英语人>网络例句>construction engineering 相关的网络例句
construction engineering相关的网络例句

查询词典 construction engineering

与 construction engineering 相关的网络例句 [注:此内容来源于网络,仅供参考]

For example imitation board and its products with the European edition of formaldehyde "shaving board," the standard indicators consistent; Solvents, benzene-based paint wooden limited value and the "Community eco-labelling products -- Seqi and varnishes ecological commands" the same; Carpet, carpet pad and carpet products used Jiaonianji divided into A, B levels, a level of environmental protection - which the limited value with the United States under the carpet Association standards volatile organic compounds, formaldehyde, and other indicators of the same; the conditions of application of radioactive materials into civil construction and industrial materials of construction, civil construction is divided into one category and class civil construction, and then, in accordance with A, B, C classification.

比如人造板及其制品中的甲醛限量与欧洲&刨花板&等有关标准的指标相一致;溶剂型木器涂料中苯的限量值与&欧共体生态标志产品―――色漆和清漆生态指令&相同;地毯、地毯衬垫及地毯用胶黏剂产品分为A、B两级,其中A级环保型的限量值与美国地毯协会标准规定的挥发性有机化合物、甲醛等指标相同;建筑材料放射性把材料适用条件分为民用建筑和工业建筑,民用建筑又分为一类和二类民用建筑,然后按照A、B、C分类。

Therefor, the lining construction scheme of "the inverted arch is lined after the lining of the side and roof arch" is adopted in the construction of the tunnel for the water conveyance project of Dahuofang Reservoir, and then the excavation and the lining are carried out at the same time, by which the construction progress has been promoted and the total construction period of the project has been ensured as well.

为此,经研究在大伙房水库输水工程的隧道施工中采用了先边顶拱后仰拱的衬砌施工方案,实现了开挖与衬砌平行作业,从而加快施工进度,确保了工程建设总工期。

Project results will be in the Dehong new countryside construction, railway and road construction, oil and gas pipeline construction, urban planning, port construction, resources survey, ecological environmental protection, anti-aids drug, has played an important role.

项目成果将在德宏州新农村建设、铁路公路建设、油气管道建设、城镇规划、口岸建设、资源调查、生态环境保护、禁毒防艾等方面发挥重要作用。

It combines the construction mechanization with the microcosmic process of construction mechanization and has a theoretic discussion on the mechanization organization method of RCD construction. An effective method is provided for rational optimization of the mechanization organization construction.

将施工机械化配套与大坝施工的&微观&过程相结合,对大坝机械化施工组织方法进行了理论性探讨,为合理优化组织机械化施工提供一套有效的指导方法。

Summary of the main tasks for the design basis of the new norms box for checking cantilever construction, Bridge construction safety and quality of construction is a top priority. Installation of this project is checking the pre-construction work of an important technology.

本设计主要任务为依据新的规范对箱形悬臂施工进行验算,拱桥的施工安全和质量是工程施工的头等大事,为此工程安装施工验算是施工前的一项重要技术工作。

During the period of construction by the cantilever erection construction method, bridge experiences not only the process of generating girder in the stage of T rigid frame, but also the process of system transformation, so bridge has experienced a great complex stress process, in order to ensure the security of bridge during the whole stage of construction, the stress control and geometry control must be made during the stage of construction of bridge.

近些年来,我国随着经济的快速增长,出现了建造大跨度桥梁的高潮,预应力混凝土技术的迅速推广应用以及建造预应力混凝土连续梁桥的各种先进施工方法应运而生,加快了桥梁的施工进度,使得预应力混凝土连续梁桥的跨越能力不断增大,悬臂拼装施工方法就是在这种背景下产生并发展起来的。

Syntactic presupposition triggers mainly refer to some special sentence patterns , including "ba" construction and "bei" construction that trigger the existential presupposition ; including "lian " construction that relates to the subjective judgment and "bi" construction that presuppose "BX".

句法类预设触发语主要是一些能触发预设的句式,包括触发存在预设的&把&字句和&被&字句,预设内容与主观评价有关的&连&字句和触发事实预设的&比&字句。

Sewage treatment plant phase ii rush period sewage treatment plant phase ii rush period qiqihar in heilongjiang news april 19 hearing yesterday morning,reporters at the city's bureau of the construction of urban sewage treatment center phase ii construction site to see more than 470 construction workers are in full swing biochemical pool,drainage pumping station,sewage pump pond 13 projects such as single pile foundation construction,7 sets of large hammers,3 large excavators,a national taiwan university,20 sets of cranes and heavy goods vehicles are operating at full capacity 24 hours with classes rush period.

污水处理厂二期工程抢工期黑龙江新闻网齐齐哈尔重庆自来水19日讯昨天上午,记者在市建设局自来水的中心城区污水处理二期工程施工现场看到,470多名施工人员正紧锣密鼓地进行生化池、排水泵房、自来水泵池等13个工程单体的桩基础施工,7台大型打桩机、3台大型挖掘机、1台大吊车和20余台重型给排水暖通正开足马力24小时连班抢工期。

Accordingto the absurdness of engineering drawings after parametric driving, doredevelopment to the engineering drawings based on the study of theory and methodof engineering drawings, realize the auto-regulation through programming.

同时根据工程图模板参数化驱动后出现图面凌乱的情况,对工程图绘制的理论和方法进行了研究,进行了工程图的二次开发,通过程序实现工程图的自动调整。

According to the change regularity of deformation modulus, combining with the rock mass structure characteristic of region studied, using interpolation method, the deformation modulus of rock mass in 36# adit can be deduced. The average vertical deformation modulus of rock mass during 0-70 zone is 39Gpa, and the horizontal deformation modulus of rock mass is 51. 3GPa in nature stress state and 50.8GPa in engineering load state. The average vertical deformation modulus of rock mass during 70-140 zone is 32. 2Gpa, and the horizontal deformation modulus of rock mass is 41GPa in nature stress state and 42. 6GPa in engineering load state. It will be a good reference of engineering design and evaluation.

9根据节理岩体变形模量变化规律,结合研究区岩体的结构特点,采用插值的方法对36号平硐岩体进行变形模量的推测,得到0-70段岩体的平均铅直向的变形模量为39GPa,水平向的变形模量:天然应力状态下为51.3GPa,工程荷载作用下为50.8GPa;70-140段岩体的平均铅直向的变形模量为32.2GPa,平向的变形模量:天然应力状态下为41GPa,工程荷载作用下为42.6GPa,这为工程设计、评程设计、评价等提供了必要的参考。

第26/50页 首页 < ... 22 23 24 25 26 27 28 29 30 ... > 尾页
相关中文对照歌词
Under Construction
Ice Cream
Change In The Making
Wall Around My Heart
Automotive Engineering
The Child With The Star On His Head
Temecula Sunrise
Not Man Big
The Construkction Of Light
Domination
推荐网络例句

He tendered his resignation to the Prime Minister.

他向首相递了辞呈。不适合

International economy and trade,Nanking 210044

国际经济与贸易,南京 210044

Lord… have I misheard you?

主啊,是我听错了吗?