查询词典 performance test
- 与 performance test 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
For the testing device defects of the existing disposable vaginal dilator,its structure was improved and innovated,it can be easily test "D value","deflection" and "strength"-these three must test performance indicators.
针对现有的一次性阴道扩张器的检验装置的缺陷,对其结构进行改进创新,可简单易行地对"D值"、"挠度"和"强度"三个必检性能指标进行检验。
-
The paper mainly introduces study and test on PIN Semiconductor of the SDM2000 Personal Dosimeter. Test result proves that the performance is good.
以SDM2000个人剂量仪为例,针对个人剂量仪的特点,对PIN半导体探测器在个人剂量仪中的应用进行了研究,并进行了详尽的性能测试,取得了较好的结果。
-
Such as the use of the end clamp test device, the valve manufacturer should be able to confirm the test device does not affect the pilot valve sealing performance.
如使用了端部夹紧试验装置,阀门制造厂应能证实该试验装置不影响被试验阀门的密封性能。
-
Particularly for industry equipments manufactory to say, the ex- period in a factory needs to process the necessary function test to the product with the performance test, if these completely depend on the artificial, the efficiency and quantity can't get to the reliable guarantee.
微控制技术与计算机的发展和普及,促使自动化测试领域发生了变革性的进步,尤其对于工业设备制造商来说,出厂前需要对产品进行必要的功能测试和性能测试,如果这些完全依赖于人工,那么效率和质量都不能得到可靠的保证。
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。来源:英语博客 http://space.englishcn.com
-
In the event of any repeat of a performance test failing for reaso imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in A endix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue retesting, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
-
First, it begins with the study of the centralized CFAR detection with multiple sensors. The non-CFAR problem is analyzed; the necessity for local CFAR processing is established. The effective local CFAR processing scheme is proposed, i.e. the local test statistic. The upper limit of the optimal performance is proved for the distributed CFAR detection based on LTS. Then, the new schemes based on LTS are analyzed in condition of signal pulse, and then the analysis is expanded to the case of multiple pulses. Next, the feedback mechanism is introduced. At last, the invariant test is used to reveal the essence of CFAR processing. It explains the necessity of local CFAR processing in the distributed CFAR detection at a higher level.
本文深入研究了这方面的问题,首先从多传感器集中式 CFAR 检测入手,分析其存在的非 CFAR 问题,论述局部 CFAR 处理的必要性,提出有效的局部 CFAR 处理方法:局部检测统计量,证明基于局部检测统计量的分布式 CFAR 检测的最优性能上限,分析基于局部检测统计量的新方案在单脉冲条件下的性能,并且进一步拓展到多脉冲非相干积累的情况,然后引入反馈机制,最后利用不变检验的概念揭示 CFAR 处理的机理,从更高的层次上解释分布式 CFAR 检测做局部 CFAR 处理的必要性。
- 相关中文对照歌词
- Performance
- Test Of Time
- Put It To The Test
- Across The Nation
- Across The Nation
- Piss Test (Interlude)
- Performance
- Test Drive
- Truth
- Test Drive
- 推荐网络例句
-
Now he worked in ajoint venture.
现在他在一家合资企业工作。
-
More troops in Afghanistan won't change any of the foregoing.
更多的在阿富汗的军队也不会改变之前的状况。
-
Your love which knows not fulfilment is dear to my heart.
你的永不满足的爱,对我的心是亲切的。