查询词典 stopped process
- 与 stopped process 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This process organically combines the circulating fluidized bed combustion technology with boiler-front low-temperature dry distillation technology, the hot ash of circulating fluidized bed is used as the hot carrier to pyrolyze the coal and generate tar and gas. The semi-coke after pyrolysis is fed into boiler to generate steam for power generation and heat supply. The total energetic efficiency of this process is 10% higher than the single power generation process.
中科院山西煤化所开发的煤炭干馏-循环流化床燃烧多联产技术,是将循环流化床燃烧技术与炉前低温干馏技术有机地结合起来,用循环流化床锅炉的高温循环热灰作为载热体使煤发生热解,产生焦油和煤气,热解后的半焦作为锅炉燃料送入炉内燃烧以生产蒸汽,用来发电和供热,多联供集成系统比单纯发电系统的总能效率提高约10%。
-
Our main result is for any immigration-emigration birth and death matrix random environment, q, with birth rateless than death rate, there are a unique q-process in random environment P9*(0;t and a bi-immigration birth and death process in random environment with random transition matrix P(9*{Q);t such that P9*(0;t is ergodic and X* is a strictly stationary process.
在这一部分,我们将经典的生灭过程理论推广到了随机环境下,证明了对任意给定随机环境移入-移出-生灭密度矩阵q,当生率小于死率时,存在一个唯一的随机环境下的q过程—θ~*(0;t和随机环境下的移入-移出-生灭过程,使得严平稳,遍历,其随机转移阵为?
-
Rapid testing is not a technique, but a n overarching process of understanding the context of a test project and maximizing the value of our time. One part of that process is to cut out anything that isn't necessary. Another part is to reconceive testing as a process of heuristic inquiry , rather than a clerical task.
快速测试不是一项技能,而是基于测试项目本身而又为了达到最大化利用时间目的的提炼的最重要的过程,该过程的一部分是要剔除不必要的内容,另一部分是要以启发探索的方式重新思考测试,而不是把它当作一项例行的任务。
-
Machining process and general information:· General Information – Tooling o Plan to have own engineering group as company expands o Hwasung is subcontracted to do engineering currently o Uses same cutting tools as in Korea facility – all diamond o Regrind tools if can o Hwasung has capability to surface grind, repair dies, and make molds with wire EDM process · General Information – Machining o Boundary samples are used: okay, borderline, not good o Quality room has separate windows for incoming and outgoing parts o New equipment will be coming in from FM LaGrange plant o Each operation has pictures and job instructions for what to check and which gage to use to check part o Parts are manually loaded into machine or pallet, depending on line o Auditor checks parts for verification: after operator checks part, puts in bin, auditor checks part and reloads back on line o Have tool management system o A pokeyoke check is used for orientation prior to loading o Machines are guarded o Mostly have CNC machines o Manual chip collection systems o If automated, have robots with grippers to load/unload parts from pallets o After final inspection, operator visually inspects and loads onto plastic dunnage with the crown up and loads into the washer o Repairs: filing down of burrs or sharp edges after anodizing the crown o Have 2 Excello machines for special machining of the pin bores o 2.7% scrap for gasoline pistons o Cycle time is 18 seconds for gasoline piston o Process – Wash o Spray system o 4 stations: heated wash, wash with degreaser, 2 rinse stations o Uses RO water o Operator blow dries piston and puts on dunnage with crown up o Parts wheeled into coating room o Needs major improvements here o Chemical analysis done for bath in chemical room o Comments/Observations: o Relatively small piston facility, but plans for additional space.
加工工艺和一般信息:·–的一般信息工具 o 有自己的工程集团,随着公司的扩展计划 o Hwasung 是分包做当前工程 o 用途相同的扦插工具,如在韩国设施–所有钻石 o 回收料工具如果可以 o Hwasung 已表面研磨,修复模具,和模具丝电火花加工能力过程·一般信息–加工 o 界限示例用于:好交界,不好 o 质量房间有单独的窗口传入和传出的部件 o 新设备会在来从调频拉格朗日植物 o Each 操作具有图片和工作说明的什么复选,计为使用检查部分 o 部件是手动加载到机器或托盘,取决于行 o 审计检查验证零件:置于 bin,运算符检查部分后,核数师检查部分并重新加载回行上 o 有工具管理系统 o 为 pokeyoke 复选用于在加载之前的定位 o 机被保护 o Mostly 有数控机床 o 手动芯片收集系统 o 自动,如果有与要加载/卸载部分从托盘 grippers 机器人 o 后最终检验,运算符将直观地检查并加载到与塑料衬垫冠了与到洗衣机负荷 o 修复:提交下毛刺或锋利的阳极氧化冠后 o 有 2 Excello 机特别加工的销孔 o 2.7%废料的汽油活塞 o 周期时间是为汽油活塞式 18 秒 o 过程–洗 o 喷射系统 o 4 站:加热洗、与脱脂剂洗、 2 冲洗站 o 使用反渗透水 o 运算符吹干活塞式并将了放冠衬垫 o 部件轮式进涂层房间 o 需要重大改善在这里 o 为在化学的房间里浴做的化学分析 o 注释/结论: o 相对小活塞式设施,但额外的空间的计划。
-
On the base of practical transformer substation main connection, electric components and system circuit model are first formed in the paper; analyze vacuum arc characteristic and medium resume are analyzed, then, according to vacuum chamber physical process of switching AC arc, resume process are divided into three stages: sheath development, neutral particles diffusion and static characteristic, with that, calculating model of medium resume strength is erected and applied in the computing of vacuum circuit breaker interrupting transform overvoltage; In the paper, Saber software is used to simulate a whole switching process; As follows, overvoltage characteristic of vacuum circuit breaker switching no load and load transformers, kinds of influence factors are analyzed in detail; At last, vacuum circuit breaker switching capacitance group overvoltage formative causes and electrode refining for lessening reignition are discuss.
本文针对中低压变电站的实际主接线建立各电气元件及系统的电路模型;在真空电弧的特点及间隙的介质恢复特性上,依据真空断路器灭弧室分断电弧的物理过程,将真空电弧熄灭后的恢复过程分为鞘层发展、中性粒子扩散和静态特性三个阶段,建立了相应的介质恢复强度的计算模型,应用到切除变压器操作过电压的计算中;采用Saber仿真软件模拟计算真空断路器切除变压器操作过电压;并分别对真空断路器切除空载及负载变压器操作过电压的特点与影响操作过电压的各种因素做了详细的分析;最后简要分析了真空断路器开断电容器组过电压的形成原因及为减少重燃的电极老炼措施。
-
On the base of practical transformer substation main connection,electriccomponents and system circuit model are first formed in the paper;analyze vacuum arccharacteristic and medium resume are analyzed,then,according to vacuum chamberphysical process of switching AC arc,resume process are divided into three stages:sheathdevelopment,neutral particles diffusion and static characteristic,with that,calculatingmodel of medium resume strength is erected and applied in the computing of vacuumcircuit breaker interrupting transform overvoltage;In the paper,Saber software is used tosimulate a whole switching process;As follows,overvoltage characteristic of vacuumcircuit breaker switching no load and load transformers,kinds of influence factors areanalyzed in detail;At last,vacuum circuit breaker switching capacitance groupovervoltage formative causes and electrode refining for lessening reignition are discuss.
本文针对中低压变电站的实际主接线建立各电气元件及系统的电路模型;在真空电弧的特点及间隙的介质恢复特性上,依据真空断路器灭弧室分断电弧的物理过程,将真空电弧熄灭后的恢复过程分为鞘层发展、中性粒子扩散和静态特性三个阶段,建立了相应的介质恢复强度的计算模型,应用到切除变压器作过电压的计算中;采用Saber仿真软件模拟计算真空断路器切除变压器作过电压;并分别对真空断路器切除空载及负载变压器作过电压的特点与影响作过电压的各种因素做了详细的分析;最后简要分析了真空断路器开断电容器组过电压的形成原因及为减少重燃的电极老炼措施。
-
On the base of practical transformer substation main connection,electriccomponents and system circuit model are first formed in the paper;analyze vacuum arccharacteristic and medium resume are analyzed,then,according to vacuum chamberphysical process of switching AC arc,resume process are divided into three stages:sheathdevelopment,neutral particles diffusion and static characteristic,with that,calculatingmodel of medium resume strength is erected and applied in the computing of vacuumcircuit breaker interrupting transform overvoltage;In the paper,Saber software is used tosimulate a whole switching process;As follows,overvoltage characteristic of vacuumcircuit breaker switching no load and load transformers,kinds of influence factors areanalyzed in detail;At last,vacuum circuit breaker switching capacitance groupovervoltage formative causes and electrode refining for lessening reignition are discuss.
本文针对中低压变电站的实际主接线建立各电气元件及系统的电路模型;在真空电弧的特点及间隙的介质恢复特性上,依据真空断路器灭弧室分断电弧的物理过程,将真空电弧熄灭后的恢复过程分为鞘层发展、中性粒子扩散和静态特性三个阶段,建立了相应的介质恢复强度的计算模型,应用到切除变压器操作过电压的计算中;采用Saber仿真软件模拟计算真空断路器切除变压器操作过电压;并分别对真空断路器切除空载及负载变压器操作过电压的特点与影响操作过电压的各种因素做了详细的分析;最后简要分析了真空断路器开断电容器组过电压的形成原因及为减少重燃的电极老炼措施。
-
ResultsLoureirin B inhibits the TTXR peak sodium currents in a dose-dependent model and the inhibition is reversible. 0.2mmol/L loureirin B accelerates the inactive process of the TTXR sodium currents and delays the revivable process but does not affect the activitive process.
结果龙血素B对TTXR钠电流呈浓度依赖性抑制,且抑制作用可逆;高浓度的龙血素B(0.2 mmol/L)加速TTX-R钠通道电流的失活过程,延迟其复活过程,对激活过程无显著影响。
-
ResultsLoureirin B inhibits the TTXR peak sodium currents in a dose-dependent model and the inhibition is reversible. 0.2mmol/L loureirin B accelerates the inactive process of the TTXR sodium currents and delays the revivable process but does not affect the activitive process.
结果龙血素B对TTXR钠电流呈浓度依靠性抑制,且抑制作用可逆;高浓度的龙血素B(0.2 mmol/L)加速TTX-R钠通道电流的失活过程,延迟其复活过程,对激活过程无显著影响。
-
Extreme climate elements such as torrential rain, extreme high temperature, extremely low temperature and so on are always used to analyze and evaluate an extreme climate event. There was a continuous sleeting and freezing process with low-temperature in the beginning of 2008. The process had the characteristics of large and sustained precipitation and snowfall, deep and long-time snow accumulation, long time in daily low-temperature with not so-low extreme low temperature. Therefore, it wasn't objective and accurate to choose any single one of these elements to analyze and evaluate this process.
评估极端气候事件,往往用某一项极端气候要素进行分析评估,如暴雨量、极端最高气温等。2008年初出现的持续低温雨雪冰冻过程,具有雨雪量大、持续雨雪时间长、积雪深、积雪时间长、低温持续时间长、但极端最低气温不低的特点,用其中任一因子评估定位该过程,都不能全面反映该过程的综合影响特征。
- 相关中文对照歌词
- You Stopped Loving Me
- Never Stop Loving You
- The Antidote
- Part Of The Process
- Illumination
- A Process So Familiar
- No Matter What
- I Never Stopped Loving You
- Demon
- Process
- 推荐网络例句
-
They have quite a lot of work to do.
他们有许多工作要做。
-
Let us give you a more elaborate example of this process.
让我们给你这个过程的更多的详细例子。
-
I have a 35 - milimetre film with 26 exposure.
我有一卷可拍26张的35毫米胶卷。