查询词典 under construction
- 与 under construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Under market economy conditions, there is a construction industry to reflect the true level of construction, scientific, reasonable construction of fixed, or necessary.
在市场经济条件下,有一个建筑行业,以反映真实水平的建设,科学,合理的施工定额,或必要的。
-
Departments directly under the Joint formulated and issued the "Regulations on the construction industry to properly resolve outstanding issues of foreign labor wages," which defaults to the project due to a result of foreign labor wages in arrears of construction units, as well as the default for no reason, deliberately underpay migrant workers wages of construction enterprises have established severe penalties.
6部门的直接领导下的联合制订并发布了"关于建造业,妥善解决悬而未决的问题的外籍劳工的工资,"默认为,由于该项目的结果外籍劳工工资拖欠的建设单位,以及默认情况下没有任何理由,蓄意underpay民工工资的建筑企业建立了严厉的惩罚。
-
The cracking furnace piling of ethene facilities has been completed. 0.3 million/year LLDPE and 0.3 million/year HDPE piling, stake prefabricating, the construction within the plant and the preparation ofthe road construction within the plant and the preparation of drain and pipes are under construction.
乙烯装置的裂解炉打桩已完成。30万吨/年LLDPE装置和30万吨/年HDPE装置的打桩和桩预制以及厂区内道路的施工及雨排、地管施工的准备工作正在加紧进行。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Dozens of companies under the jurisdiction of the civil engineering construction subsidiary, decoration companies, steel companies, fire works, road and bridge companies, professional installation companies, Hong Xiang real estate development company, Shun Po security supplies, construction machinery Leasing companies such as the production and management units and currently employs more than 5,000 people, all types of engineers and technicians more than 1,700 people, senior engineers and technicians from more than 500 people, the construction division Yiji 4, the project manager qualification certificates held by 171 persons.
公司下辖十个土木建筑施工分公司、装饰装修公司、钢结构公司、消防工程公司、路桥公司、安装专业公司、鸿祥房地产开发公司、顺宝安全防护用品公司、施工机械租赁公司等生产经营单位,现有员工5000余人,各类工程技术人员1700余人,中高级工程技术人员500余人,壹级建造师4人,持有项目经理资格证书者171人。
-
Companies under the Hitachi Group, Division of earth and machinery, accessories division, the cause of integrated industries, such as the Ministry of Industry five units, is the Hitachi Construction Machinery Co., Ltd. Hitachi excavator, Shandonglingong Provisional Construction Machinery Co., Ltd. The licensing loaders, Tianjin Construction Machinery Plant to Meet licensing bulldozers, Japan Konan MKB, South Korea Saehan broken hammer, Japan Jomo lubricants, Germany Furui De lubricants in east China, central China's A-level agents.
公司下设日立事业部、土石方机械事业部、配件事业部、综合产业事业部等五大产业单位,现为日立建机株式会社日立挖掘机,山东临工工程机械有限公司临工牌装载机,天津建筑机械厂移山牌推土机,日本甲南MKB、韩国世韩破碎锤,日本矫马润滑油、德国福瑞德润滑油在华东、华中地区的A级代理商。
-
The paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects,such technologies as:manufacturing and fixing of reinforcement,steel reinforcement fixing baseplate,web plate and top plate respectively and lifting the steel skeleton into form,requirements of design and manufacturing and way of utilization for dismantling-erection type formwork and hydraulic formwork,optimization of concrete ratio,concrete pouring process of two ends of beam in priority over the middle,in sequence of first baseplate followed by web plate and top plate at last,concrete pouring in inclined section and in horizontal layer,concrete vibration mainly byexternal vibrator in assistance with internal vibrator,methods and regulation for steam curing of concrete,dual controls over stress and strain to ensure quality of prestressing workmanship,construction method of effective beam moving by heavy-weight special moving facility,some regulations and key notes about construction of grouting under pressure,beam ends sealing,water-proof layer on the bridge surface system,protective coating.
文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力~应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
-
This paper studies the change of lime reduction of lime-ash soil under the following three conditions in an inside experiment,such as low temperature,stable temperature and exposed found. The relations among the different condition,lime content and ages in lime-ash soil construction process are drawn,which can provide reference for construction units to grasp its changes rules,and lay a foundation for making feasible construction plan and measurement criterion.
通过室内试验对二灰土在恒温箱低温养生、养护室标准养生和暴露养生这三种养护条件下石灰剂量的衰减规律进行试验研究,得出的二灰土底基层施工中养护条件、实测灰剂量与龄期之间的相互关系,可为施工单位掌握二灰土石灰剂量变化情况提供依据,并为制定出科学可行的施工组织计划和检测标准打下基础。
-
It is understood that the country wooden furniture and wood-based panel Quality Center is located at Pizhou City Economic Development Zone, by Pizhou city government to invest some 124 million yuan to build, covers an area of 84.6 mu, total construction area of the main 20,000 square meters, since early in March 2007 laid the foundation stone to start the construction has been completed the main engineering building, currently under way to install curtain walls, internal and external decoration, the construction of ancillary facilities and greening, lighting and other projects, has been ordered by the total value of 17,800,000 yuan equipment abroad advanced equipment ordered all arrive in Singapore, Shanghai, Nanjing and other ports, in the domestic order of the instruments and equipment manufacturers have all been completed and arrived at the designated locations by the end of March until the Center can be installed after delivery, commissioning, trial operation input .
据了解,国家木制家具及人造板质量中心位于邳州市经济开发区由邳州市政府投资约1.24亿元兴建,占地84.6亩,总建筑面积面积主要二点零零零万平方米自2007年3月月初奠基开工建设,已完成主体工程建设,目前正在安装玻璃幕墙,内部和外部装饰,配套设施及绿化,灯光和建筑其他项目中,已经由一七八〇〇〇〇〇元订购设备的总价值国外先进设备下令所有抵达新加坡,上海,南京等港口的仪器和设备制造商国内秩序,已全部完成,并在指定地点到达在3月底之前,中心还可以交付后安装,调试,投入试运行。
- 相关中文对照歌词
- Under Construction
- Going Under
- Under The Sea
- Under Lock And Key
- Ice Cream
- Trouble Under Your Roof
- Her Black Wings
- Under A Very Black Sky
- Under Control
- Under My Shades
- 推荐网络例句
-
This paper designs the communication system of radio telescope FAST.
针对500m口径球面射电望远镜FAST分布式控制系统的特点完成了其通信系统的设计。
-
Political sheep's step-by-step a large number of fossils unearthed in the county soil Ma Ali after rural village in the middle of sallow pelitic siltstone.
步氏和政羊化石大量出土于广河县阿力麻土乡后山村,产于灰黄色泥质粉砂岩中。
-
If you start very rapidly with high dose you will have flatulence just as if you were to take a high fiber diet but if you start very slowly and low dose and titrate very slowly then you will avoid most of the dose symptoms.
如果您以高剂量快速开始,您会有如同摄入高纤维饮食似的肠胃气胀;但是,如果您以低剂量缓慢开始,并且缓慢滴定,您将可避免绝大多数剂量依赖性症状。