英语人>词典>英汉 : horizontal displacement的中文,翻译,解释,例句
horizontal displacement的中文,翻译,解释,例句

horizontal displacement

horizontal displacement的基本解释
-

水平位移

更多网络例句与horizontal displacement相关的网络例句 [注:此内容来源于网络,仅供参考]

In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.

本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。

The paper founds GM(1, 1) model of gray prediction theory in order to predict level displacement,and forecast horizontal displacement of 8-8 section of the Olympic Games project with it and compares forecast data and actual data.The result is that GM(1, 1) model may forecast short-term horizontal displacement after the model is proved eligibility. In order to manage long-term horizontal displacement,the paper founds metabolism GM(1, 1) model.At first, founding GM(1,1) model with known data and forecast next numerical value,next renewing founded GM(1,1) model with numerical value at the same time abnegating first data,and then forecast nest numerical value with same method.

本文为了预测土钉支护水平位移,建立了GM(1,1)灰色系统理论预测模型,应用灰色预测法GM(1,1)模型对奥运工程地下通道I标段8-8剖面的土钉支护产生的水平位移进行了预测,并与实测值进行比较,得出灰色预测法模型经检验合格后可以对工程进行水平位移的短期预测;为了使GM(1,1)模型同样适用于长期预测,用新陈代谢的GM(1,1)模型,即根据己知数列来建立GM(1,1)模型,预测一个灰数值,然后不断地将预测值补充到己知数列之后,每补充一个再去掉一个最老的数据构成新的数列,建立一个新的GM(1,1)模型,预测下一个值。

The concrete dam displacement is studied considering the factors such as foundation modulus increasing with depth, seepage coefficient reducing as depth, seepage coefficient anisotropic, curtain and drainage in the dam heel and seepage field and stress field coupling. Some conclusions are obtained: if the foundation is considered only with the seepage volume load, the dam top horizontal displacement of the reference base point develops upstream. When the foundation size increases, the reference base point's horizontal displacement increases. However, the value measured by the reversed pendulum anchored to the rock foundation is often regarded to be absolute displacement. The above practice is estimated to be limited when the water load on the dam foundation is taken into account.

分析了地基变形模量随深度逐渐增加、渗透系数随深度逐渐减小、坝基渗透系数各向异性、坝踵设置帷幕排水,以及考虑渗流场和应力场耦合等对混凝土坝位移分量的影响,得出如下结论:作用在地基上的水荷载,使混凝土坝坝顶相对参考基点(倒垂锚固点或坝踵正下方1倍坝高处)的水平位移指向上游,而参考基点的水平位移随地基截取范围的增大而增大,由于大坝工程上常将倒垂线锚固在岩基深处,并认为该倒垂线测值为绝对位移。

更多网络解释与horizontal displacement相关的网络解释 [注:此内容来源于网络,仅供参考]

horizontal projection:水平投影图

horizontal displacement:水平位移 | horizontal projection:水平投影图 | multiparameter analyzer:多参数仪

ook angle:断面前角

15 Helixform 螺旋成形法 | ook angle 断面前角 | 18 Horizontal displacement 水平位移

horizontal terraces:水平阶地

水平沟 horizontal ditches | 水平阶地 horizontal terraces | 水平位移工作点 operative mark of horizontal displacement