查询词典 fill up
- 与 fill up 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
One way for an increase in the fill below a washer in the bottom plus a spring washer, when the packing wear, because the role of a spring, will be pressed to re-fill, seal it.
一种办法为,在填料下方增加一个垫圈,在垫圈下边加一个弹簧,当填料磨损后,由于弹簧的作用,便会重新压紧填料,使其密封。
-
I can fill it with joy, I can fill it with strife.
我追随着这个世界,做自己的事情
-
She in the entire story, all is the fill vitality, the fill fighting spirit person.
她在整个故事中,都是个充满生气、充满斗志的人。
-
On the basis of analyzing and processing the experimental data, the major factors influencing the spread and the fill degree and the regressive equations for estimating the "spread coefficient" and the fill degree at the vertex angle have been found.
通过对实验数据的整理和分析,找出了影响轧件在平底切分孔型中宽展和顶角充满度的主要因素;从而建立起计算宽展系数和顶角充满度的回归方程。
-
Comma and fill are omitted, fill defaults to zero.
式。如果没有给出逗号和fill,fill值缺省为0。
-
The address database has an auto fill function, so you enter the zipcode and we will fill in the city and state automatically.
地址数据库有一个自动填充功能,所以您所输入的邮政编码,我们将填补在纽约市和纽约州自动。
-
A number of significant conclusions are proposed. For the first time,double arciform strain of the soil nailing is observed in the miscellaneous fill. It is considered as the result that there are two potential slide planes in the miscellaneous fill. The critical anchorage length is analyzed and determined for the first,which is 9 m in this experiment. T...
首次测得并分析了杂填土中土钉的双弓形应变分布形态,指出这是填土边坡中存在2个或以上潜在滑动面的结果;首次测得并分析了土钉临界锚固长度,指出在本试验条件下,其长度约为9 m,并认为临界锚固长度是应变峰值点、零值点和破坏点同时发生转移而形成,锚固类结构均具有此特点。
-
To assure the quality of retailing backwall fill,the paper discussed the construction technology of lime soil mixture,retailing backwall fill and side angle treatment etc.
为确保台背回填质量,采用从灰土拌和、台背回填到边角处理一整套施工工艺,保证台背压实度达到 95 %以上。
-
In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.
本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。
-
Methods ⑴Approach of sublow tarsal plate conjunctiva: removing the herniated periorbital fat and fill it in the hollow(11 cases) or fill the in the hollow three months after the operation with autofat granule inyection (2 cases).
目前在临床上接受各种睑袋整复者中,下睑伴眶缘凹陷者,并不少见,若按传统的整复方法去皮、去脂、紧缩眼轮匝肌,眼眶凹陷未获解决,效果不尽满意。
- 相关中文对照歌词
- It Fills You Up
- Come Fill My Heart
- Fill Her Up
- Pop A Bottle (Fill Me Up)
- Fill Her Up
- Joyful, Joyful
- Holy Spirit, Come Fill This Place
- Set Me Ablaze
- Bigger Hole To Fill
- Wrap Me Up
- 推荐网络例句
-
Sodium citrate; calcium carbonate; calcium hydroxide; potassium bicorbonate; magnesium carbonate; ferrous sulphate; Zinc sulphate; copper sulphate; manganese sulphate; potassium iodide; sodium selenite.
柠檬酸钠;碳酸钙;氢氧化钙;碳酸氢钾;碳酸镁;硫酸亚铁;硫酸锌;硫酸铜;硫酸锰;碘化钾;亚硒酸钠。
-
All this to say that I'm glad filmmaking hasn't become completely ironic. I can enjoy an ironic film as much as the next person, but they usually involve a message of some sort. One that's delivered in a smirkingly clever way that requires little in the way of talent.
所有这些都是说,我很高兴电影制作没有变成完全讽刺艺术,我可以和下一个人一样享受讽刺电影的乐趣,虽然他们经常会被划归到一定级别,技术方面不需要很高的才能。
-
I'll be damned, I am going to send him to military school.
我可铁了心了,我要送他上军校去。