查询词典 sequential sampling plan
- 与 sequential sampling plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Although the PLAN is known to have been studying the aircraft carrier building technology and operational principles since the mid-1980s, no concrete evidence had been found proving the existence of such a building programme until recently when the Kuznetzov-class carrier Varyag, obtained by the PLAN from Ukraine in 2002, emerged from a Dalian Shipyard dry dock painted in PLAN grey.
自20世纪80年代中期以来,中国海军就开始研究学习航母建造技术和操作技能,但一直没有足够的事实证实中国航母建造计划的存在,直到2002年中国从乌克兰获得了库兹涅佐夫级航空母舰&瓦良格&号,这艘航母后来出现在了大连造船厂的干船坞中,并且涂上了中国海军的灰色。
-
For many years it has been widely speculated that the PLA Navy is interested in building or acquiring an aircraft carrier to improve its power projection capabilities. Although the PLAN is known to have been studying the aircraft carrier building technology and operational principles since the mid-1980s, no concrete evidence had been found proving the existence of such a building programme until recently when the Kuznetzov-class carrier Varyag, obtained by the PLAN from Ukraine in 2002, emerged from a Dalian Shipyard dry dock painted in PLAN grey.
自主建造轻型航母:在刘和其他强烈支持&远洋攻势战略&的中国海军官员的推动之下,早在1980 年代初期,中国军方的研究机构就已经开始全面展开建造一艘排水量在15000—20000吨的能够携带直升机和诸如&海上猎兔犬&一类垂直/短距起降飞机的轻型航母的可行性研究项目,尽管最终未能实现,但为以后可能的建造积累了技术基础。
-
The building materials industry garden area plan uses 3000 Mu land, the total investment will be 1,500,000,000 Yuan, issue of project plan use land 600 Mu , 10 new ceramic production line will be invested, the second phased project plan use land 2400 Mu.50 ceramic production line will put into use in 2010 with the annual output of ceramic production 2 hundred million square miters, After an issue of project had ended, the annual production may amount to 20 hundred million Yuan.
建材工业园区规划用地3000亩,总投资15亿元,其中一期工程规划用地600亩,新上陶瓷生产线10条,二期工程规划用地2400亩,到2010年达到50条陶瓷生产线,年产建筑陶瓷2亿平方米。一期工程结束后,年产值可达到20亿元。
-
This dissertation is addressed on the problem of enterprise procurement plan with outsourcing in global business environment. And the research outspreads with Model Building, Algorithm Design and Algorithm Evaluation.The main work and results is shown as follows.Firstly, the actual research background and motivation about such a topic is outlined and more comprehensive and in-depth survey on the research progress of procurement plan is made. It is indicated that integration procurement plan in supply chain level is the research trend in future.
本文研究了全球商务环境下的带转包企业采购计划问题,遵循建立模型、设计算法和评估算法流程开展研究,主要工作及成果如下:(1)概述了问题的实际研究背景与动机,较全面深入地综述了采购计划问题的研究进展,指出面向供应链的集成采购计划是未来的发展趋势。
-
Face this kind of situation, the author thinks not to answer to the control that funds overspends from production very busy season just begins, and should be when plan of funds of year of make known to lower levels of management department of superior of the beginning of the year, build a rigorous plan management and budgetary management system, combine the characteristic of highway conserve branch, act on the principle of keep expenditures within the limits of income, making overall plans and take all factors into consideration, year funds the plan presses different content, with the work out estimated method, below the analysis, premise that forecast, undertake index is decomposed, layer upon layer fulfil, fore-and-aft decompose team and group, each accessary production unit, transverse fulfil each room, departmental door, implement pyramid form manage by different levels, make every every branch, worker has index, responsible, form fore-and-aft after all, transverse control a network to stagger of edge, freely.
面对这种局面,笔者认为对经费超支的控制不应从生产大忙季节才开始,而应在年初上级治理部门下达年度经费计划时,就建立起一套严格的计划治理和预算治理制度,结合公路养护部门的特点,本着量入为出、统筹兼顾的原则,将年度经费计划按不同内容,用编制预算的方法,在分析、猜测的前提下,进行指标分解、层层落实,纵向分解到班组、各附属生产单位,横向落实到各股室、各部门,实行金字塔形的分级治理,使每个部门、每个职工都有指标、有责任,形成一个纵向到底、横向到边、纵横交错的控制网络。
-
Risk management can be divided into five parts, these five parts are respectively: The risk of turning uncertainty into essential task that the risk is stated discerns the course, the risk changing into being arranged in the order of PRI tabulates the risk analysis course of the necessary task to state the risk, will tabulate and change the definition risk of the task needed in order to tackle the plan in risk to plan the course according to the risk that PRI will be arranged , monitor the risk state and give notice to start the risk and tackle the risk that take action and follow the course, with carry out the action plan of the risk, the risk in order to drop the risk to the task that the acceptable degree needs to finish deals with the course.
风险管理可被划分为五个部分,这五个部分分别是:将不确定性转化为风险陈述的必要任务的风险识别过程,将风险陈述转变为按优先级顺序排列的风险列表所需的任务的风险分析过程,将按优先级排列的风险列表转变为风险应对计划所需要的任务的定义风险计划过程,监视风险状态以及发出通知启动风险应对行动的风险跟踪过程,和执行风险行动计划,以求将风险降至可接受程度所需完成的任务的风险应对过程。
-
The main clue is the normal design process of the regulatory plan. This paper analyzes the plan and development of domestic and overseas high-tech parks and then theorizes a design framework for regulatory plan of high-tech parks in china.
本文以控制性规划设计的一般流程为主线,通过对国内外高技术产业园区规划实践的分析,最终建立了一个关于我国高技术产业园区的控制性规划设计框架。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
As we have learned main component is system of fee of Internet bar plan software plan cost, hardware plan cost.
据了解网吧计费系统主要分为软件计费、硬件计费。
- 相关中文对照歌词
- Dolla Bill
- Wake Up Call (One More Time)
- The God Song
- Live & Direct
- Plan B
- Sleeping In
- Backfired
- Backup Plan
- Let's Plan A Robbery
- The New Workout Plan
- 推荐网络例句
-
Pachomius manual labour was organized as an essential part of the monastic life; and since it is a principle of the monks as distinguished from the mendicants, that the body shall be self-supporting, external work of one sort or another has been an inevitable part of the life ever since.
根据圣pachomius体力劳动组织作为一个重要组成部分寺院生活;以来,这是一个原则的和尚,作为有别于乞丐,该机构应自支撑,对外工作的这种或那种已一个必然的一部分,生活至今。
-
In order to study the effects of parametrical rolling on the ship movement and tilts, in allusion to ship's navigating in regular following waves, the equation of ship rolling motion is transformed into normal Mathieu equation by proper variable replacement when strong parametrical excitation in restoring moment varied according to sine or cosine wave.
为研究参数横摇对船舶运动和倾覆的影响,通过对船在规则波上随浪航行时,恢复力矩中出现的1个以正余弦规律变化的强参数激励项进行适当的变量置换,将船舶的横摇运动方程转换成标准形式的Mathieu方程。
-
I agree with you that three-fourths of al your road equipment should be replaced.
我同意你有关3/4的公路设备都要更换的建议。