英语人>网络例句>流程图 相关的搜索结果
网络例句

流程图

与 流程图 相关的网络例句 [注:此内容来源于网络,仅供参考]

The article mainly introduced the type of abradant, production methods, production technics and especially introduced two kinds of abradant, the common aluminum hydroxide by sintering process and spherical aluminum hydroxide with sodium aluminate and carbon dioxide.

主要介绍了牙膏磨擦剂的种类、各类牙膏磨擦剂的生产方法和生产工艺,并重点介绍了两种氢氧化铝牙膏磨擦剂,即以烧结法工艺生产的普通氢氧化铝颗粒和由铝酸钠溶液和二氧化碳气体制备的球形氢氧化铝牙膏磨擦剂,并给出了两种氢氧化铝牙膏磨擦剂的工艺流程图、电镜分析图谱、物化性能和工艺指标。

Combining concrete datas and restriction condition of qinjiang river, this dissertation uses POA to resolve the objective to maximize the benefit production on short-term optimal dispatching about cascaded hydroplants, giving concret account step and flow chart, adopt object-oriented method to program and then analysis and sums up these computing results.

给定清江相关数据约束条件下,用POA改进算法,对梯级电站短期发电效益最大模型进行了求解,给出了具体的计算步骤和程序流程图,采用面向对象方法进行程序设计,提高了程序的可扩充性,并对优化计算结果进行分析,优化计算的时间和精度都达到了项目要求,有明显的经济效益。

The detail functions of simulation in integrated air defense were described with UML active diagram based on flow chart.

并利用基于流程图和数据流图的UML活动图表述综合防空仿真的功能细节。

Flowcharts are after all, the illerate's form of documentation.

真正的程式员不画流程图流程图是文盲写的文档。

Flowcharts are after all, the illerate's form of documentation.

真正的程式员不画流程图流程图是文盲写的文件。

L A block flow diagram or simplified process flow diagram

l方块流程图或简化的工艺流程图

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计的过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适的建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备的设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间的初步设计。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计の过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适の建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备の设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间の初步设计。

There are also double climaxes in life expectancy curves of male: One is 7.413 months when the population is 7 months old, the other is 6.5 months when the population is 19 months old. Finally, the innate capacity of increase of plateau pikas is 0.4127, and there are two peaks in reproductive value curves: One is 2.0526 during the age group Mon.

本项研究结合Tanner(1978)提出的Jolly-Seber方法计算过程,用AutoCAD软件作出N-S流程图并用Turbo C语言开发出Jolly-Seber方法的应用程序;同时,也作出动态生命表和综合生命表的N-S流程图并在Turbo C环境下开发出应用程序。

Thirdly, it analyzes and studies in detail Surpac mechanism and the relevant concepts on constructing the model of mineral deposits and mining engineering systems according to the modeling procedure and the actual conditions of Jinchuan"s mines. Based on these:Lit points out some differences between the western countries and China in the practice of the geological data record, explores the inputting data on computers performed by more people at the same time and the method to improve constructing the data-base and finished the data-base of Jinchuan mineral deposits;2.It puts forward the steps and flow chart to construct the solid model and brings forward the scheme of "first individual then whole to set up Jinchuan mineral deposits geological model, summarizes some experiences for constructing the complicated geological ore body of the high accuracy: add control lines, add auxiliary demarcation lines +control lines, the operation of intersection, cross and incorporation between solid bodies and plane and section combination. The above-mentioned methods applied to construct the mineral deposits solid models of four mine areas in Jinchuan; 3.lt studies and presents the detailed flow chart of constructing block and grade model, analyses the workable scheme in setting up the block and grade model of main ore body for Jinchuan mineral deposits and also sets it up.

接着,按建模流程并结合公司矿山实情,详细研究、分析了Surpac构造矿床模型和采矿工程系统模型的机理、有关概念,在此基础上:(1)指出了西方国家与我国在地质数据记录习惯方面存在的一些差异,探索出多人多机同时录入、提高建库效率的方法,建立了金川矿床地质数据库;(2)研究并提出了构造实体模型的步骤和流程图及&先分后整&建立金川矿床地质体实体模型方案,总结出建立高精度复杂地质体模型几点经验:添加控制线法、添加辅助分界线+控制线法、实体间的交、叉、并运算法及平剖面图联合法,建立了金川矿床四个矿区主矿体的实体模型;(3)研究并提出了建立块模型、品位模型详细流程图,分析了建立金川矿床主矿体块模型和品位模型的可行方案,建立了金川矿床主矿体的块模型和品位模型。

第3/33页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Chrysanthemum of 10 thousand birthday is lax to edaphic requirement, with the arenaceous qualitative loam with fecund, good drainage had better.

万寿菊对土壤要求不严,以肥沃。排水良好的砂质壤土为好。

He unstepped the mast and furled the sail and tied it.

他拔下桅杆,把帆卷起,系住。

Therefore, positively advances the interest rate marketability reform is one of current our country finance reform important tasks.

因此,积极推进利率市场化改革是当前我国金融改革的重要任务之一。