英语人>网络例句>dam up 相关的网络例句
dam up相关的网络例句

查询词典 dam up

与 dam up 相关的网络例句 [注:此内容来源于网络,仅供参考]

At the same time I contriv'd to encrease my little Flock of tame Goats as much as I could; and to this Purpose, I made Friday and the Spaniard go out one Day, and my self with Friday the next Day; for we took our Turns: And by is Means we got above 20 young Kids to breed up with the rest; for when-ever we shot the Dam, we saved the Kids, and added them to our Flock: But above all, the Season for curing the Grapes coming on, I caused such a prodigious Quantity to be hung up in the Sun, that I believe, had we been at Alicant where the Raisins of the Sun are cur'd, we could have fill'd 60 or 80 Barrels; and these with our Bread was a great Part of our Food, and very good living too, I assure you; for it is an exceeding nourishing Food.

要是我们在生产葡萄干著称的阿利坎特,我相信,我们这次制成的葡萄干可以足足装满六十至八十大桶。葡萄干和面包是我们日常生活的主要食品,而且葡萄干又好吃,又富于营养,对改善我们的生活起了很大的作用。

So I called up my mentor, and I called up Andy Van Dam.

於是我打电话给我的本科导师,安迪。

Domestically, they are patching up a dam that is starting to burst with pent-up desire for change.

在国内,他们修补着在压抑已久的改革渴望推动下已开始崩溃的大坝。

Last year a coffer-dam built to protect the main dam during construction was blown up.

去年,一座用于在施工中保护主坝的围堰被炸毁。

The routine design method of the dike dam is, which is borrowed the experience of deviser, followed the relative criteria and requests, and set up the engineering instance after making choices of the dam, to carry on the dam arrangement and figure designation. Then it should carry on the seepage analysis inside the dam and the stable calculation of the dam slope. It also needs to check whether to satisfy the norm request of design, then gets a feasible scheme.

常规的堤坝设计方法是在选定坝址后凭借设计人员的经验,遵循有关规范和运行要求,并参照已建工程实例,进行坝体布置和体形设计,然后进行坝内渗流分析和坝坡的稳定计算,以检查所选的方案是否满足设计规范的要求,如果满足,即得到一个可行方案。

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

Based on the example of shahe reservoir, the text makes an analysis on circulation, management and environment and social economy development condition of the surrounding ecosystem. Then, the author carries on inquisition, data analysis and summary and makes calculation and demonstration of the safe stability of the dam ,and discusses the risking obviation and reinforcing technique. Finally, based on the existing research of sustainable development, experts" opinions and Mathematical Statistics analysis, the author brought forward an indication system suitable for reservoirs" sustainable development This system is made up of 4 first class indexes, 13 second class indexes, 38 foundational indexes. The 4 first class indexes are the dam safety evaluating index, the management index of reservoirs, the water ecosystem system stability index, the reservoirs construction effect index. The 13 second class indexes are the construction quality evaluating index, the dam running and management evaluating index, the flood control standard recheck index, the structure safety evaluating index, the anti- earthquake evaluating index, seepage safety evaluation index sign, the metal structure safety evaluating index, the engineering facility index, the management index, the water ecosystem system stability index, engineering effect index, the economic development index, the society development index.

本文以沙河水库为例,对其运行、管理及周围生态环境和社会经济发展状况进行调查,并将调查资料进行分析、归纳、总结;然后对水库大坝的安全稳定情况作出了简要的计算和论证,并讨论了水库的主要除险加固技术;最后在总结现有可持续发展研究的基础上,征集专家的意见,进行数理统计分析,提出了由4个一级指标、13个二级指标、38个基层指标组成的一套适合该水库可持续发展的指标体系。4个一级指标分别为:水库大坝运行安全综合评价指标、水库管理指标、水资源生态系统稳定性指标、水库建设效应指标;13个二级指标分别为:工程质量评价指标、大坝运行管理评价指标、防洪标准复核指标、结构安全评价指标、抗震安全评价指标、渗流安全评价指标、金属结构安全评价指标、工程设施指标、管理指标、水资源生态系统稳定性指标、工程效应指标、经济发展指标、社会发展指标。

While few people will be displaced by the dam, up to 500,000 people living further down in the Omo valley and around Kenya's Lake Turkana , which is fed by the Omo, could be adversely affected, according to International Rivers.

据国际河流组织称,大坝使一些群众不得不迁居他处。而与此同时,居住在奥莫谷深处以及受奥莫河水孕育的肯尼亚图尔卡纳湖周围的50多万人的生活将会发生翻天覆地的变化。

The river was dammed up, and behind the dam a great deal of water presure was built up.

这条河筑起了水坝,水坝后面形成了很大的水压。

It is concluded that because the mica schist is mixed with feeble weathered granite, the grain is broken up severely; the back-analysis parameters of explosion rockfill(3BⅠ)are lower than the results of laboratory triaxial test, and the Duncan E-B parameters obtained by back-analysis of her sandy gravel (3BⅡ)are higher than the triaxial test results of laboratory triaxial test which can not reflect the mechanical behaviors of the dam material objectively; the research should be strengthened in 300 m high rockfill dam construction. The fitting modes of the space displacement field of prototype observation are also explored and it turns out that the results of IGA analysis considering only vertical deformation meet the need of dam's technical accuracy.

结果表明,由于在微弱风化花岗岩掺加云母片岩,颗粒破碎严重,爆破堆石料(3BⅠ)的原级配粗粒料反演参数远低于室内三轴试验成果;与3BⅠ堆石料相反,砂砾料(3BⅡ)现场反演得到的邓肯E~B模型参数高于室内三轴试验值;室内三轴试验成果不能客观反映筑坝材料的力学特性,对于当今的300 m级高土石坝建设,宜加强对原级配粗粒料的力学特性研究;同时对原型实测的空间位移场不同拟合方式进行了探讨,认为仅考虑铅直向变形的IGA参数反演成果能基本满足土石坝工程的精度要求。

第2/6页 首页 < 1 2 3 4 5 6 > 尾页
推荐网络例句

He is the most remarkable man that I have ever known.

他是我知道的人中最值得注意的人。

Increased appearance of lymphocele was noticed in patients with diabetic nephropathy, congenital malformations of the urinary tract, and inflammatory diseases, including glomerulopathy and extraglomerular ones, after high-voltage radiotherapy and after removal of the renal graft.

经过高压放射疗法和切除移植肾后,在糖尿病肾病患者、泌尿系统先天性畸形患者和炎症患者身上发现淋巴囊肿有所增加,包括肾小球病和球外疾病等。

Pagans and partygoers greeted the summer solstice at the ancient stone circle of Stonehenge.

异教徒和社交聚会常客在史前巨石柱的古老的石圈附近庆祝夏至。