英语人>词典>汉英 : 实际成本 的英文翻译,例句
实际成本 的英文翻译、例句

实际成本

词组短语
incurred cost
更多网络例句与实际成本相关的网络例句 [注:此内容来源于网络,仅供参考]

In monthly closing, calculate cost of goods sold and allocate variance between actual and standard cost to COGS and inventory.

在月结时,负责计算已销货物成本并在已销货物和期末库存之间分配标准成本和实际成本之间的差异。

If the plant is operated as a cost center, manufacturing cost variance between actual cost and standard;planned cost, are used to help measure performance.

如果车间作为一个成本中心,在实际成本和计划成本之间的制造成本差异便是衡量车间及其经理绩效的依据。

Therefore, just like the direct material variance, when the labor cost for a task differs from standard, the direct labor variance can be divided into a labor efficiency variance and a labor rate variance.

正像直接材料差异那样,对一项工作的实际成本与标准成本之间的比较,直接人工成本也可以分成工时量差异和工资率差异两部分来分析。

In Overhead Cost Controlling, these costs are the actual credits from activity allocations.

在间接成本控制中,这些成本是的作业分配的实际成本贷项

In addition, actual costing uses actual costs to valuate inventories of raw materials, semifinished products, and finished products.

另外,实际成本计算使用实际成本来评价库存物料,半成品,以及成品的价格。

In the event of cancellation in accordance with paragraph of this Article, Corporation shall be entitled to reimbursement for all actual costs which shall be properly allottable or apportionable under recognized accounting practices to the performance of this Agreement and its cancellation

如按本条第2款规定撤销协议,公司有权获得按公认的会计惯例合理计算的因本协议的履行和撤销而发生的一切实际成本费用的补偿,外加为实际成本10%的利润。买方以前根据本协议所付款项必须从补偿费中扣减。

C In the event of cancellation in accordance with paragraph of this Article, Corporation shall be entitled to reimbursement for all actual costs which shall be properly allottable or apportionable under recognized accounting practices to the performance of this Agreement and its cancellation, plus a profit which shall be computed at the rate of ten percent (10%) of the said actual cost, Payments previously made hereunder by the Purchaser shall be credited against such reimbursement.

如按本条第2款规定撤消协议,公司有权获得按公认的会计惯例合理计算的因本协议的履行和撤消而发生的一切实际成本费用的补偿,外加为实际成本10%的利润。买方以前根据本协议所付款项必须从补偿费中扣减。

In the case of activity inputs with predistribution of fixed costs, the input quantity variance is equal to the difference between the target costs and the actual costs less the input price variance.

在这个案例中作业输入是用初步固定成本,输入数量差异是等于目标成本和实际成本实际成本的输入价格差异

As the actual cost is greater than the standard cost, it is an unfavorable difference that it overspends number, generally express in positive number; As the actual cost is smaller than the standard cost, it saves number as the favorable difference, generally express with the negative number.

实际成本大于标准成本,其超支数额为不利差异,一般用正数表示;当实际成本小于标准成本,其节约数额为有利差异,一般用负数表示。

This is not mentioned in the cost of the actual cost, but costs are based mainly on the developer's land costs, pre-engineering costs, construction installation works and infrastructure construction costs measured by the cost of these four drawn.

这是中未提及的费用的实际成本,但成本主要是根据开发商的土地成本,前工程费用,建筑安装工程和基础设施建设成本来衡量这些费用的四个得出。

更多网络解释与实际成本相关的网络解释 [注:此内容来源于网络,仅供参考]

actual cost:实际成本

MFG/PRO的成本体系包括:标准成本(Standard Cost);现行成本(Current Cost); 模拟成本(Smulated Cost);实际成本(Actual Cost)四大部分组成. 其中标准成本 是MFG/PRO推荐的财务核算体系,在所有AKZO NOBEL实施的MFG/PRO的企业中,

actual cost:实际成本,实际费用

absorption cost 全部成本,归纳成本 | actual cost 实际成本,实际费用 | administrative cost 管理费用,行政费用

actual cost:实际成本dpk中国学习动力网

actual circulation 实际流通dpk中国学习动力网 | actual cost 实际成本dpk中国学习动力网 | actual expenditure 实际开支;实际支出dpk中国学习动力网

Monitoring Actuals versus Budget:对照预算监测实际成本

Monitoring|监视 | Monitoring Actuals versus Budget|对照预算监测实际成本 | Monte Carlo Analysis|蒙特卡罗分析

CV:成本偏差

成本偏差.成本偏差(CV)是项目成本绩效的一种指标.它等于 挣值(EV)减去实际成本(AC).项目结束时的成本偏差,就是 完工预算(BAC)与实际总成本之间的差值.由于 EVM 成本偏差 指明了实际绩效与成本支出之间的关系,

estimated cost:估计成本

估计成本(estimated cost) 什么是估计成本 估计成本是指尚未实际发生的,而是根据一定资料预先估算的成本. 实际成本是我国企业成本核算的基本原则. 企业在平时核算时可以采用计划成本、定额成本和标准成本等,但最终必须要调整为实际成本.

historical cost:实际成本;历史成本;原始成本

hire-purchase agreement租购协议;分期付款购物协议 | historical cost实际成本;历史成本;原始成本 | HKFE Clearing Corporation Limited香港期货交易结算有限公司

cost incurred account:实际成本帐; 实际费用帐; 已发生成本帐户

cost function 成本函数,费用函数,价值函数 | cost incurred account 实际成本帐,实际费用帐,已发生成本帐户 | cost incurred in current period 本期发生成本

kazi:实际成本中心应计

KAUS 计算碎片 | KAZI 实际成本中心应计 | KAZO 预付定金

valuated actual costs:作价的实际成本

validity start date 有效性开始日期 | valuated actual costs 作价的实际成本 | valuation-closed period 已完成评估的周期