英语人>网络例句>scheduling problem 相关的网络例句
scheduling problem相关的网络例句

查询词典 scheduling problem

与 scheduling problem 相关的网络例句 [注:此内容来源于网络,仅供参考]

In this research field, it is a none-standard Job Shop Scheduling Problem.

在该研究领域里,它属于非标准型的的作业车间调度问题。

The search on job shop scheduling problem has very important value in theoretical significance and application value.

因而,本文对车间作业调度问题的研究有很重要的理论意义和实用价值。

This paper presents an efficient optimization algorithm and complicated code for Airciraft Landing Scheduling Problem,Based on Depth-first-search implicit emumeration algorithm,subject to MPS limiting,position lock limiting and optimization depth limiting.

以深度优先搜索的隐枚举算法为基础,结合 MPS约束、位置冻结限制、优化深度限制,使用复杂的软件编码实现了特定于飞机着陆调度问题的优化排序算法。

The state set is constructed based on the characteristics of re-entrant lines, and the scheduling problem is described as the corresponding Markov decision process.

根据可重入生产系统的特点建立状态集,并将调度问题表示成相应的马尔可夫决策过程。

By analyzing the characteristics of products and the production in mass customization,we discussed the modular group scheduling problem,and presented a heuristic method for minimizing the weighted tardiness.The method involved the identification of bottleneck operation,and the optimization of both of the production cost and the delivery performance.

基于对大规模定制生产模式的产品与生产特征的分析,描述了面向大规模定制的模块工件成组调度问题,提出了以识别瓶颈工序为基础的最小化加权拖期成组调度启发式方法,实现了生产成本与交货期的优化。

It presents a new hybrid genetic algorithm to solve the tasks scheduling problem in parallel multiprocessor systems.

针对并行多处理器系统的任务调度问题,提出一个新的混合遗传算法。

We mainly deal with the batch scheduling problem with nonidentical job size to minimize the total completion times.

本文主要对带尺寸的分批排序极小化完工时间和的问题进行了研究。

In this paper, we studied cyclic scheduling problem of the crane in double lines for fixing oilcan, where products are loaded into the system at one end and unloaded at the other end.

本文研究了产品在系统的一边装载、而在另一边卸载的双油罐修理线的天车周期性排序问题。

In this paper, we study cyclic scheduling problem of the crane in single line for fixing oilcan, where products are loaded into the system at one end and unloaded at the other end.

本文研究了产品在系统的一边装载、而在另一边卸载的油罐单修理线的天车周期性排序问题。

From several aspects described os operations scheduling problem.

从好几个方面描述了os的作业调度问题。

第7/16页 首页 < ... 3 4 5 6 7 8 9 10 11 ... > 尾页
推荐网络例句

Cynanchum Lingtai apricot production in the average weight 65 grams, the brightly-colored fruit, juicy rich, sweet-sour taste, sweet from the nucleolus, when the late Qing Dynasty famous Shaanxi, Gansu provinces, the Qing imperial court Tongzhi tribute for years.

灵台生产的牛心杏平均单果重65克,果实色泽鲜艳,汁多味浓,甜酸适口,离核仁甜,清末时就驰名陕、甘两省,清同治年间曾为朝廷贡品。

Chenopodium album,Solanum nigrum, and Amaranthus retroflexus were very susceptible to the herbicides. Polygonum persicaria and Abutilon theophrasti were relatively less susceptible to the herbicides, and Lycopersicon esculentum was not susceptible to it. The relationship between reduction rates of weed biomass and PPM values of weed leaves 2,4, and 6 days after treatment was established.

供试的6种杂草对该混剂的敏感性存在显著差异:红心藜Chenopodium album、龙葵Solanum nigrum和反枝苋Amaranthus retroflexus对该混剂最敏感,ED90值分别为47.65、71.67和29.17g/hm2;春蓼Polygonum persicaria和苘麻Abutilon theophrasti敏感,ED90值分别为96.91、114.20g/hm2;而番茄不敏感。

However, I have an idea.

不过,我有个主意。