英语人>网络例句>scheme 相关的网络例句
scheme相关的网络例句

查询词典 scheme

与 scheme 相关的网络例句 [注:此内容来源于网络,仅供参考]

The incorporated model is evaluated by simulation results of two different building aerodynamical scheme in southeast region of Beijing area, which are building drag scheme and aerodynamical urban canopy scheme. The conclusions are drawn by the comparisons between the simulation results of the wind speed and the observations of the automatic weather stations in the urban areas: the simulated results of incorporated model are more in reasonable agreement with the observations than that of building drag scheme, and the diurnal trend of that is more agreement with observations.

采用建筑物拖曳法和建筑物动力冠层方案两种不同建筑物动力学处理方法对北京地区东南部进行模拟,通过城市地区水平风速的模拟结果与自动气象站实测资料对比发现模拟结果与实测相当吻合,建筑物动力冠层方案的引入能够更好地实施对城市地区的水平风速分布的数值模拟。

So in this paper based on the characteristics and the optimum state theory of the vehicle, some kinds of control schemes are compared and discussed, and the fuzzy PID control scheme is adopted at last. The relation between air-cushion pressure and fan rotational speed on the optimum driving state is studied. The cushion pressure is used as controlled variable and the fan revolution is used as regulated variable. And transducer and fan motor are actuators.Based on the structure and operating properties of half-tracked air-cushion vehicle, the control system scheme and structure are presented. A control scheme using the self-tuning PID fuzzy logical controller is adopted. Fuzzy rules are set up and some researches have been done for fuzzy tuning method. At the same time the real-time measurement scheme by computer control is proposed, and electric circuits are designed. In the control system of half-tracked air-cushion vehicle cushion pressure P〓 is used as controlled variable and the fan speed n〓 as regulated variable.

因此本文以半履带式气垫车的特性和最佳工作状态理论为指导,通过对各种控制方法的比较与探讨,提出采用模糊PID控制方案,并且研究了在最佳工作状态下垫压及风机转速的关系,提出气垫压力作为控制参数,变频器和风机电机为执行机构,风机转速为调节量;主要进行了自整定模糊PID控制器的设计,研究了自整定PID模糊控制器的实现方法,编制了模糊控制规则,制定了模糊控制参数查询表,并分析了影响自整定模糊控制器相关的影响因素,确定了模糊控制表;为了实现半履带式气垫车的自动控制,还提出了计算机模糊控制系统的原理与结构,设计了相应的测量电路与控制软件。

In order to get the numerical solution, the paper devises a three hierarchic implicit scheme which eliminates the strict restriction of explicit scheme, thus, it can be used in more areas. By using the energy estimation method, the convergence and stability of the difference scheme are proved and the scheme is second order convergence for time and space.

对求解方程构造了一个三层隐式差分格式,消除了显格式的稳定性对计算步长的严格限制,使之适用范围更广,并用能量估计的方法严格证明了差分格式的收敛性与稳定性,该格式对于时间和空间均具有二阶收敛性。

Topics covered include: programming and computability theory based on a term-rewriting,"substitution" model of computation by Scheme programs with side-effects; computation as algebraic manipulation: Scheme evaluation as algebraic manipulation and term rewriting theory; paradoxes from self-application and introduction to formal programming semantics; undecidability of the Halting Problem for Scheme; properties of recursively enumerable sets, leading to Incompleteness Theorems for Scheme equivalences; logic for program specification and verification; and Hilbert's Tenth Problem.

其所包含的主题:程序和运算理论是基于根据算数和具有一些副作用的计划纲要的条款重写和"代入"模式之上的、关于代数学计算的算数:关于代数学计算和术语重写理论的评价方案作计划、应用程序自己和说明的自相矛盾到形式上的程序语义、关于计划Halting 问题的不可判定性、可递归可列举集合的属性、导致对于等同计划的不完整规则、对于逻辑和证明程序的规范和Hilbert的第十问题。

A new scheme for approximating the solution of 2D Maxwell's equations-the high order symplectic scheme is proposed to overcome the shortcoming of the conventional finite difference time domain. The scheme is obtained by discretizing the Maxwell's equations in time domain based on symplectic scheme with high order, and then evaluating the equation in spatial domain with second or fourth order finite difference approximation.

为克服标准时域有限差分方法的缺陷,引入一种新的数值计算方法-高阶辛算法求解Maxwell方程,即在时间上用高阶辛差分格式离散,空间分别采用二阶及四阶精度的差分格式离散。

The DH protocol, ElGamal encryption and ElGamal signature scheme, DSA are extended to Hypereliptic curves, and a new message recovery signature scheme based on Hyperelliptic curves is presented. And it is proved that this new message recovery signature scheme is not strong equivalent to HC-ElGamal signature scheme.

将DH协议、ElGamal加密体制、ElGamal签名和DSA推广到了HC上,提出了一个基于超椭圆曲线的消息恢复签名方案,并证明了这个消息恢复签名方案与HC-ElGamal签名方案不是强等价的。

In this paper, a high order accuracy difference method is presented for solving unsteady convection diffusion equation by using Implicit Perturbation Finite Difference scheme. Firstly, we use the steady convection diffusion equation, the constant coefficients of this equation are expanded to power series of grid-spacings, then the high-order Perturbation Finite Difference scheme is obtained by determining the coefficients of the power series. Put this scheme on unsteady convection diffusion equations and modified it, the IPFD scheme is constructed.

本文利用摄动差分思想,对定常对流扩散方程中的空间微商系数进行摄动展开,展开幂级数系数通过消去摄动格式修正微分方程的截断误差项求出,由此获得方程的隐式摄动差分格式,将此方法应用于非定常对流扩散方程,并加以修正,得到该方程的修正隐式摄动差分格式。

The results show that the KPW scheme is not a nominative signature scheme since the nominator not only can verify and prove the validity of given signatures but also can convert given signatures into universally verifiable signatures, and that the PL scheme is only a self-authentication signature scheme since anyone can verify the validity of given signatures.

摘要该文分别对一个指名签名方案和一个指名代理签名方案进行分析,结果表明:在KPW方案中签名人不仅能验证而且也能向第三方证明签名的有效性,甚至能将签名转化为通常的自认证签名,因此不是指名签名方案;在PL方案中任何人都可验证签名的有效性,它只是一个自认证签名方案。

According to the computational stability analysis conducted to the linear term time difference scheme in simple harmonic motion equation, one new semi-implicit integration scheme also is designed. By adopting a kind of revised time-explicitdifference scheme to these linear terms still included in spectral model governing equations, this defect of spectral model only partly used in semi-implicit integrating scheme, can be overcome to some degree.

以简谐振动方程中线性项时间差分格式对其计算稳定性影响为理论依据,本文设计了一种新谱模式半隐式时间积分方案,此方案通过对一般谱模式求解框架中那些隐含的线性项采用了一种显式修正的差分格式,可有效克服其国际谱模式半隐式时间求积方案实质上只是部分应用了半隐式差分格式的问题。

The ratio of the vertical load distributed between the arch rib and the tie beam of the two schemes is the same. For the integral girder deck scheme, the longitudinal beams and the deck slab of endure more axial force compared to the ballast girder deck scheme, especially to the deck slab with a conspicuous increase of the axial force and higher stress, and the tie beam endure less. The force-bearing characteristics of the cross beams under the integral girder deck scheme is obviously better than that of the ballast girder deck scheme, especially at the two ends of each cross beam.

在受力上,与道碴板桥面方案相比,整体桥面方案竖向荷载在拱肋和系梁之间的分配基本相同,混凝土板和纵梁分担的纵向力则相对更大,尤其是混凝土板,增幅较明显,应力水平整体较高,系梁分担的纵向力则得到减小,横梁的受力状况整体桥面方案明显优于道碴板桥面方案,特别是在梁端处。

第2/50页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
My Scheme
Diabolic Scheme
Love's Subtle Scheme
Joan
Word On A Wing
Money Scheme
Different Kind Of Free
American Tale
Dashboard
Hypocrites
推荐网络例句

The French are not suggesting a new EU treaty, but they have plenty of other wheezes.

法国人并不是在建议签署一个新的欧盟条约,但他们有许多其他的阴谋。

This letter was written by my brother.

这封信是我弟弟写的。

Kazan Helicopters supplies helicopters for export since 1956, and has vast experience in supporting their production abroad.

卡赞直升机公司从1956年起开始出口直升机,并且在支持国外的直升机生产方面有着丰富的经验。