查询词典 load draft
- 与 load draft 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A ultra-short term load forecasting method based on autoregression;2. A novel method called load derivation is introduced for ultra-short term load forecasting of power system.
仿真表明了改进模型的有效性和算法的可行性,对于超短期负荷预测这类需要反应迅速的问题,采用本文提供的方法进行预测是可靠且非常有效的。
-
Base Load 基本负荷 Base load is that portion of a building load demand which is constant.
基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。
-
Base Load Base load is that portion of a building load demand which is constant. It is the "base" of the building demand curve.
基本负荷基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。
-
We also see that the annual peak load is 15GW . The base load has to be fed 100 percent of the time , but the peak load may occur for only 0.1 percent of the time .
我们还注意到,每年系统需求的平均最大值是15GW,而这已经需要百分之一百的时间去提供基本负荷了,但是高峰负荷只会出现0.1秒而已。
-
IPCOP . Base Load Base load is that portion of a building load demand which is constant. It is the "base" of the building demand curve.
基本负荷基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。
-
If you directly measure central blood pressure, that is to say carotid blood pressure, for instance carotid systolic blood pressure, with penetration to the other side of carotid artery, then you are in the buzzy thing to determine exactly the ventricular load, the load on the brain, because it is very similar to the load in the kidney-the hemodynamic input into the kidney.
如果你直接测量中心血压也就是颈动脉压的话,比如测量颈动脉收缩压,这个时候你才能准确地告诉我心室的负荷是多少,大脑的负荷是多少,因为颈动脉的血流负荷与肾脏的血流负荷--即进入肾脏的血液很接近。
-
If you directly measure central blood pressure, that is to say carotid blood pressure, for instance carotid systolic blood pressure, with penetration to the other side of carotid artery, then you are in the buzzy thing to determine exactly the entricular load, the load on the brain, because it is ery similar to the load in the kidney—the hemodynamic input into the kidney.
如果你直接测量中心血压也就是颈动脉压的话,比如测量颈动脉收缩压,这个时候你才能准确地告诉我心室的负荷是多少,大脑的负荷是多少,因为颈动脉的血流负荷与肾脏的血流负荷——即进入肾脏的血液很接近。
-
This bridge design for 2×80m the continual steel truss girder bridge, the span is 160m, the main spar center distance is 5.75m, clothes rack high 11m, panel length 8m, the main spar geometry graphical representation uses the triangle web member system, the floor system by the carline, the crosnbeam is composed, the member connection uses the high-strength bolt connection, the design load for the dead load and - the live load.
该桥设计为2×80m连续钢桁梁桥,全长为160m,主桁中心距为5.75m,桁高11m,节间长8m,主桁的几何图示采用三角形腹杆体系,桥面系由纵梁,横梁组成,杆件连接采用高强螺栓连接,设计荷载为恒载和中—活载。
-
This paper discusses the index of load characteristic, and analyses the factors that affect load characteristic. Also, a method that forecasting the day load curve has been cited.
本文探讨了负荷特性的指标体系,分析了影响负荷特性的因素并借助一个简单方法对辽宁省日负荷曲线进行预测。
-
By analyzing the loading status of three-point drop test platform, the force model of which has been built, and determined the factors that affect the measurement precision of horizontal load of wheel, derived the computational formula of horizontal load of wheel, so, the original measurement method of horizontal load of wheel has been improved.
通过分析三点支撑落震平台的受力状态,建立了三点支撑落震平台的力学模型,确定了影响机轮水平载荷测量精度的因素,推导出了机轮水平载荷的计算公式,从而改进和完善了现有的机轮水平载荷测量方法,使机轮水平载荷的测量更精确、更合理。
- 相关中文对照歌词
- The Weight
- Draft Me
- Bulletproof
- The Weight
- The Weight
- The Weight
- Mother Load
- The Weight
- The Weight
- Take A Load Off
- 推荐网络例句
-
Chimborazo and Cotopaxi, took me by the hand.
越过琴博腊索山和科托帕克西山。
-
This car is in a good condition.
这辆车的状况很好。
-
You can divide them into two categories.
您可以分为两类他们。