查询词典 mining engineer
- 与 mining engineer 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The association rules of the traditional data mining technique are used to mining higher appearance frequency and support for itemsets. If the association rules are applied to mining the outbreak symptom of excrescent disease, the support of partly outbreak symptom not high will be ridded during the mining process. The reason is that the number of excrescent disease patients is less than the number of ordinary patients. In addition, the outbreak symptom of excrescent disease may have the successively order of time happened, for example, symptom B will just take place sometime of interval later after symptom A. The data mining techniques that generally direct against the higher appearance frequency itemsets and only consider the single dimensional sequential pattern cannot totally search the pattern of outbreak symptom of excrescent disease, and cannot also provide related reference information to prescribe medicine for nursing staff at that time.
由於传统资料探勘技术中之关联规则是用来针对资料集合中出现频率较高亦是支持度高之项目集合进行探勘,若是应用於异常疾病发病徵状样式之探勘,由於异常疾病病患人数不及於普通疾病病患人数之缘故,因而造成部份发病徵状之支持度不高,将会在探勘过程中被去除,另外这类异常疾病之发病徵状可能会有先后发生时间之顺序,例如症状A发生后间隔一段时间后才会发生症状B,所以一般针对高频项目集合且只考虑到单一顺序维度之资料探勘技术,并无法完全找寻出这类异常疾病发病徵状之样式,也就无法在第一时间内提供医护人员对症下药之相关参考资讯。
-
Rock mass deformation and failure in working face caused by underground mining lead to mining-induced fracture, which is the source of a series of mine disasters. The research on geophysical characteristics of mining-induced fracture rock mass and feasible geophysical techniques with high accuracy and resolution detection on mining-induced fracture rock mass are meaningful theoretically and practically for the safety of coal mines and the prevention of mining disasters.
地下矿床开采引起采场围岩变形破坏产生采动裂隙,采动裂隙是矿山一系列灾害的根源,研究矿山采动裂隙岩体的地球物理场特征,提出可行的地球物理方法对裂隙岩体实施高精度高分辨率探测,对于防治矿山灾害发生,保障矿山安全,具有重要的理论意义和实际应用价值。
-
And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents.
其中采矿、矿山机械、开采斜坡道工程是设计的主体,采矿中采用了先进的低贫损无底柱分段崩落法,将产生巨大的经济效益,专题开采斜坡道工程,主要包括斜坡道位置的确定、斜坡道形式的选择、斜坡道的断面规格、斜坡道坡度、斜坡道弯道设计、斜坡道施工等方面的内容。
-
And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents.
其中采矿、矿山机械、开采斜坡道工程是设计旳主体,采矿中采用le先进的低贫损无底柱分段崩落法,将产生巨大的经济效益,专题开采斜坡道工程,主要包括斜坡道位置确实定、斜坡道形式的选择、斜坡道的断面规格、斜坡道坡度、斜坡道弯道设计、斜坡道施工等方面的内容。
-
According to two coal mining practics by Xinshan Mine of Hegan Mining Bureau, through economic technique analysis, the article proves that suspend-shift support mining with sublevel caving is superioror to with slice-blasting mining in mining thick coal seam.
根据鹤岗局兴山矿两种采煤方法的实践比较,通过经济技术分析,证明开采厚煤层选用悬移支架放顶煤比分层炮采优越。
-
If, by reason of any accident, or failure, or other event occurring to in or in connection with the Works, or any part thereof, either during the execution of the Works, or during the Period of Maintenance, any remedial or other work or repair shall, in the opinion of the Engineer or the Engineer'sRepresentative, be urgently necessary for the safety of the Works and the Contractor is unable or unwilling at once to do such work or repair, the Employer may employ and pay other persons to carry out such work or repair as the Engineer or the Engineer's Representative may consider necessary.
如在施工或维修期间,因工程或部分工程发生或涉及任何意外、或事故、或其他事件,工程师或工程师代表认为需马上进行补救或其他工作或修理,以保证工程的安全,而承包人无法或不愿马上进行此种工作或修理,业主可雇用并支付他人进行工程师或工程师代表认为必要的此种工作或修理。
-
If, by reason of any accident, or failure, or other event occurring to in or in connection with the Works, or any part thereof, either during the execution of the Works, or during the Period of Maintenance, any remedial or other work or repair shall, in the opinion of the Engineer or the Engineer's Representative, be urgently necessary for the safety of the Works and the Contractor is unable or unwilling at once to do such work or repair, the Employer may employ and pay other persons to carry out such work or repair as the Engineer or the Engineer's Representative may consider necessary.
如在施工或维修期间,因工程或部分工程发生或涉及任何意外、或事故、或其他事件,工程师或工程师代表认为需马上进行补救或其他工作或修理,以保证工程的安全,而承包人无法或不愿马上进行此种工作或修理,业主可雇用并支付他人进行工程师或工程师代表认为必要的此种工作或修理。
-
Therefore our each person's work is takes turns, therefore I do in this quick two year have quoted price engineer, sample engineer, process engineeer, makes Engineer Cheng, cartography engineer, also has alone designed some mechanical devices (for example cutter, cloth rolling machine, cloth cutting machine), but also has some document manufacture.
所以我们每个人的工作都是轮换的,因此我在这快两年的时间里做过报价工程师,样品工程师,工艺工程师,制程工程师,绘图工程师,也独自设计了一些机械设备(如切割机,卷布机,裁布机),还有一些文件的制作。
-
Have working experience as Electrical Design Engineer, Testing Engineer, Aftersales Service Engineer or Sales Engineer
并有技术相关经验,如电气设计工程师,电气调试工程师,电气售后服务工程师或电气销售工程师。
-
Thissubject exerts the experiment method of analogue modeling, and we take geologic mining condition of the Xin Zhi Colliery of Huo Zhou Mineral Bureau in Shang Xi province as the physical model of background design. The experiment is divided into two phases, the first phase simulates the course of mining subsidence, we study rule of movement transmogrification of mining terrane. In the second phase, after the mining subsidence is gradually stabilization, we bring into bear different load in the different location of subsiding basin, and we study ground stability with goaf.
本课题以山西霍州矿物局辛置煤矿地质采矿条件为例,进行了相似材料模拟试验,试验分为两个阶段:第一阶段模拟开采沉陷过程,研究采动岩层移动变形规律;第二阶段在开采沉陷基本稳定之后,在沉陷盆地的不同位置施加大小不同的建筑物荷载,研究其地基的稳定性。
- 相关中文对照歌词
- Mine The Diamond (A Minecraft Song)
- Mining For Coal
- Monkey And The Engineer
- The Family
- Hey Porter
- Hey, Hey, Train
- Hey Porter
- Mining For Gold
- Love Engineer
- Love Transmission
- 推荐网络例句
-
Fostering the concept of multi-culture firmly and mastering the development of advanced culture correctly are conductive to resisting terrorism, separatism of nationalities and ultraism of religion, which is of great academic theoretical, immediate and profound historical si...
牢固树立多元文化的理念和正确把握先进文化的发展方向,有助于在世界范围内自觉地抵制恐怖主义,民族分裂主义和宗教极端主义。不仅具有重大的学术理论意义,而且也具有重大的现实意义和深远的历史意义。
-
But if anyone walks in the night, he stumbles, because the light is not in him.
11:10 若在黑夜行走,就必碰跌,因为那光不在他里面。
-
You are asking for the moon.
你的要求太过分了。