英语人>词典>汉英 : 客运站 的英文翻译,例句
客运站 的英文翻译、例句

客运站

词组短语
passenger depot · passenger station
更多网络例句与客运站相关的网络例句 [注:此内容来源于网络,仅供参考]

Guangzhou University of Traditional Chinese Medicine International Academic Exchange Center Hotel, located in the Airport Road next to the intersection with the Jiefang Lu, from the fairs, Baiyun International Airport, the Guangzhou Railway Station, the provincial bus station, bus terminal car-park just five minutes by car from the Beijing Road, Shang Xiajiu Road and Tianhe Sports Center just 10 minutes by car, convenient transportation connections, is very convenient.

广州中医药大学国际学术交流中心宾馆,座落在机场路与解放路交汇点旁,距交易会、白云国际机场、广州火车站、省汽车站、广园汽车客运站仅需5分钟车程,距北京路、上下九路及天河体育中心只需10分钟车程,交通四通八达,十分便捷。

After every regular bus sends a car, the check ticket record that passenger station gives the unit that enter camp is the primitive evidence that the unit that enter camp uses settle accounts carriage, every order a piece, undertake by primitive credential and passenger station settle accounts; returns some units that enter camp to have close an account every months with passenger station by passenger counterfoil every months.

每辆班车发车后,客运站给参营单位的检票记录是参营单位用来结算运费的原始凭据,每班次一张,每月凭原始凭据与客运站进行结算;还有的参营单位凭旅客票根同客运站进行每月结算。

And released in November 2005 according to the the Ministry of Communication " road is carried " 915 " development program compendium (ask for an opinion to stalk of grain)", to 2010, area of the eastpart part and mid relatively develop all villages and towns that the area needs to build a station, build passenger station of 5 class above, administrative village is built have flag stop or wait booth; is mid owe develop area and western area, the villages and towns of 70% above is built have grade passenger station, the administrative village of 60% should build flag stop or wait booth.

而根据交通部2005年11月发布的《道路运输"十一五"发展规划纲要》,到2010年,东部地区和中部较发达地区需要建站的所有乡镇,建成五级以上客运站,行政村建有招呼站或候车亭;中部欠发达地区和西部地区,70%以上的乡镇建有等级客运站,60%的行政村要建成招呼站或候车亭。

Recently, many researchers regard CSI as an important index of measuring the level of service quality, but in China it lacks in evaluating the level of service quality of the Long-distance passenger station of highway from the view of customer satisfaction, so this paper will supply a gap for above shortage.

近年来,许多学者都将顾客满意度作为衡量服务质量水平的重要评价指标,但目前我国还缺少从顾客满意角度去评价公路长途客运站的服务质量水平的研究,所以本文的研究将弥补这一空白。

Meanwhile , combining with other railway stations in country , the paper also discusses the future development of Chinese railway station , and deeply anatomizes architectural essence .

同时,还结合国内其它铁路客运站的情况,对中国铁路客运站的发展前途进行探讨,进而深刻剖析了&建筑本质&,而且揭示&洋建筑师&的劣行。

Transportation From Shagrila coach station: No. 1 bus on opposite road of the coach station informing the bus driver you are going to Dragon Hostel. 1 Yuan/person.

如若搭乘交通车到香格里拉长途客运站,出客运站到马路对面乘1路公车跟司机说到龙行客栈即可,车票1元/人。

To accurately estimate the passenger mustering capacity and facility utilization, the characteristics of passenger mustering and evacuation in large scale railway station were analyzed. Based on the proposed simulation flow, an effective microscopic simulation model of railway station is developed by path planning, node selection and decision perception.

为准确预测大型铁路客运站旅客聚集能力和设施利用程度,分析大型铁路客运站旅客集散特点,提出旅客集散仿真的基本流程,构建基于个体活动的旅客集散微观仿真模型。

The query type interview of the controller of secure to be assigned personal responsibility for of 6 3 vise general manager of passenger station of be put in charge of passenger transport company, passenger station job makes clear, their great majority cannot give a the Ministry of Communication relative to thoroughly answer " car passenger station administers a regulation " in 4 of safety administration of the regulation main content, and these controller are divided individual outside, have.

对客运企业分管客运站的3名副总经理、6名客运站分管安全工作的负责人的提问式访谈表明,他们大多数不能相对完整地回答出交通部《汽车客运站治理规定》中规定的安全治理的四条主要内容,而这些负责人除个别外,都有。。。

The paper summarizes three essential to research the station carrying capacity: Firstly, need to research the stations fastigium passing capacity, not a day;Secondly, need to study the integrative carrying capacity, namely researchingthe integrated station passing capacity which under the harmonizing between station throat and receiving-departure track operation;Thirdly, need to use combinatorial method to reflect the station passing capacity and the inscape of it.

在前三个章节分析的基础上总结出研究客运专线客运站通过能力的三个要点:一是要研究客运专线车站的高峰通过能力,而非一昼夜通过能力;二是要对客运专线车站通过能力进行一体化研究,即要研究咽喉能力和到发线能力的密切配合下客运站的最终通过能力;三是要以组合能力的概念和方法反映客运专线客运站的通过能力及能力构成的特点。

Then modeling the passenger special railway station throat and receiving-departure track operation processes, and sets up a carrying capacity optimization mode which based on the harmonizing different part of station operation. All these research sets a primary foundation for developing the carrying capacity of passenger special railway station simulation software.

并以此为基础建立能真实反映客运专线客运站咽喉、到发线作业过程及作业之间相互协调配合下的通过能力优化模型,为研制客运专线客运站通过能力仿真软件奠定理论基础。

更多网络解释与客运站相关的网络解释 [注:此内容来源于网络,仅供参考]

一片面包 28 both...and... 两者都:28 a slice of bread

27 a skating champion 滑冰冠军 27 both of us 我们两都 | 28 a slice of bread 一片面包 28 both...and... 两者都 | 29 a talented girl 一个有天分的女孩 29 bus station 客运站

Inter-city bus station:长途汽车客运站

1.2.3.2 机场 Airport | 1.2.3.3 长途汽车客运站 Inter-City Bus Station | 1.2.3.4 公交车终点站 Bus Terminal

passenger concourse:旅客大厅

passenger car 客車 | passenger concourse 旅客大厅 | passenger depot 客运站

The Soloist:独奏者 独奏者

50 婚礼傲客 婚礼傲客 Wedding Crashers 2005 | 81 独奏者 独奏者 The Soloist 2009 | 82 幸福终点站 幸福终点站/航站奇缘(台)/机场客运站(港) The Terminal 2004

daily dispatched passenger number:旅客日发送量

客运站站务工作量 passenger terminal work load | 旅客日发送量 daily dispatched passenger number | 旅客最高聚集人数 maximum gathered passenger number

leader head:水落斗

水路客运站||waterway passenger terminal | 水落斗||leader head | 水落管||leader pipe

stub-end passenger station:尽头式客运站

通过式客运站 through-type passenger station | 尽头式客运站 stub-end passenger station | 客货运站 mixed passenger and freight station