英语人>词典>汉英 : 坪问题 的英文翻译,例句
坪问题 的英文翻译、例句

坪问题

词组短语
plateau problem
更多网络例句与坪问题相关的网络例句 [注:此内容来源于网络,仅供参考]

A theoretical model for predicting ground displacement and deformation due to mining of phosphate body in Wenjiaping by using hyperbolic tangent function was given in this paper.

针对文家坪磷矿地下开采岩体移动变形问题,给出了用于预测分析地下开采引起地表移动变形的双曲正切函数模型。

As a water conservancy project, it has some exceptive requirements for AGC program, such as water dispatching prior to electrical dispatching, carrying out AGC under the condition of water supply.

作为水利枢纽工程,紫坪铺电厂的AGC有自身的特点,如电调服从水调,在保证下游供水的条件下实现自动发电控制,限制功率调节速度等,所以在实际运行中碰到许多特殊问题。

They worry that allowing peasants to sell their land could restore a rural landowning class, and that peasants would sell up in huge numbers and descend upon ill-prepared cities, throwing up shanty towns and pushing up crime.

他们担 心给予农民出售自家土地的权利将会在农村中再次塑造一个地主阶级,而且农民大量出售土地后进城也会给尚未作好接纳准备的城市带来巨大的冲击,产生如简陋坪屋区以及犯罪剧增等等不和谐问题。

The main threats confronting giant panda's winter habitats are unscientifically programming of giant panda reserves in the Qinling Mountains and anthropologic disturbance.

佛坪大熊猫冬季栖息地面临的主要问题是自然保护区区划不尽合理和人类活动干扰。

More than 10 minutes, Peng Zhixiang to Anyuan coal mines, mine in Anyuan leaders Wu Bangguo visited the well-head pressure fan room, floor repair shop, transportation lines and coal washery coal-Ping, to insist on the production of the cadres and workers holiday greetings , and in the field and Anyuan mine who led the research work issues.

10点多钟,彭志祥来到安源煤矿,在安源矿领导的陪同下,先后走访了井口压风机房、地面修理车间、运输线和洗煤厂煤坪,向节日坚持生产的干部职工表示问候,并在现场与安源矿领导研究工作问题。

The research in this thesis successfully resolved the downstream energy dissipation and erosion control problem of Yingping water power station, and thoroughly studied the hydraulic characteristics of the training frusta, which offers certain reference values for similar project problems.

该论文研究成果解决了阴坪水电站闸坝下游消能防冲实际问题,并深入探讨了导流墩的水力特性,为类似工程消能防冲问题的研究提供了参考依据。

In this thesis, downstream energy dissipation and erosion control problem of Yingping power station is studied in the concrete, building the unitary hydraulic model in the laboratory. The scale of this model is 1:40. The energy dissipation effect of this layout in preliminary design is validated and optimized by model experiment. During the test, setting assistant energy dissipation training frusta is put forward and the energy dissipation problem of the project is well settled.

本文以阴坪水电站消能防冲问题为具体研究对象,在实验室建立几何比尺为1:40 的正态水工整体模型,对其初步设计的消能布置方案的消能效果进行模型试验验证与优化研究,提出了设置辅助消能工导流墩的方案,很好地解决了该工程的消能防冲实际问题。

更多网络解释与坪问题相关的网络解释 [注:此内容来源于网络,仅供参考]

plateau problem:坪问题

plateau potential 平台期电位 | plateau problem 坪问题 | plateau ring structure 环形高原构造

short story:短篇小说

"是日本第一部重要的近代文学评论集,小说(novel)一词在日本普遍使用,乃自坪内逍遥提倡开始,"长篇小说"(novel)、"短篇小说"(short story)、"社会小说"、"私小说"(self-novel)、"政治小说"、"问题小说"等小说名词常见於日本报章,