package arrangement
- package arrangement的基本解释
-
-
一揽子方案
- 相似词
- 更多 网络例句 与package arrangement相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This invention discloses a user data process method, which contains 1, judging each data package in IP data steam sent form high layer of empty command protocol stack, if the received IP data package is TCP ACK data package, then executing step 2, if the received data package is not TCP ACK, then executing step 3, 2, making PDCP layer function process to IP data package and ending current process, 3, making flow control to IP data package and then executing 2,, said invention can precedential send TCP ACK data package to opposite part in preserving original TCP/IP and universal mobile telecommunication system data transmission system base, to reduce data package reversion time delay and keep stable data transmission rate.
本发明公开了一种用户面数据处理方法,其主要处理步骤如下:a。对从空口协议栈中高层下发的IP数据流中的每一个数据包进行判断:当前接收到的IP数据包是否为TCP的ACK数据包,对所有是TCP的ACK数据包的IP数据包执行步骤b;对所有不是TCP的ACK数据包的IP数据包执行步骤c;b。对IP数据包进行PDCP层的功能处理,结束当前处理流程;c。对IP数据包进行流控,再转入步骤b。采用本发明方法能够在保持原有TCP/IP和全球移动通信系统数据传输机制的基础上,优先将TCP的ACK数据包发送到对方,从而减少TCP的ACK数据包的回复时延,保证稳定的用户面数据传输速率。
-
External carton package, vacuum-packed per 200 grams 40 package, 200 grams 50 package, 300 grams 50 package, 400 grams 50 package, 200 grams 80 packets, 1000 grams 20 package, 400 grams 40 packets , 100 grams 100 packets, 5000 grams of ordinary packaging 4 packets, 5000 grams 5 package.
外用纸箱套装,真空包装每件200克×40包、200克×50包、300克×50包、400克×50包、200克×80包、1000克×20包、400克×40包、100克×100包,普通包装5000克×4包、5000克×5包。
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
- 更多网络解释 与package arrangement相关的网络解释 [注:此内容来源于网络,仅供参考]
-
package goods arrangement:包装零售货物计划
6.生产商 maufacturer | 7.包装零售货物计划 package goods arrangement | 8.布匹 piece goods