英语人>词典>汉英 : 勘察 的英文翻译,例句
勘察 的英文翻译、例句

勘察

基本解释 (translations)
prospect  ·  prospected

更多网络例句与勘察相关的网络例句 [注:此内容来源于网络,仅供参考]

The stabilities of the accumulations are analyzed by means of geological survey, drilling, exploratory adit, geophysical exploration and scientific research test etc. and then the relevant engineering treatments for various of the accumulations on th

勘察过程中我们采用了地质测绘、钻探、硐探、物探、科研试验等多种勘察方法与手段,在勘察成果基础上对堆积体稳定性进行了分析,并结合对工程的不同影响提出了相应的工程处理措施。

Secondly, according to the characteristics of the Survey Design Projects, the necessity to execute the modern project management has been analyzed in Survey Design Corporations, and the applicable administrant mechanism and modes of the modern project management have been proposed in this thesis.

其次,通过深入分析和研究勘察设计项目的特点,详细论述了在勘察设计企业中实行现代项目管理的必要性,并提出了勘察设计企业现代项目管理的具体内容和适用的管理机制与模式。

The geological engineering investigation of the ancient circumvallation arround Linhai city, should guarantee the safety of the cultural relic,and the investigation is to disclose the circunlvallation s condition, and provides the physical and mechanical properties of the foundation for consolidation design.

临海市古城墙作为文物古迹,进行工程地质勘察既要保证文物安全,又要通过勘探揭露地质条件,为设计提供防渗加固的物理力学指标通过对临海古城墙勘察的实例,介绍了勘察的思路、手段和主要的工程地质问

The selection of geological prospecting in different stages(initial-prospecting, detailed-prospecting)(2)the selection of geological prospecting in the deep-laid and shallow-laid of tunnel project (3)the selection of geological prospecting of tunnel projecting in different geological conditions Finally, the author summed up main problems needing to be solved in tunnel engineering geological prospecting as follow:(1)differentiate stratum and find out the depth and thickness of different stratums in the tunnel section (2)find out geological structure and existence situation of fault, broken zone and weak plane (3)find out weathering level of bed rock to classify surrounding rock combining speed materials (4)differentiate stratum structure of the entrance of tunnel to judge the stability of it (5)find out existence situation and performance of ground water (6)situations of other harmful geological phenomenon In view of above problems and classification of surrounding rock, the author showed principles of rational choosing of methods in geological prospecting and counted disperse range of physical character parameter value in different petrosal character, getting achievements as follow:(1)summarization of effect, merits and demerits of different geological prospecting methods in the tunnel geological investigation (2)method selection and arrangement principle of tunnel engineering geological prospecting in different geological conditions and prospecting stages (3)According to previous experience and cases, the author concluded the物性parameters most in use ,and showed the basis of selecting geological prospecting methods in different geological conditions.

论文中用几个应用实例来说明:(1)不同勘察阶段物探工作的选用;(2)深埋、浅埋隧道工程物探工作的选用;(3)不同地质条件隧道工程物探工作的选用。最后总结归纳出隧道工程物探所需要解决的问题主要有:(1)划分地层,查明隧道通过剖面的各地层深度与厚度。(2)查明地质构造,隧道轴线段有无断层、破碎带、软弱层面等。(3)查明基岩风化程度,从而结合速度资料进行围岩分级。(4)划分洞口地层结构,判断洞口稳定性。(5)查明地下水赋存情况及其活动动态。(6)其他不良地质现象存在情况。针对上述需要查明的地质问题与计算围岩分级情况,论文提出合理选用物探方法的原则,并统计了物性参数值在不同岩性中的分布范围。得出以下研究成果:(1)总结出各物探方法在隧道地质调查中的作用和优缺点。(2)得出不同地质条件下和不同勘察阶段,隧道工程物探方法选择和布置的原则。(3)根据以往工作经验和事例,对常用的物性参数进行了归纳总结,同时介绍了不同地质条件下物探方法选择的依据。

Shanxi Golden Diamond Petroleum Drill Collar Tools Manufacturing Co., LTD Subordinates in Third geological engineering bureau of Shanxi geological prospecting institute.Is a whole people state-owned enterprise, professional manufacturer of oil drilling.

山西金钻石油机具制造有限公司隶属于山西省地质勘察局第三地质工程勘察院,是一家全民所有的国营企业,专业石油钻具制造商。

From the points of view of hydrokinetics, put forward the formula for movement parameters of set-out stage and short-range stage, lay a solid foundation for the theory of hydrokinetics mechanisms of large highspeed rockslide, offer the theoretical proof for the reconnaissance and design of large hydraulic power project, railway and highway, gain the ends of preventing and decreasing the disastes.

在试验研究的基础上,从流体动力学的观点出发提出了大型高速岩质滑坡启程和近程活动阶段运动参数的计算公式,为大型高速岩质滑坡全程流体动力学机理理论的建立奠定了良好的基础,为大型水电工程的勘察设计和铁路、公路新线勘察设计提供理论依据,达到防灾减灾的目的。

Sc.1983 Institute of Project Planning and Research (Changed name to IPPR Engineering International since Oct.2001 、 United to China IPPR Engineering Corporation).Now, President of China IPPR Engineering Corporation, President of IPPR Engineering International, Chief Architect, Professorate Senior Architect, State Grade A Registered Architect State Registered City Planner.

大学毕业后一直在中国中元国际工程公司(曾用名机械部设计研究总院、中元国际工程设计研究院)工作,研究员级高级建筑师、国务院特殊津贴专家,现任公司总裁、总建筑师,担任北京市勘察设计协会常务理事、中国机械工业勘察设计协会常务理事、中国勘察设计协会常务理事、中国建筑学会常务理事、中国建筑学会建筑师分会工业建筑学术委员会主任委员。

According to the demand of survey tasks, high density resistively survey and seismic refraction method were used in the exploration of railway tunnel after analyzing the geology and topographic conditions.

通过对隧道待勘察路段的地质地貌分析,通过甄选对比,并根据勘察任务要求,有针对性的选择应用地震折射法和高密度电法进行综合勘察

The lower apparent resistivity of geothermal area is the result of water and the difference of resistivity between the geothermal area and wall rocks can be detected by using passive SLF electromagnetic explorer, and then the interface between the geothermal area and cap rock and the depth of the area of lower resistivity are derived.

分析了深部地热资源勘察中的地球物理电磁法应用现状,阐明了被动式超低频电磁法在深部地热资源勘察中的可用性和优势;重点论述了被动式超低频电磁法在深部地热资源勘察中的探测机理。

And in combination with the project practice the paper approaches to the arrangement of the prospecting option and compares the common option of the foundation pit enclosure of tunnel and the anti-floating design of foundation bottom.

本文对上海地区城市下立交工程的勘察设计进行了分析总结,并结合工程实践对勘察方案的布置进行了探讨,对地道基坑围护、基底抗浮设计的常用方案进行归纳比较,为今后下立交工程的勘察设计工作提出建议和参考。

更多网络解释与勘察相关的网络解释 [注:此内容来源于网络,仅供参考]

rock burst:工程地质及勘察岩爆

2. 工程地质及勘察泻湖lagoon | 2. 工程地质及勘察岩爆rock burst | 2. 工程地质及勘察岩层产状attitude of rock

clay minerals:工程地质及勘察年粘土矿物

2. 工程地质及勘察泥石流mud flow, debris flow | 2. 工程地质及勘察年粘土矿物clay minerals | 2. 工程地质及勘察凝灰岩tuff

Confined Water:工程地质及勘察承压水

2. 工程地质及勘察沉积岩sedimentary rock | 2. 工程地质及勘察承压水confined water | 2. 工程地质及勘察次生矿物secondary mineral

continental sedimentation:工程地质及勘察陆相沉积

2. 工程地质及勘察流滑flow slide | 2. 工程地质及勘察陆相沉积continental sedimentation | 2. 工程地质及勘察泥石流mud flow, debris flow

dike, dgke:工程地质及勘察岩脉

2. 工程地质及勘察岩浆岩magmatic rock, igneous rock | 2. 工程地质及勘察岩脉dike, dgke | 2. 工程地质及勘察岩石风化程度degree of rock weathering

feldspar:工程地质及勘察长石

2. 工程地质及勘察层理beding | 2. 工程地质及勘察长石feldspar | 2. 工程地质及勘察沉积岩sedimentary rock

fold, folding:工程地质及勘察褶皱

2. 工程地质及勘察造岩矿物rock-forming mineral | 2. 工程地质及勘察褶皱fold, folding | 2. 工程地质及勘察钻孔柱状图bore hole columnar section

fossil:工程地质及勘察化石

2. 工程地质及勘察滑坡landslide | 2. 工程地质及勘察化石fossil | 2. 工程地质及勘察化学沉积岩chemical sedimentary rock

geological map:工程地质及勘察地质图

2. 工程地质及勘察地质年代geological age | 2. 工程地质及勘察地质图geological map | 2. 工程地质及勘察地下水groundwater

marine deposit:工程地质及勘察海积层(台)

2. 工程地质及勘察工程地质勘察engineering geological exploration | 2. 工程地质及勘察海积层(台)marine deposit | 2. 工程地质及勘察海相沉积marine deposit