英语人>网络例句>work area 相关的网络例句
work area相关的网络例句

查询词典 work area

与 work area 相关的网络例句 [注:此内容来源于网络,仅供参考]

Optimally, the size of a work area is big enough such to accommodate the input data and auxiliary memory structures allocated by its associated SQL operator.

最理想的情况是,工作区能够容纳 SQL 语句的全部输入数据及额外的控制内存结构。

To maintain a good working environment and cleanliness of work area, 5S.

保持良好的工作环境及工作区域的整洁,5S。

Clean kitchen equipment, cooking utensils and work area.

清洁厨房设备、烹调工具和工作区。

You will be able to work faster because the CopperHead XD sets grade automatically, allowing the operator to move quickly and efficiently through the work area.

您将可以更快地工作,因为铜斑蛇微型自动套级,使运营商能够通过移动工作区速度和效率。

It shall include a review of Contract requirements; a check to assure that all materials and/or equipment have been tested, submitted, and approved; a check to assure that provisions have been made to provide required control testing; and plan mock ups when appropriate; examination of work area to ascertain that all preliminary work has been completed; and a physical examination of materials and equipment to assure that they conform to approved shop drawings or submittal data and that all materials and/or equipment are on hand.

这应包括对合同要求的审核;确保所有材料和/或设备都已经过试验、提交和批准的检查;确保已提供了要求的控制试验的检查;适当时,对模型进行规划;对工作区域进行检查,以确认已完成了所有预备工作;对材料和设备一的次物理检验,以确保符合经批准的施工图纸或提交数据且已获得所有材料和/或设备。

In the period of aerodrome constmction project geology recottitaissance, high-resolution ortho-map of working area, 3D Remote Sensing Virtual Reality and animation o planned aerodromes are made with the technologies of Remote Scttstng digital image process, Virtual Reality and digital photogrammetry. By information extracting and comprehensively assessing on the geognosy, engineering geology, environment geology and eco-environment of work area, scientific foundation can be offered to deciders and workers of acrodrome.

在机场建设工程地质勘察中,应用&3S&技术,通过遥感数字图像处理技术、虚拟现实和全数字摄影测量等高科技,制作测区的高精度正射遥感影像地图以及各个拟选机场的遥感图像三维虚拟动态系列动画图,在此基础上进行场区的构造地质、工程地质、环境地质以及生态环境等特征信息提取和综合评价,为机场建设工程决策者和具体的工作者提供科学依据。

In the period of aerodrome construction project geology reconnaissance, highresolution orthomap of working area, 3D Remote Sensing Virtual Reality and animation of planned aerodromes are made with the technologies of Remote Sensing digital image process, Virtual Reality and digital photogrammetry. By information extracting and comprehensively assessing on the geognosy, engineering geology, environment geology and ecoenvironment of work area, scientific foundation can be offered to deciders and workers of aerodrome.

在机场建设工程地质勘察中,应用&3S&技术,通过遥感数字图像处理技术、虚拟现实和全数字摄影测量等高科技,制作测区的高精度正射遥感影像地图以及各个拟选机场的遥感图像三维虚拟动态系列动画图,在此基础上进行场区的构造地质、工程地质、环境地质以及生态环境等特征信息提取和综合评价,为机场建设工程决策者和具体的工作者提供科学依据。

Wetting down the work area in order to minimize the potential fire/ignition risk prior to the execution of hot-work.

water hose动火作业执行前,将工作区域淋湿,使潜在的火灾/点燃风险降到最低。

This design is the Guangzhou lan west 100 markets summer the central air-conditioning system design, the primary mission completes one, two, three, four buildings load computation; Air-conditioning system plan efficient analysis and water unit's shaping; The air-conditioning system freezing stands design; Four buildings shopping area air conditioning unit's shaping, wind system and aqueous system design; Four buildings work area air blower plate tube system design; And has drawn up four winds tubes floor-plan, the wind side chart, the engine room floor-plan, the aqueous system axis side chart.

本次设计课题是广州市蘭西一百商场夏季中央空调系统设计,主要任务是完成一、二、三、四楼的冷负荷计算;空调系统方案的经济性分析和制冷机组的选型;空调系统冷冻站的设计;四楼购物区空调机组的选型,风系统和水系统的设计;四楼办公区风机盘管系统的设计;并绘制了四层风管平面布置图、风管轴侧图、机房平面布置图,水系统轴侧图。

This design is the Guangzhou lan west 100 markets summer the central air-conditioning system design, the primary mission completes one, two, three, four buildings load computation; Air-conditioning system plan efficient analysis and water unit's shaping; The air-conditioning system freezing stands design; Four buildings shopping area air conditioning unit's shaping, wind system and aqueous system design; Four buildings work area air blower plate tube system design; And has drawn up four winds tubes floor-plan, the wind side chart, the engine room floor-plan, the aqueous system axis side chart.

该下载资料由本站会员上传,如果侵犯了您的权力,请通知我们,将立即删除!摘要本次设计课题是广州市蘭西一百商场夏季中央空调系统设计,主要任务是完成一、二、三、四楼的冷负荷计算;空调系统方案的经济性分析和制冷机组的选型;空调系统冷冻站的设计;四楼购物区空调机组的选型,风系统和水系统的设计;四楼办公区风机盘管系统的设计;并绘制了四层风管平面布置图、风管轴侧图、机房平面布置图,水系统轴侧图。

第2/57页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Chrysanthemum of 10 thousand birthday is lax to edaphic requirement, with the arenaceous qualitative loam with fecund, good drainage had better.

万寿菊对土壤要求不严,以肥沃。排水良好的砂质壤土为好。

He unstepped the mast and furled the sail and tied it.

他拔下桅杆,把帆卷起,系住。

Therefore, positively advances the interest rate marketability reform is one of current our country finance reform important tasks.

因此,积极推进利率市场化改革是当前我国金融改革的重要任务之一。