英语人>网络例句>development test 相关的网络例句
development test相关的网络例句

查询词典 development test

与 development test 相关的网络例句 [注:此内容来源于网络,仅供参考]

Test measure using in the test for axial force is different from previous measure, which overcome effect of friction between plunger piston bending work roll and chock in dynamic test.

轴向力测试采用了不同于以往的方法,直接测出作用于工作辊的轴向力,克服了动态过程中弯辊柱塞与轴承座之间的摩擦影响,还可反映出圆周方向的分布。

Test data collected by 90°are inlet nozzle test unit is instroduced ,according to international standard,Test data such as inlet and outlet pressure,fan pressure,efficiency and etc.are computed.

介绍了用90°弧形进口喷嘴试验装置采集试验数据,再根据国际标准对风机的进出口压力、通风机压力、效率等试验数据进行了计算。

The quality of well-equipped, including advanced energy dispersive X-ray fluorescence analyzer, salt spray test machine, projection for expansion, vibration testing machine and vacillating test machine, wearable rub tester, constant temperature and humidity test machine, Taiwan sunny electro-acoustic instrument, and so on, each one products have to undergo a rigorous the quality inspection before shipment to ensure that the products of high quality, high reliability.

公司的质量检测设备齐全,包括先进的能量色散型X射线荧光分析仪,盐雾试验机,投影扩大仪,振动试验机,摇摆试验机,耐磨擦试验机,恒温恒湿试验机,台湾阳光电声仪等等,每一个产品均经过严格的质量检测才能出货,保证了产品的高品质,高可靠性。

Secondly, standard test of bonding interface tensile splitting strength and on-site simulated test of bonding interface pull-off strength were carried on after the roughness test study.

其次在粗糙度试验的基础上,对影响界面粘结质量的界面剂种类、粘结龄期、混凝土强度等级等几个主要因素进行组合,完成了粘结界面劈拉强度标准试验和钻芯拉拔现场模拟试验。

This article according to the actual application of Rapid-drop gate, meanwhile combine the entire characteristics test of pump model which was developed on the high accuracy pump model test platform of the south-to-north water transferring project water the model, mainly includes the water pump operating mode, the water pump applies the brake the operating mode and the hydraulic turbine operating mode, take a runner as the object, makes 3 to place the angle to 5 leaf blades the entire characteristics test.

本文根据快速闸门的实际运用情况,同时结合了高精度南水北调工程水泵模型同台测试试验台上开展的模型泵全特性试验,试验主要包括水泵工况、水泵制动工况和水轮机工况,以一个转轮为对象,做3至5个叶片安放角度的全特性试验。

Electrical equipment test equipment General Wire tester, plug wire bending test machine, wire thermostat ball pressure testing machine, 90 peel strength test machine, plug wire pull testing machine penetration resistance, combustion testing machine, plug-line static tensile testing machine can be flexibility around the wire testing machine, wire print fastness testing machine, wire elongation testing machine, testing machine drum plugs, standard light boxes.

七。电工器材试验设备线材综合测试仪、插头引线弯折试验机,电线恒温球压试验机、90°剥离强度试验机、插头线突拉试验机、耐燃烧试验机、插头线静态拉力试验机、可绕电线柔软度试验机、电线印刷体坚牢度试验机、线材伸长率试验机、插头滚筒试验机、标准光源箱等。

Seven. Electrical equipment test equipment integrated wire tester, plug wire bending test machine, wire thermostat ball pressure testing machine, 90 peel strength test machine, plug wire pull testing machine penetration resistance, combustion testing machine, plug-line static tensile testing machine can be flexibility around the wire testing machine, wire print fastness testing machine, wire elongation testing machine, testing machine drum plugs, standard light boxes. Eight.

线材综合测试仪、插头引线弯折试验机,电线恒温球压试验机、90°剥离强度试验机、插头线突拉试验机、耐燃烧试验机、插头线静态拉力试验机、可绕电线柔软度试验机、电线印刷体坚牢度试验机、线材伸长率试验机、插头滚筒试验机、标准光源箱等。

Presenting subjects manipulated mental workload with five tests, including Raven's Standard Progressive Matrices and four subtests of Wechsler Intelligence Scale for Chinese-Children revision in 60 to 70 minutes. Reading velocity, mistake rate, index of mental capacity in Number Cancellation Test and test time, the right number of tracking lines in Visual Tracking Test were calculated and compared between the two groups.

以瑞文标准推理测试、韦氏智力量表中部分项目测试60~70min作为脑力作业负荷,负荷前、后分别进行划消试验和视觉追踪测验,统计划消试验的阅读速度、错误率、脑力工作能力指数,统计视觉追踪试验的完成时间及正确数,分析脑力作业负荷对肥胖组和对照组各指标的影响及2组间的差异,分析肥胖青少年注意能力的特点。

You execute the test manually while the test tool sits in the background and remembers what you do. It then generates a script that you can run to re-execute the test. It's a great idea - that rarely works.

测试者在后台运行测试工具,再手工执行测试,工具将测试者的动作记录下来,自动生成一个脚本,以便测试者可以重新运行测试动作,这虽然是个好想法,但对测试工作本身并无太大意义。

Jiangsu Bao Ying decay BAOYING pump covers an area of 45,000 square meters, 26,000 square meters building, with assets of 20,050,000 yuan, the existing types of professional and technical personnel more than 120 people, has the domestic advanced vehicles, milling, planing, grinding, and Play various types of processing equipment more than 200 sets of a set of physical and chemical testing equipment, vibration equipment, a set number of hours, and has formed the test flow of 10000m3 / h, a diameter of 20 inches, power of 800KW capacity within the pump test to meet the test of various Pump performance requirements.

江苏宝应县盈宝耐腐泵厂占地45000平方米,建筑26000平方米,拥有资产2005万元,现有各类专业技术人员120多人,拥有国内先进的车、铣、刨、磨、插各类加工设备200多台套,理化试验设备一套,振动时数设备一套,已形成测试流量为10000m3/h、口径为20英寸、功率为800KW以内的水泵测试能力,可满足测试各类水泵性能指标的要求。

第61/100页 首页 < ... 57 58 59 60 61 62 63 64 65 ... > 尾页
相关中文对照歌词
Test Of Time
Put It To The Test
Across The Nation
Across The Nation
Piss Test (Interlude)
Development
Test Drive
Truth
Test Drive
I Cram To Understand
推荐网络例句

"The operators will suffer a temporary decrease in the number of consumers and short message services as people may not like having to provide their ID cards for a phone number," Xu Junqi, vice-dean with the Policy-Making Institute of the Telecommunications Research Centre under MII, said yesterday.

信息产业部下属的通信决策研究院副主任徐俊其昨天说:&实行手机实名制后,人们可能不太情愿用身份证注册手机号,所以通信运营商会暂时面临用户减少和短信用户减少的问题。&

I don't believe in make-believe!

我不相信这些虚构的故事。

The edible root of the beet .Fodder preserved in a silo; silage.

贮窖的饲料贮藏在贮窖中的饲料;青贮作物