英语人>网络例句>satisfies 相关的网络例句
satisfies相关的网络例句

查询词典 satisfies

与 satisfies 相关的网络例句 [注:此内容来源于网络,仅供参考]

When fitness satisfies the bimodal distribution, the connectivity distribution of the network satisfies a generalized power-law form.

当Fitness服从一个双模分布时,网络的度分布是一个广义的幂律形式;当Fitness服从均匀分布时,网络的度分布是一个带有对数修正的广义的幂律形式。

It is proved that a wrpp semigroup satisfies a permutation identity if and only if it satisfies the identity xyzw= xzyw.

证明了wrpp半群满足置换恒等式当且仅当它满足恒等式xyzw=xzyw。

He will perhaps say that what justifies punishment is that it satisfies a popular demand and explain that it is good that it satisfies this demand because if it did not there would be disorder in society, disrespect for the law, or even lynching.

他可能会说,证明惩罚的正当性的是,它满足了大众的要求(甚至可能是对报复的要求),并解释说,满足这种要求是善的,因为如果不这样,就会造成社会秩序的混乱、对法律的不尊重乃至私刑。

Of the fundamental matrix in (2) satisfies the differential equation =A , it follows that the matrix = itself satisfies the matrix differential equation Because its column vectors are linearly independent, it also follows that the fundamental matrix is nonsingular, and therefore has inverse matrix .

基本矩阵的求解由于(2)中的基本矩阵的列向量满足微分方程A,进而这个矩阵本身就满足矩阵微分方程。

And by granting it He not merely satisfies our natural desire for happiness but He satisfies it in superabundance.

并通过授予他,它不只是满足了我们的自然渴望幸福,但他满足,它在superabundance 。

It introduces a kind of novel loading test system, based on the operation principle of damper. this loading system is operated by the driving motor. it realizes the loading, in that the damper has a negative drive force that puts on the motor. Based on the ordinary electromagnetic damper, the thesis presents a novel hybrid excitation electromagnetic damper which has adjustable work characteristic, analyses the working principle and structural feature of the electromagnetic damper, deduces the formulas to calculate the eddy current density through the Electromagnetic theory, analyses the distribution of the eddy current in the cotyloid rotor, and also studies the method of calculating the damp torque, establishes the mathematical model of the electromagnetic damper, analyses the relationship between the electromagnetic damper structural parameter and damp torque, researches the engineering design and analysis method of the electromagnetic damper, provides theory foundation for the design and analysis of the electromagnetic damper, contrives a hybrid excitation electromagnetic damper that satisfies the target request, designs a set of compound excitation electromagnetic damping loading control system whose control core is AT89C51 monolithic integrated circuit, analyses the electric circuit part, and carries on the experimental test to this set of electric circuits. Finally it debugs this electromagnetic damping loading system, this system satisfies the target request proposed.

论文提出了一个全新的加载测试系统种类,该加载系统是在阻尼器工作原理基础上,利用电动机拖动阻尼器运转,从而阻尼器产生一个与运动方向相反的阻尼力矩,该力矩作用在电动机上实现对电动机加载测试;同时,论文在一般电磁阻尼器基础上提出了一种新型的可调式复合励磁电磁阻尼器结构,该种阻尼器的工作特性在一定范围内可进行调节;论文分析了电磁阻尼器的工作原理和结构特点,运用电磁场理论分析推导了电磁阻尼器的涡电流密度公式,分析了涡电流在转子杯内的分布图,并对阻尼力矩计算方法进行了研究,建立了电磁阻尼器的数学模型,分析了电磁阻尼器结构参数和阻尼力矩之间的关系,对电磁阻尼器的设计和分析方法进行了研究,为电磁阻尼器的工程设计建立了理论基础;设计了满足技术指标要求的复合励磁电磁阻尼器和一套以AT89C51单片机为控制核心的复合励磁电磁阻尼加载控制系统,对该控制系统硬件电路各部分进行了分析和设计,对软件进行了设计,并对控制电路进行了试验调试,该系统满足所提出的加载指标要求。

Above transaction protocol satisfies accountability Above transaction protocol dissatisfies fairness Based on the result, the author puts forward a complete transaction protocol that satisfies accountability and fairness.

通过对模型的仿真分析,证明了:③的支付协议满足可追究性③的支付协议不满足公平性根据结果,作者提出了同时满足可追究性和公平性的完善的支付协议。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Based on the research, this dissertation has studied the M/G/1 and GI/GI/1 queueing systems, and drew the following conclusions: Firstly, we present the equation which satisfies the transient distribution of the lengthof L(T,θ1,θ2 for GI/G/1 queueing systems, and proves that the lengthL(t,θ1,θ2 for GI/G/1 queueing systems satisfy two types of equation, and aretheir minimal nonnegative solutions. Furthermore, we give out not only the expression of Laplace transformation, but also the expression of Laplace transformation of busy-idle period, as well as the equation that satisfies the waitingtime of W

第一,首先给出了GI/GI/1排队系统队长L(t,θ_1,θ_2的瞬时分布所满足的方程,证明了GI/GI/1排队系统队长L(t,θ_1,θ_2的概率分布满足二种不同方程,并且是这些方程的最小非负解,进一步给出了其拉氏变换的表达式,还给出了闲忙周期的拉氏变换的表达式,同时对等待时间W(t,θ也作了同样的处理。

第1/42页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

But in the course of internationalization, they meet with misunderstanding and puzzlement.

许多企业已经意识到了这一点,但在国际化的进程中,仍存在一些误区与困惑。

Inorder toaccomplish this goal as quickly as possible, we'll beteamingup with anexperienced group of modelers, skinners, and animatorswhosenames willbe announced in the coming weeks.

为了尽快实现这个目标,我们在未来数周内将公布与一些有经验的模型、皮肤、动画制作小组合作。

They answered and said to him, Are you also from Galilee?

7:52 他们回答他说,难道你也是出于加利利么?