英语人>网络例句>structural engineer 相关的网络例句
structural engineer相关的网络例句

查询词典 structural engineer

与 structural engineer 相关的网络例句 [注:此内容来源于网络,仅供参考]

Or above 2 years as Technical Engineer in Industry Control Engineering companies or Designing Institutor

新毕业的相关专业研究生;or 两年以上工控产品项目开发,调试和技术支持工作经验

Software project management is an interdisciplinary of software engineer and project management.

软件项目管理是软件工程和项目管理的交叉学科,是项目管理的原理和方法在软件工程领域的应用。

B the amount certified in each Interim Payment Certificate within 56 days after the Engineer receives the Statement and supporting document s; and

期中支付证书中开具的款额,时间是在工程师收到报表及证明文件之日起56天内;以及

B the amount certified in each Interim Payment Certificate within 56 days after the Engineer receives the Statement and supporting documents; and

期中支付证书中开具的款额,时间是在工程师收到报表及证明文件之日起56天内;以及

Iii "Interim Payment Certificate" means any certificate of payment issued by the Engineer other than the Final Payment Certificate.

期中付款证书,指由工程师签发的除最终付款证书之外的所有付款证书。

4 The Engineer may be any interim certificate make any correction or modification in any previous certificate which shall have been issued by him and shall have authority, if any work is not being carried out to his satisfaction, to omit or reduce the value of such work in any interim certificate.

92.7 在提交最终报表时,承包商应给雇主一份书面结算清单,进一步证实最终报表中的总额,相当于由合同引起的或与合同有关的全部和最后确定应支付给承包商的所有金额,并将一份副本呈交工程师。

Prior to issuing the Taking-Over Certificate for the Works, the Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would be less than the minimum amount of Interim Payment Certificates

但是,在颁发工程的接收证书之前,若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

However, prior to issuing the Taking-Over Certificate for the Works, the Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would (after retention and other deductions) be less than the minimum amount of Interim Payment Certificates stated in the Appendix to Tender.

但是,在颁发工程的接收证书之前,若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

The Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would (after retention and other deductions) be less than the minimum amount of Interim Payment Certificates stated in the Appendix to Tender.

若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

The Engineer shall issue an Interim Payment Certificate for the first installment after receiving a Statement (under Sub-Clause 14.3 ) and after the Employer receives the Performance Security in accordance with Sub-Clause 4.2 and a guarantee in amounts and currencies equal to the advance payment.

在工程师收到报表(根据第14.3款),并且雇主收到了由承包商提交的根据第4.2款规定的履约保证,以及一份金额和货币与预付款相同的银行预付款保函后,工程师应为第一笔分期付款颁发一份期中支付证书。

第96/100页 首页 < ... 92 93 94 95 96 97 98 99 100 > 尾页
相关中文对照歌词
Monkey And The Engineer
The Family
Hotel Expressionism
Hey Porter
Hey, Hey, Train
Hey Porter
Love Engineer
Love Transmission
Mice & Gods
Midnight Flyer
推荐网络例句

Chimborazo and Cotopaxi, took me by the hand.

越过琴博腊索山和科托帕克西山。

This car is in a good condition.

这辆车的状况很好。

You can divide them into two categories.

您可以分为两类他们。