查询词典 train off
- 与 train off 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Soon the train stopped and the mother heard the son say, All passengers who are disembarking the train, please remember to take all of your belongings with you. We thank you for riding with us today and hope your ride was a pleasant one. We hope you will ride with us again soon. For those of you who are just boarding the train, we ask that you stow all of your hand luggage under the seat, remember there is no smoking except on the club car.
不一会火车停了,妈妈听到儿子说:准备下车的乘客请带好您的随身物品,感谢您与我们搭载这次列车,并且希望您这次的旅途愉快,我们期待您再次乘坐我们的列车,想要上车的乘客,我们建议您把您的行李放在座位下面,请记住只有在俱乐部车厢才可以吸烟。
-
Soon the train stopped and the mother heard the son say All passengers who are disembarking the train please remember to take all of your belongings with you. We thank you for riding with us today and hope your ride was a pleasant one. We hope you will ride with us again soon. For those of you who are just boarding the train we ask that you stow all of your hand luggage under the seat remember there is no smoking except on the club car.
不一会火车停了,妈妈听到儿子说:准备下车的乘客请带好您的随身物品,感谢您与我们搭载这次列车,并且希望您这次的旅途舒畅,我们期待您再次乘坐我们的列车,想要上车的乘客,我们建议您把您的行李放在座位下面,请记住只有在俱乐部车厢才可以吸烟。
-
Let me tell you, train stations, 24-hour service telephone 86,011,111 (24-hour telephone complaint service) rate as follows: direct phone inquiries, trains, fares, train lines, to reach and dock sites along the way to the opening moments, the train was late circumstances, additional Linke of the station, agent point distribution and the moment of conversion vehicles and so on.
让我来告诉你吧,火车站24小时服务电话 86011111(24小时投诉服务电话)费率为:市话费查询列车班次、票价、列车开行、到达以及沿途停靠站点的到开时刻、列车正晚点情况、车站加开临客情况、代理点分布情况和中转换车时刻等。
-
The stationary control system which core function is interlock logic control is a significant part of the train operation control system. The switch, route and train control are disposed and the train operating safe are protected by the interlocking system.
地面运行控制系统是中低速磁浮列车运行控制系统的重要组成部分,联锁是地面控制运行系统的核心功能,实现对管辖区域内进路、道岔、列车的逻辑控制,保障列车的安全运行。
-
Conversely, if the train right onto the train by the force are to the inside, when the two trains meet, it is likely there is danger of collision, the train left the two-track line of reasoning is here.
相反,如果在部队上火车火车权的内,当两列火车开会,很可能有相撞的危险,火车离开了双轨的推理在这里。
-
Researchs on Train Formation Plan is started from 50's in our nation. The old railway scientists and technologists present a lot of models and algorithms seeking optimal single wagon group Train Formation Plan, which greatly developed research theory on Train formation plan.
我国铁路对于列车编组计划的研究是从50年代开始的,老一辈铁路科技工作者先后提出了许多寻求单组列车编组计划最优方案的模型和算法,极大地丰富了列车编组计划研究的理论基础。
-
The analysis shows that it is feasible and effective to apply fault tree analysis method to passenger train fire hazard assessment. The method can exposit the various factors and logical relations of passenger train and the casualties in fire comprehensibly, and provide reliable reference for the passenger train fire prevention and minimizing casualties.
通过分析表明,将事故树分析法应用于旅客列车火灾风险评估中是可行有效的,该方法能够对导致旅客列车发生火灾和旅客列车火灾引起人员伤亡事故的各种因素及逻辑关系做出较全面的阐述,并为旅客列车火灾的预防以及最大限度地减少人员伤亡提供了可靠的参考依据。
-
The results show that the air crossing pressure pulse magnitude of the container generated in the tunnel is 3.46 times that generated in open air when container flat wagon at the speed of 160 km/h passed by EMU moving at the same speed. Both the lateral force and overturning moment of the container train during the crossing induced in open air and tunnel are approximately proportional to the square of running speed of the passing train. The pressure of crossing side and uncrossing side for the container flat wagon is almost equal since the one-dimensional characteristic of pressure distributing induced in the tunnel is not faintish. Consequently, the value of the lateral force and overturning moment of the container train generated in open air is greater than that generated in the tunnel, about 1.1 times.
研究结果表明:集装箱平车以160 km/h的速度与动车组等速交会时,在隧道内会车时车载集装箱中部压力变化幅值是在明线会车时的3.46倍;在明线和隧道内会车时,集装箱列车受到的侧向力和侧滚力矩均与交会列车运行速度近似成平方关系;因隧道内压力分布一维特性较强,集装箱平车交会侧与非交会侧压力相差并不大,因此,在明线会车时集装箱平车受到的侧向力和侧滚力矩均比隧道会车时的大,大约是其1.1倍。
-
The realization monolithic integrated circuit system double audio frequency, this radio has used double audio frequency decoding chip MT8870, demodulates the tonic train signalling from the frequency-modulated signal, and separates the double tonic train signalling from the tonic train signalling to enter the double audio frequency decoding electric circuit implementation letter command to decode, thus carries on the low gear rate using the frequency modulation channel the control command transmission.
为实现单片机控制的双音频解码,本收音机采用了双音频译码芯片MT8870,从调频信号中解调出音频信号,并从音频信号中分离出双音频信号进入双音频解码电路实行信令解码,从而利用调频信道进行低速率的控制指令的传输。
-
When the train running continuously, the temperature of axles and the axle's bearing will rise. This will induce some accidents about the train. It is a great hidden trouble when the train running.
列车长时间的运行会使列车轴承和车轴温度升高,有可能导致切轴甚至列车颠覆,是列车运行中的重大隐患。
- 相关中文对照歌词
- This Train
- This Train
- All Aboard (Ride It)
- This Train Is Bound For Glory
- Meet Me At The Station
- This Train
- Ghost Train
- Bullet Train
- Ghost Train
- This Train
- 推荐网络例句
-
Among which is the mindset, perceptions and moralities of those who accept mini- military tasks for economic gains.
其中最重要的是心态,观念和道德的人谁接受小型军事任务的经济收益。
-
In time course imaging, activity peaked 2 days after coronary ligation.
在时程成像检测,活性峰值在冠脉结扎后2天。
-
Though P2P model provides convenience file exchanging environment, but it fallows lots of users pirating in P2P network.
与过去不同的是,在P2P模式中,使用者的盗版行为不仅有下载的行为,也包括了分享的行为。