a electronic information industry developmental pattern system upper limit archetype mode.
利用系统科学反馈基模分析理论,提出了系统成长上限模型上限逐步生成与消除法,通过构建江西电子信息产业市场需求成长上限子基模、人力资源不足成长上限子基模、政府支持有限成长上限子基模、资金不足成长上限子基模、创新能力不足成长上限子基模等5个基模,并对其做并运算,得到了江西电子信息产业系统成长上限基模,刻画了资金、市场、技术创新、人才与政府支持相互制约的关联关系。
-
This paper proceeded the flexural experiment respectively of two flexural strengthen beam by CFS, one compared reinforced concrete beam, and proceed sheared experiment research of two U style stirrups of CFS combined compacted sheared strengthen beam, one compared reinforced concrete beam. analyze and compare some working characters such as width of cracks, the deflection and ultimate moment of an unstrengthen compared beam, an initial strengthen beam and a beam strengthened after crack by compacting .
本文分别进行了2根粘贴碳纤维布受弯加固梁和1根钢筋混凝土对照梁的受弯试验研究及2根碳纤维布U形箍+压条受剪加固梁和1根钢筋混凝土对照梁的受剪试验研究,分析对比了对照梁、直接加固梁、压裂卸荷后再加固梁三者的挠度、裂缝、极限荷载等工作性能。
- 更多网络解释 与upper beam相关的网络解释 [注:此内容来源于网络,仅供参考]
-
upper orifices:上窍
上焦 "upper-jiao,upper warmer,upper heater" | 上窍 upper orifices | 上消 diabetes involving the upper-jiao
-
upper back panel:(车身)后围上盖板
upper arm (悬架)上臂 | upper back panel (车身)后围上盖板 | upper beam (前照灯)远光
-
upper side of tonnage deck:量吨甲板上面
upper side of deck beam 甲板梁上缘 | upper side of tonnage deck 量吨甲板上面 | upper side rail 集装箱)顶部桁材