英语人>网络例句>loading wheel 相关的网络例句
loading wheel相关的网络例句

查询词典 loading wheel

与 loading wheel 相关的网络例句 [注:此内容来源于网络,仅供参考]

In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the selle

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurra

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Sellers failure to effect loading when the vessel arrives duly at the loading port all expenses including dead freight /or demurrage charges thus incurred shall be for the Sellers account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Of the sellers'failure to effect loading when the vessel ar-rives duly at the loading port,all expense including dead freight and/or demurrage charges thus incurred shall be for seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers'failure to effect loading when the vessel ar-rives duly at the loading port,all expense including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

A larger error often occurs in measured results by multi-specimen J-R curve method because of the difficulty in determining the blunting line equation. On the basis of considering the effect of loading rate on plastic-flow stress, a new blunting line equation in dynamic loading has been obtained: J=2NK0.5(subscript εFΔa.

针对多试样J-R阻力曲线法因钝化线的不易确定性常造成测试结果J误差较大的情况,考虑了加载速率对塑性流变应力的影响,给出了一新的动载条件下的钝化线方程:J=2NK0.5

第22/50页 首页 < ... 18 19 20 21 22 23 24 25 26 ... > 尾页
相关中文对照歌词
Ezekiel Saw The Wheel
Four Wheel Drive
Keep Your Hands On The Wheel
Life's Zombies
Turn The Wheel
You're My Driving Wheel
Across The Line (Unreleased 2007 Demo)
Across The Line
Wheel Of The World
Drivin' Wheel
推荐网络例句

After explaining total design of automated test system for microcircuit , the thesis introduces GPIB standard .

文章在说明了微电路模块自动测试系统的总体设计后,对GPIB标准进行了介绍。

He interceded in my behalf.

他替我说情。

The greatest quality of axle load: vehicle carrying the largest single-axis by the total mass.

最大轴载质量:汽车单轴所承载的最大总质量。