sub contractor
- sub contractor的基本解释
-
-
分包者
- 相似词
- 更多 网络例句 与sub contractor相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The paper emphatically and deeply studied how to design and realize the functions sub-modules of the configurationally monitoring, the sub-modules include safety management sub-module, process flow sub-module, flow measurement sub-module, alarm sub-module, cure sub-module, parameter setting sub-module, report sub-module. The configurationally monitoring module possesses perfect functions of dynamically monitoring the production process of operating area, dynamically displaying parameter records of flow, pressure as well as temperature, inquiring and analyzing parameter records, drawing tendency charts, data alarming, automatic generating and printing all kinds of report forms and safely managing system.
本文继续深入的对构成组态检测模块的七个子模块;系统安全管理模块、工艺流程模块、流量计量模块、报警模块、曲线图模块、参数设置模块、报表模块的设计开发展开了研究,实现了对作业区生产过程的动态显示,流量、压力、温度等参数的动态显示与历史查询、曲线的绘制、数据报警、各种工作报表的自动生成和打印及安全管理等功能。
-
At end of each mouth the Contractor shall deliver to the Engineer a priced statement of the labour, materials and the Contractor's Equipment, except as aforesaid, used and the Contractor shall be not entitled to any payment unless such lists and statements have been fully and punctually rendered. Provided always that if the Engineer considers that for any reason the sending of such lists or statements by the Contractor, in accordance with the foregoing provision, was impracticable he shall nevertheless be entitled to authorize payment for such work, either as daywork, on being satisfied as to the time employed and the labour, materials and Contractor's Equipment used on such work, or at such value therefore as shall, in his opinion, be fair and reasonable.
每个月末,承包人应向工程师送交一份不包括上段内容的所用劳务,材料,承包人的机械设备并标有价格的结帐清单,如承包人未能将此结帐单与报表开列齐全,准时提交,则承包人无权获得任何款项,但是如工程师认为按上述规定,承包人的清单和结帐单的呈报由于任何原因而实际无法做到,则工程师仍然有权核准此等工作款项,该项款项或按计日工计算(工程师必须对该工程所雇的劳力,时间,所用的材料和承包人的设备情况表示满意)或按工程师认为公平合理的该项工程的价值计算。
-
Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.
如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。
- 更多网络解释 与sub contractor相关的网络解释 [注:此内容来源于网络,仅供参考]
-
sub-contract working plan:子合同工作计划
子合同开发过程监控计划 sub-contract development monitoring plan | 子合同工作计划 sub-contract working plan | 候选子承包商评估报告 candidate sub-contractor evaluation report
-
registered contractor:注册承建商;注册承办商
Registered general building contractor 注册一般建筑承建商 | Registered Contractor 注册承建商;注册承办商 | Registered fire service installation contractor 注册消防装置承建商
-
contractor'strial:承造厂试航
contractor'sseatrials 工厂试航 | contractor'strial 承造厂试航 | contractor'strial 承造厂试航承造厂试验