英语人>网络例句>top cap 相关的网络例句
top cap相关的网络例句

查询词典 top cap

与 top cap 相关的网络例句 [注:此内容来源于网络,仅供参考]

Cap line: The top framework line for constructing the capital letters. Many designs choose that the ascender line to be their cap line as well.

在句译、词译中专业词汇在线翻译、专业词典词汇的双语例句以及中英文、英汉句子翻译。

A brimless Scottish cap with a flat, round top .Seminary Ridge, the Peach Orchard, Cemetery, Culp, and Wolf Hill, Round top , Little Round top , humble names, henceforward dear and famous no lapse of time, no distance space, shall cause you to be forgotten.

还有神学院所在的山脊、桃园、公墓、卡尔普以及狼山、圆顶的山庄小小的土坡,……所有这些默默无闻的地名,从今以后将名闻遐迩,令人向往——无论时隔多长,无论相距多远都不会被人遗忘。

The sail top cap is being worked on to achieve a more scale appearance adding the cubby hole and scope cutouts.

船帆的顶端上限是正在进行这项工作,以实现一个更大规模的外观加入cubby洞和范围开孔。

The cap was based on Bericap standard design SK40/24 PV with customized knurl finish and embossment with CA star or Chevron logo on top of the cap.

上限是根据百利盖标准设计SK40/24光伏定制隆起完成和浮雕与CA明星或雪佛龙标志上方帽。

According to this problem,the blast-cap construction of Anyang Iron and Steel Company's 200 m3 lime-shaft-kiln was renovated by means of opening holes at the top of the blast-cap for air to flow in to eliminate or control the center engulfment.

针对这一问题,对安阳钢铁公司200 m3竖炉石灰窑的风帽结构进行了改造,采用的措施是在风帽顶部开孔打通中心气流,目的是消除或抑制竖炉石灰窑的中心卷吸。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

What you will need: an old CD, several different sized balloons, a pop-top cap from a drinking bottle, glue and a stopwatch.

实验所需:一张旧光碟片、几个大小不同的气球、一个吸嘴瓶、胶水和计时码表。

Valve cap is the top of the workpiece is an important component, and as pressure parts for the body to provide a cap or lid.

阀帽是顶部工件的一个重要元件,并作为承压零件为阀体提供了帽或盖。

Major production and processing Golf hat: golf cap, for men and women along the empty big top hat, headband hat, fisherman hat, golf CHILDREN CAP, etc..

主要生产和来料加工高尔夫系列帽:高尔夫球帽,男女空顶大沿帽,头箍帽,渔夫帽,高尔夫球童帽等。

第1/7页 1 2 3 4 5 6 7 > 尾页
推荐网络例句

Objective To investigate the effects of interleukin-1 β converting enzyme gene on the biologic characteristics of ovarian cancer cells.

目的 探讨白细胞介素-1 β转换酶的表达,对卵巢癌细胞生物学特性的影响。

Campylobacter: This illness is the most commonly identified cause of diarrheal illness in the world.

弯曲:这种病是最常见的原因查明腹泻病,在世界上。

Gangs fill the daily lives of many of our poorest and most vulnerable citizens with a terror that the court does not give sufficient consideration, often relegating them to the status of prisoners in their own homes.

法院没有充分的考虑到黑社会的猖獗所带来的恐怖,这使得我们最穷、最可怜的市民每天生活在他们的阴影当中,成为在家的囚犯。