英语人>网络例句>underground 相关的网络例句
underground相关的网络例句

查询词典 underground

与 underground 相关的网络例句 [注:此内容来源于网络,仅供参考]

The actual number of samples taken was 41 in development, 17 in the mining team, 10 in underground maintenance, 2 in underground transport, 10 in the washing plant, 10 in ash and cinders, 6 in boiler and turbine, and one in each of administration and electricity.

拿取的样品的实际数量是41在开发中, 17在采矿队, 10在地下维护, 2在地下运输, 10在洗涤的植物中, 10在灰和炭渣, 6在锅炉和涡轮和一个在其中每一管理和电。

Underground commercial building is the developing trend of our underground space, and it is the best way of settling the city's confliction.

地下商业建筑是我国未来地下空间发展的趋势,是解决城市矛盾的最佳途径。

As to the large and complex underground caves, the stability problem of wall rock during the process of underground cave's excavating is connected with the constructible cost and management benefit of the whole power station project.

大型复杂地下洞室在开挖过程中的围岩稳定问题关系到整个水电站工程的建设成本和运营效益,是一个值得深入研究的问题。

The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme

主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。

The stability of underground tunnel is very important in the design and excavation of underground engineering.

地下洞室稳定性是地下工程设计和施工中遇到的主要问题之一,也是岩石力学研究的重要课题。

Magnetic Resonance Sounding is the only geophysical new method of directly detecting underground water at present. In this paper the main gains of taking part in the 2nd MRS international workshop are introduced, development and progress of hydroscope and applications of MRS method are considered. On the basis of the MRS successful application in the detection of underground water, using MRS method new progress has been made in slide monitoring of Three Gorges and archeology of the first Qin dynasty imperator mausoleum for the first time.

第二届核磁共振测深国际学术研讨会概况《第二届MRS在地下水勘查中的应用》国际学术研讨会2003年11月19日~21日在法国奥尔良召开。1.1 第二届MRS 研讨会的主题研讨会的主题是:对地表下含水层MRS响应模拟;数据处理和反演;野外工作对策;数据采集和质量控制方面的经验;MRS和其它地球物理资料的综合应用和解释;MRS资料的校正和确认问题;含水层几何形状和水动力学性质特征;开发MRS 方法的前景。

Feedback iteration method need not any information of underground interfaces and is adaptable to complex underground structures.

反馈迭代法不需要地下界面信息,能够适应较复杂地下结构的情况。

In order to enhance the people's shopping enthusiasm in underground space and increase their comfort and jollity, a series of optimization measures for improving the underground interior environment have been put forward with reference to some overseas project examples.

在增加地下商业步行街的舒适性、愉悦性和吸引力方面做了诸多尝试,有一定的参考意义。

For the moment does not say the subterranean economy of other industry, say should pure be taught loftily, in educational industry of China economy of underground of nonexistent similar Internet such educational underground economy?

暂且不说其它行业的"地下经济",就说应该纯洁高尚的教育吧,中国的教育行业中不存在类似"互联网地下经济"这样的"教育地下经济"吗?

According to an on-site measurement of the impact of underground rail trains motion vibration on the place where the odeum is to be constructed,it shows that the maximum vibration impact of the underground rail train on the constructing site is 41~48 dB.

现场测量了地铁列车运行振动对拟建音乐厅场址的环境影响,结果表明地铁对该场址的振动影响最大为41~48dB,频谱特性集中在16~63Hz范围内;同时预测了音乐厅建成后,室内受地铁列车运行振动产生的二次空气声影响将达29~30dB,将超过预定的25dB控制目标值。

第4/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Summer On The Underground
All Night Dance Parties In The Underground Palace
Living On The Underground
Life Underground
Underground Network
Underground Killa$
Underground Rapstar
6 Feet Underground
Hold Me Close (Underground)
Walking In The Underground
推荐网络例句

It goes back to what I told you...

现在回到我告诉过你的。。。

With a supporter in Mr Charest and an admirer in Mr Dumont, Mr Harper may be encouraged to call an election himself.

由于在沙雷那边有个支持者,杜蒙那边有个崇拜者,鼓励哈珀为自己举行一次选举。

Come to a "Chronicle" in.

来个"纪事"的。