英语人>网络例句>支撑梁 相关的搜索结果
网络例句

支撑梁

与 支撑梁 相关的网络例句 [注:此内容来源于网络,仅供参考]

The other two folding beams are designed to ensure the inertial mass to move in one direction.

该开关采用倾斜微梁支撑敏感质量块,两折叠梁固定于质量块的上下表面,保证开关动作的方向性。

Continuous deck for the roadway,but if the bridge were cut in two at the point of closure each cantilever would support itself.

梁在其闭合点断开,那么每一根悬臂梁都不需另外设置支撑而可保持稳定。

May 3. I began with my Saw, and cut a Piece of a Beam thro', which I thought held some of the upper Part or Quarter-Deck together, and when I had cut it thro', I clear'd away the Sand as well as I could from the Side which lay highest; but the Tide coming' in, I was oblig'd to give over for that Time.

五月三日我动手用锯子锯断了一根船梁。我猜想,这根船梁是支撑上面的甲板或后面的甲板的。船梁锯断后,我尽力清除旁边积得很高的泥沙。但不久潮水开始上涨,我不得不暂时放弃这一工作。

Based on construction of steel roof truss of the Cultural Center project in Dalian Development Zone,construction scheme of high altitude assembly was adopted according to comparison and analysis of two schemes.

结合大连市开发区文化中心工程C区钢屋架结构的施工,通过两种施工方案比选分析,确定采用空中散拼的施工方案,并详细阐述了屋架双曲面钢箱梁安装顺序和施工工艺,同时介绍了箱梁、菱形节点块和屋架支撑杆的手工焊接工艺,采用超声波探伤进行内部缺陷的检验,并测量轴线与标高和下挠值。

The circular horizontal rotating platform of a phonograph on which the record is placed.

支架一根水平的起支撑作用的梁子或木棍,用两对叉开的支脚支撑

A model of continuous beam with spring supports is put forward to analyse time-dependent structural systems.

针对施工期现浇钢筋混凝土结构的时变性,定义楼板刚度与模板支撑的刚度比为施工时变结构体系的弹性特征值,建立了以施工时变结构体系弹性特征值为参数的现浇钢筋混凝土结构施工受力性能分析的弹性支撑连续梁模型,基于该模型,分析了施工期现浇钢筋混凝土结构的受力特性,发现在特定施工方案下,当施工时变结构体系的弹性特征值较小时,最大施工荷载出现的楼层位置会提前,而拆模时间也会改变最大施工荷载出现楼层的位置;施工时变结构体系的弹性特征值和拆模时间都影响楼层承担的最大施工荷载比率(荷载比率定义为结构承担荷载与楼板自重的比值);施工期楼层承担的最大施工荷载随楼层位置呈现波动特性,随楼层位置增高波幅逐渐减小,最后趋于稳定。

Based on the results of experimentation and field test as well as the properties of time-dependent structural system, a model of the continuous beam with spring supports for simulating the high-rise concrete building during construction was proposed.

根据室内试验和现场实测的结果,结合施工时变结构的受力特点,针对梁板柱体系混凝土结构,本文建立了施工时变结构体系分析的弹性支撑连续梁模型CBSS(Continuous Beam With Spring Supports),提出了基于弹性支撑连续梁模型CBSS的高层建筑混凝土结构施工过程受力性能的仿真分析方法。

In this paper,the superelevation of the No.2 light rail line in Chongqing is statisticed and classificated.Both of adjustment method-laminated design and varying-height support design are studied.

本文对重庆轨道交通二号线的超高进行了统计分类,提出并研究了两种应急梁调整超高的方法--叠片设计和变支撑高度设计,通过分析采用后者作为应急梁调整超高的最终方案。

The device includes a beam; at least one beam support mounted on the beam; a sensor assembly slidably connected to said beam and adapted for measuring the distance to the surface; and a transducer assembly adapted for measuring the position of said sensor assembly along said beam.

该装置包括:梁;至少一个梁支撑件,其安装在所述梁上;传感器组件,其与所述梁可滑动地连接并且适合于测量与所述表面的距离;以及变换器组件,其适合于测量所述传感器组件沿着所述梁的位置。

Then, the construction techniques of R.C girder transfer floor in high-rise buildings are systematically investigated, three important item about construction of transfer floor: the form board and the carriage system, the joining and colligation of reinforcing steel bars, the casting of large volume concrete are partially analyzed and studied, otherwise, the design principle of the supporting system, the main point on connection of the reinforcing bar and the crack control measures of mass concrete are proposed.

然后,系统的研究了高层建筑钢筋混凝土梁式转换层的施工技术,重点对梁式转换层施工的三大分项:模板和支撑体系、钢筋的连接和绑扎、大体积混凝土的浇筑进行了分析和研究,并提出了支撑体系的设计原则,钢筋的连接要点和大体积混凝土裂缝的控制措施。

第2/8页 首页 < 1 2 3 4 5 6 7 8 > 尾页
推荐网络例句

The big eared hedgehog, the little owl, the sand gecko, the three-toed jerboa, and every show needs a villain - saw-scale - the viper!

大耳刺猬,小猫头鹰,沙壁虎,三趾跳鼠,每场戏都需要反派角色:蝰蛇。

Plasmodiophora brassicae ; resting spores ; density gradient centrifugation of sucrose ; ultrasonic disruption

根肿;休眠孢子;蔗糖密度梯度离心;超声波破碎

Article 14 After the death of an employee or retiree, the balance of his individual enterprise annuities account shall be drawn out in a lump sum by the beneficiary or legal heir designated by him.

职工升学、参军、失业期间或新就业单位没有实行企业年金制度的,其企业年金个人帐户可由原管理机构继续管理。