英语人>网络例句>slide block 相关的网络例句
slide block相关的网络例句

查询词典 slide block

与 slide block 相关的网络例句 [注:此内容来源于网络,仅供参考]

The only way I could be sure to get everything lined up was to do away with the inner slide and replace it with a machined out block of plastic with all the parts fitted.

我唯一可以肯定地得到一切排队是为了破除内部幻灯片和取代它的机加工出来的塑料块的所有部件装配。

From geometry and forming mechanism, five secondary styles of the extensional-type structural style, including tilted faulted-block, slide faulted-ramp, buried hill draping, gravitative antiform and diapir, were reported.

滑动断阶构主要发育在坳陷的陡坡带,底辟构造常见于坳陷的洼陷带,潜山披覆构造多发育在盆地四周隆起区与洼陷中的潜山带,而重力背形构造大多发育在主断层的下降盘。

The wall must be designed so that the individual pieces of the wall do not pullout, separate, or slide apart. In a modular block wall, the designer must be concerned with the potential of the tieback failing under tension or pulling out from the soil or the facia.

墙的设计必须使个别墙不分离,独立或外移,墙的一个独立单元,设计必须满足来自墙体和面板的压力和推力引起的潜在破坏联结面的要求。

In the project of Dongfang-Yangpu-Haikou Long Distance Transportation Pipeline Crossing through Changhua River, the construction technique of launch way with slide boards is utilized, that is, the pulley block fixed on opposite bank tows the pipeline directly. The pulley block of a 32t low speed windlass successfully towed the integral pipeline section through the river.

在海南东方-洋浦-海口输气管道工程的昌化江穿越施工中,采用了发送道滑板施工技术:滑轮组过江直接牵引管道,32t慢速卷扬机牵引滑轮组将管道整体牵引过江,牵引穿越一次成功。

Also because of the road turned to the bottom of the top players on the team at the top of the ramp, the rock loose the season still has the possibility of the Rolling Stones hit the players, Yakou the 50-100 m section of the rock surface is a monolithic block staggered zone, rock face an average of 6-7 meters high, 70-80 degrees slope is very smooth too laborious climb directly to undesirableGreat can not see well because of the snow line, and only a walk around the rock surface, in the cross section of rock surface from time to time is close to the ridge walk, the most recent is only one meter away from the cliff, and at the foot of ice or hard snow if the time is easy to slide down the ridge, more dangerous.

另外因为路线转向上方队员就在下方队员斜上方,岩石松动的季节还是有滚石击中队员的可能,垭口上50-100米路段,是整块整块的岩面交错的地带,岩面平均高6-7米,坡度70-80度,很光滑直接攀上太费力不可取,由于雪大看不出好的路线,只有绕着岩面走,在跨越岩面时有部分路段是贴着山脊走,最近的离悬崖仅一米,而且脚下如果结冰或者是硬雪时很容易滑下山脊,比较危险。

Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .

本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。

A structure combining slide block core-pulling and locating of metal insert was designed for forming a combined socket.

介绍了组合基座的滑块抽芯结构与金属嵌件定位结构的合理组合,扩展了滑块单一抽芯的使用功能,经实际生产,模具动作可靠,保证了塑件的质量,对带有金属嵌件模具的设计提供一定的参考。

Theoretical analusis and caculation indicate that with the improved design the power loss caused by the slide block can be reduced to one sixth of that in the original design. Because the p...

此外,在计算中也可看出,油膜压力反馈原理也适用于其他各类滑靴结构式的油泵、油马达,它对我国现有的柱塞式油泵、油马达的设计具有一定的参考价值。

No slide block and lifter will be made.

此处有倒勾,能否减料,使公母模靠破,不做滑块和斜销

Distance from slide block centre to the frame ""..

滑块中心奎机身距离。。

第5/7页 首页 < 1 2 3 4 5 6 7 > 尾页
推荐网络例句

He is the most remarkable man that I have ever known.

他是我知道的人中最值得注意的人。

Increased appearance of lymphocele was noticed in patients with diabetic nephropathy, congenital malformations of the urinary tract, and inflammatory diseases, including glomerulopathy and extraglomerular ones, after high-voltage radiotherapy and after removal of the renal graft.

经过高压放射疗法和切除移植肾后,在糖尿病肾病患者、泌尿系统先天性畸形患者和炎症患者身上发现淋巴囊肿有所增加,包括肾小球病和球外疾病等。

Pagans and partygoers greeted the summer solstice at the ancient stone circle of Stonehenge.

异教徒和社交聚会常客在史前巨石柱的古老的石圈附近庆祝夏至。