查询词典 bit error rate
- 与 bit error rate 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The twig production of different clones is different, from 5.5 twigs per month to 14.8 twigs per month. The rooting rate, root number and root length change regularly as the concentration of IBA goes up from 0.05 to 2.00 mg/L. At the concentration of 0.05 mg/L ppm IBA, rooting rate and root length are the highest. Cutting substrate also has eminent effect on rooting rate and survival rate, 50% peat plus 50% sub-top soil is the best substrate. The survival rate differs greatly among clones, from 56.7% to 90.0%. Rooting rate and survival rate change regularly as season changes. The rooting rate of May and June is middle, that of July and August is high and that of September and October drops rapidly. The survival rate is low in May, September and October and high in June, July and August.
结果表明:不同无性系的萌条数量有显著差异,高的达14.8条/月,低的5.5条/月,平均9.1条/月,从0.05~2.00 mg/L,随着IBA浓度的提离,生根率、根条数、总根长等生根指标均呈现有规律的变化;综合考虑各种生根指标,以IBA0.05 mg/L为最佳生根激素处理,扦插介质对柚木插穗生根有显著的影响,以泥炭土+黄心土按1:1混合为最佳扦插介质;不同无性系的扦插成活率不同,从56.7%至90.0%,变动幅度大,随扦插季节变化,生根率和成活率均呈现有规律的变化,5~6月份的生根率中等,7~8月最高,9~10月份迅速下降,成活率随季节的变化也是两头低、中间高,6~8月的成活率最高,大于93%。
-
To the same kind of rocks, the penetration rate increases with the increases of electric bit thermal power. When electric bit thermal power keeps fixedness, the penetration rate increases in various degrees with the increases of bit load in difference rocks. Increasing the bit load is beneficial to improve the quality of glass hole wall, but the bit load should not be too big.
对于同一种岩石,钻进速度随钻头电热功率的增大而增大;当钻头电热功率不变时,根据所钻岩石岩性的不同,钻进速度随钻头轴载的增大而不同程度地增大,增加钻头轴载有利于提高玻璃状孔壁的质量,但不宜过大。
-
The thresholds are dynamically adjusted according to the difference between the target bit rate and actual bit rate. This method can reduce the bit rate of intra coded frames while still maintating error robustness and limiting temporal propagation of errors.
该方法根据目标比特率和实际比特率的差值,动态地调整阈值,从而有效地减少了帧内编码的比特率,保持了对差错的鲁棒性,限制了差错的时间传播。
-
Using the a hand-hold GPS and wireless transmitting unit to rapidly locate the fire and determine the rate of fire spread, which also offered an indispensable way of verifying the speed of forest fire appealing. Discussing the representation and Computing Method of the simulate calculation error based on the thorough investigation of the sources of simulate calculation error. Pointing out that the speed and directional error are the root of forest fire appealing simulates error. Thus increasing the parameter of error correction is an effect way of reducing systematicsimulationerrors.
4提出了一种利用手持GPS和无线传输设备来快速测定火场位置和林火实际蔓延速度的方法,为林火蔓延模拟速度验证提供了必要的手段;对林火蔓延模拟误差的来源进行了全面分析,探讨了林火蔓延误差的表现形式和计算方法,指出了林火蔓延速度误差和蔓延方向误差是林火蔓延误差产生的根源,提出了通过增加系统误差修正参数来减少系统模拟误差的有效方法。
-
The minimum required hardware for Windows 7 is as follows: a 1 gigahertz or faster 32-bit or 64-bit processor; 1 gigabyte of memory for the 32-bit version of Windows 7 or 2 GB for the 64-bit version; and 16 GB of available hard disk space for 32-bit or 20 GB for 64-bit.
Windows 7的最低系统要求如下:至少1GHz主频的32位或64位处理器、32位版本的Windows 7要求1GB内存和16GB可用的硬盘空间;64位版本的Windows 7则要求2GB内存和20GB可用的硬盘空间。
-
The main technique applied in our method is derived from the features of the eight bit-planes of a gray image. The XOR bit-wise operation is used for two bit pixels among the neighboring bit-planes from the most significant bit to the least significant bit.
本提出方法是将欲隐藏之灰阶影像分解成八张位元平面,并利用其影像前几个位元平面0与1分布会有群聚现象,将两两位元平面间作XOR (Exclusive-or)运算,再使用线性四元树的观念将运算后的资料进行有效BFS编码,之后再隐藏於伪装图之像素最低位元,使最后藏入资料的伪装图影像仍呈现高度清晰的图像显示,也就是说PSNR的测度皆能远大於30dB。
-
This article in the collection analyzes the domestic and foreign high speed roller bit bearing research pertinent data in the foundation, in view of the present high speed roller bit bearing in the field application existence's question, through to the roller bit bearing main failure mode and the reason analysis, found the extension roller bit service life the theory basis, uses the method which the theory and the experiment unified to develop to the roller bit bearing surface strengthening technology as well as the bearing enclosure system's preliminary study, has provided a new mentality and the method for roller bit's design, further impelled the modern well drilling processing technology the development.
本文在收集分析国内外高速牙轮钻头轴承研究有关资料的基础上,针对目前高速牙轮钻头轴承在现场应用存在的问题,通过对牙轮钻头轴承主要失效形式和原因的分析,找到延长牙轮钻头使用寿命的理论依据,采用理论与实验相结合的方法开展了对牙轮钻头轴承表面强化技术以及轴承密封系统的初步研究,为牙轮钻头的设计提供了一条新的思路和方法,进一步推动现代钻井工艺技术的发展。
-
Pinout: C High-performance 32-bit RISC Architecture C High-density 16-bit Instruction Set C Leader in MIPS/Watt C Little-endian C Embedded ICE (In-circuit Emulation) 8-, 16- and 32-bit Read and Write Support 256K Bytes of On-chip SRAM C 32-bit Data Bus C Single-clock Cycle Access Fully Programmable External Bus Interface C Maximum External Address Space of 64M Bytes C Up to Eight Chip Selects C Software Programmable 8/16-bit External Data Bus Eight-level Priority, Individually Maskable, Vectored Interrupt Controller C Four External Interrupts, including a High-priority, Low-latency Interrupt Request 32 Programmable I/O Lines Three-channel 16-bit Timer/Counter C Three External Clock Inputs C Two Multi-purpose I/O Pins per Channel Two USARTs C Two Dedicated Peripheral Data Controller Channels per USART Programmable Watchdog Timer Advanced Power-saving Features C CPU and Peripheral Can be Deactivated Individually Fully Static Operation: C 0 Hz to 75 MHz Internal Frequency Range at VDDCORE = 1.8V, 85C 2.7V to 3.6V I/O Operating Range 1.65V to 1.95V Core Operating Range -40C to +85C Temperature Range Available in 100-lead TQFP Package
M5L8253P-5引脚说明: C型高性能32位RISC架构C高密度以MIPS /瓦C小端C十六位指令集C领袖嵌入式冰8 - 16 -位和32位的读写支持256K的片上SRAM的 32位数据总线C单时钟周期存取字节完全可编程的外部总线接口C最大的外部地址空间的64M字节多达8个C芯片选择C软件可编程8位外部数据总线8级优先级,独立可屏蔽,向量中断控制器C四外部中断,其中包括一个高优先级,低延迟中断要求32个可编程I / O口线三通道16位定时器/计数器C三个外部时钟输入C两多用途I / O引脚每通道2个通用同步C两专用外设数据控制器通道每个USART可编程看门狗定时器先进的节能特性 CPU和外设可停用独立全静态工作中:C 0 Hz至75 MHz的频率范围内的VDDCORE = 1.8,85℃2.7V到3.6VI / O的操作1.65V到1.95V范围核心工作电压范围在- 40C至+85 C温度范围内使用的100引脚TQFP封装
-
The amount of financing capitalization to be requested by party B will be no less than 30 Million Uniter States Dollars($30000000)for a minimum term of the(10)years at an agreed overall annual interest rate cost of eight Percent(8%)to party B.The Overall Interest Rate Cost of 8% is comprised two parts,part one - the bank rate an set by lenderand part two-the commission Rate cost.the commission rate cost will be three percent(3%)of the loan for the first year or eight percent minus the bank rate(8%-the bank rate)which ever is the greater.for eachsubsequent year the commission payment will be 8% minus the bank ratefoe example if the bank rate in the second year is 7% the the second commission payment will be 1
金额融资资本要求由乙方将不低于三千万uniter美元为最低刑期的( 10 )年在一个商定的整体,每年利息成本的8%( 8 %)乙party的整体利益率的费用为8%,是组成由两部分组成,第一部分-银行利率一所订的贷款人项和第二部分-佣金率c o st.the佣金率的成本将三%( 3 %)的贷款为第一年或八%,减去银行利率( 8 %-银行利率),这是以往任何时候都greater.for eachsubsequent委员会今年的付款将被8%,减去银行利率(敌人,例如,如果银行利率在第二,今年是7%,第二委员会的付款将被一
-
objective to assess the fulfillment of round 3 of global fund aids program in china in order to provide basis for selecting scientific preventive measures and making reasonable work plan.methods to analyze the core programs from reports of round 3 of global fund aids program in 72 counties of 7 provinces in mid part of china,and to assess it by combining specific investigated results.results up to dec 31,2006,fulfilling rate of receiving treatment for occasional infection,and the number of preventing aids patients as well as infected persons was 98.57%.the rate of other index overpassed rearranged objectives.of which,the rate of vct was 111.45%,the rate of receiving anti-virus treatment was 108.42%,the rate of programs activities of government and non-government was 133.83%.at least there was one teacher trained living skills about aids.the fulfilling rate of the number of middle schools of developing living skill education about aids was 125.73%.the fulfilling rate of the number of middle school students educated about living skills was 147.53%.conclusion the fulfillment of objective management of round 3 about aids,especially core index was effective.but there existed the problem that fulfilling rate of some index was too high,which would be corrected in the later phase.
对中国中部7个省72个县实施第三轮全球基金艾滋病项目的完成项目指标报表进行汇总,对其中10个核心项目进行分析。结果截至2006年12月31日,10个核心项目中,除接受机会性感染治疗和预防的艾滋病患者/感染者人数的完成率为98.57%,其他指标完成率均超过了预定目标。其中自愿咨询检测人次数的目标完成率为111.45%;接受抗病毒治疗的艾滋病患者数的目标完成率为121.37%;获得关怀与支持的hiv感染者/艾滋病患者及其家庭数的目标完成率为108.42%;政府部门与非政府机构主动开展的项目活动数的目标完成率为133.83%;至少有一位教师接受过艾滋病生活技能培训,并对中学生开展艾滋病生活技能教育的中学数的目标完成率为125.73%;接受生活技能教育的中学生数目标完成率为147.53%。结论第三轮艾滋病项目的目标管理,特别是核心指标的完成情况取得了比较理想的效果,但存在个别指标完成率过高的问题,将在后续阶段予以纠正。
- 相关中文对照歌词
- Little Bit Of Life
- Twice My Age
- 8-Bit World
- Pilot Error
- Just A Little Bit
- A Little Bit
- Un Error De Los Grandes
- A Little Bit Of Love (Is All It Takes)
- Closer
- Fuck The System
- 推荐网络例句
-
They have quite a lot of work to do.
他们有许多工作要做。
-
Let us give you a more elaborate example of this process.
让我们给你这个过程的更多的详细例子。
-
I have a 35 - milimetre film with 26 exposure.
我有一卷可拍26张的35毫米胶卷。