英语人>网络例句>duly 相关的网络例句
duly相关的网络例句
与 duly 相关的网络例句 [注:此内容来源于网络,仅供参考]

Of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for sellers accorunt.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Event of the sellers' failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the selle

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

第5/29页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Hard Wired
Jack's Shadow
Trying To Kill M.E.
Friday's Tie-Dye Nightmare
The Night Before Larry Was Stretched
Looking Through the Eye of a Pig
A Month In The Country
Honey, Don't You Want A Man Like Me?
Splash
The Raven
推荐网络例句

He became prime minister in 1997 and won international acclaim for his role in the Northern Ireland peace process.

他在1997年成为总理,并且因为在北爱尔兰的和平进程中发挥的作用受到国际社会的赞许。

Mixed Page Sorting Method Using the cuttable user model, this thesis proposes a mixed page sorting method by using cutted user model in server-side and complete user model in client-side.

隐私分级利用的混合式页面排序方法针对个性化搜索中搜索结果排序的问题,本文利用隐私可控开放的用户偏好模型,提出一个在客户端和服务器端分步进行的隐私分级利用的混合式页面排序方法。

You can laud them for speaking their minds, or you can criticize them for their big mouth, but you cannot deny that these retorts, rebuttals and asides add much needed color to an otherwise drab portrait of Chinese officialdom.

你可以赞扬他们直抒胸臆,也可以骂他们的大丑嘴巴,但你不能否认,这些反驳和旁白为中国官场众生相添加了新的色彩。