英语人>网络例句>shuttle loading 相关的网络例句
shuttle loading相关的网络例句

查询词典 shuttle loading

与 shuttle loading 相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper discusses the problems met in static test as the setting of datum line beam and reference stake,compaction of main beam by jack,loading side test,and quick and slow loading method,in order to ensure scientificity and accuracy of static test data,and to improve the quality of pile foundation detection and the reliability of detection evaluation result.

对基准梁与基准桩的设置、主梁压实千斤顶、边堆载边试验、慢速与快速加荷法等静载试验中遇到的问题进行了探讨,以保证静载试验数据的科学性和准确性,从而提高了桩基检测工作的质量和检测评定结果的可靠性。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

第11/50页 首页 < ... 7 8 9 10 11 12 13 14 15 ... > 尾页
相关中文对照歌词
Life's Zombies
Across The Line (Unreleased 2007 Demo)
Across The Line
Believe Me
Next Level
The DFLO Shuttle
No Gravity
Christmas For Every Boy And Girl
License
Heartless Remix
推荐网络例句

Check dri ve seating, cables, and I/O module.

请检查驱动器安装、电缆和 I/O 模块。

If there's no traffic jam, I think it's OK.

如果不塞车的话,我想能行。

Increased long-distance air travel facilitates the movement of infected persons and exotic arthropod vectors around the world.

距离延长的空中旅行对于感染者与外来的节肢动物媒介在全世界的移动创造有利条件。