英语人>网络例句>rock boring machine 相关的网络例句
rock boring machine相关的网络例句

查询词典 rock boring machine

与 rock boring machine 相关的网络例句 [注:此内容来源于网络,仅供参考]

According to the change regularity of deformation modulus, combining with the rock mass structure characteristic of region studied, using interpolation method, the deformation modulus of rock mass in 36# adit can be deduced. The average vertical deformation modulus of rock mass during 0-70 zone is 39Gpa, and the horizontal deformation modulus of rock mass is 51. 3GPa in nature stress state and 50.8GPa in engineering load state. The average vertical deformation modulus of rock mass during 70-140 zone is 32. 2Gpa, and the horizontal deformation modulus of rock mass is 41GPa in nature stress state and 42. 6GPa in engineering load state. It will be a good reference of engineering design and evaluation.

9根据节理岩体变形模量变化规律,结合研究区岩体的结构特点,采用插值的方法对36号平硐岩体进行变形模量的推测,得到0-70段岩体的平均铅直向的变形模量为39GPa,水平向的变形模量:天然应力状态下为51.3GPa,工程荷载作用下为50.8GPa;70-140段岩体的平均铅直向的变形模量为32.2GPa,平向的变形模量:天然应力状态下为41GPa,工程荷载作用下为42.6GPa,这为工程设计、评程设计、评价等提供了必要的参考。

The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme

主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。

The comparative investigation of the characteristics of deformation and AE were conducted and the results are presented as followed: 1. The characteristics of rock AE are correlated to the strength, joints, cracks, and the size and hardness of crystalline grain. 2. The sequence of AE can be divided into four phases: beginning phase, tempestuousness phase, drop phase and dreariness phase. The loss and the duration of the phases are correlated to the rock character and flaws in the rock. 3. The AE rate characteristics are not almost concordant with the AE energy rate. 4. Besides the homogeneity, the strength of rock contributes the activity of AE. The higher the strength is, the lower the activity is. 5. There is a dreariness phase before the failure of most kinds of rock. 6. Whether the precursor is obvious is correlated to rock the character, and the precursor of AE rate is more apparent than the precursor of AE energy rate comparatively.

通过对比研究这六种不同岩石的变形和声发射特征发现,岩石声发射受到岩石强度、节理裂隙和晶粒软硬大小等的影响;岩石声发射过程存在初始区、剧烈区、下降区和沉寂区,各个阶段是否存在及持续时间与岩石强度、内部缺陷等有关;岩石的声发射事件率特征与能量率特征并不完全一致;岩石的声发射活性除了受其均匀性影响外,还受到岩石的强度影响,强度越小,声发射活性越强;大多数岩石破坏前存在一声发射沉寂区;岩石的破坏前兆是否明显跟岩性有关,相比较而言,岩石破坏时的声发射率前兆比声发射能量率前兆更为明显一些。

The T68 horizontal boring machine boring axis axial flees moves has boring lathe main axle revolution time the revolution transmission chain each coordination tolerance clearance.

T68卧式镗床镗轴轴向窜动产生于镗轴运转时的传动链各配合件的配合间隙。

A series of special boring rod s made by using fine control boring unit solves the problem that produces easily rejected parts because of difficult adjustment in machining high-precision hole of shell components in ordinary boring machine.

利用微调精镗镗刀头设计制造了系列专用镗杆,解决了壳体类零件在普通镗床上加工高精度孔时,因对刀困难而出现辅助时间过长并易产生废品的问题,使生产效率和产品质量得到大幅度提高。

In order to ensure the integrity of rock carvings, the construction team had to take the original Canadian mechanized off hilltops Act, in the grotto of the left foot attached to the thickness of the rock, the rock drilling machine with internal combustion engines, compressed air rock drill holes in the parent rocks on the hit row, and then by hand drill rod of the ways to split the rock.

为了保证雕刻岩体的完整性,施工队不得不采取原始加机械化的劈山法,在留足石窟所依附的岩体厚度后,用内燃机凿岩机、压缩空气凿岩机在母岩上打排孔,然后用人工打钢钎的方法把岩石劈开。

Major equipment has: 2M X 10M ordinary lathe, 250 and below, various types of boring machine specifications, 5M roll 7M double column vertical lathe comb, 100X6M deep-hole drilling, 3M X12M gantry milling bed, HR Two-table machining centers, CNC boring 130 milling machine, frequency, medium frequency quenching machine, 15T electric furnace, etc..

主要设备有:2M X 10M普通车床、250及以下规格各类镗床、 5M 辊梳齿 7M双柱立车、 100X6M 深孔钻、3M X12M 龙门铣刨床、HR双工作台加工中心、130数控镗铣床、工频、中频淬火机床、15T电炉等。

The company mainly engaged in varieties have: cars, milling, planing, grinding, drilling, boring, shearing machine, bending machine, hydraulic press, forging equipment, general machine tools, EDM, wire cutting, CNC lathes, CNC milling machine, Machining Center CNC machine tools, etc..

公司主要经营品种有:车、铣、刨、磨、钻、镗、剪板机、折弯机、油压机、锻压设备等普通机床,电火花、线切割、数控车床、数控铣床、加工中心等各类数控机床。

NC bender, tube ends former, tube expanding and shrinking machine, tube cutting machine, Pressing machine, tube boring machine, tube swaging machine,...

后生制造与研发的机种大致分类:; 1管成型系列:管末成型机、多段式管端成型机、缩管机、扩管机、弯管。。。

Coal plants put into operation for fully mechanized mining equipment, machine boring machine, shearer, hydraulic support, hydraulic pillar reprint machines, scraper plane, belt machine, crushing machine, such as machinery and equipment repair and parts processing, and strive to become the northern part of Shanxi Province the largest coal-machine parts and repair store base, while at the same time enhance the Mine mining transportation equipment parts and repair capacity of processing capacity.

厂房投产后用于煤机综采设备的掘进机、采煤机、液压支架、液压支柱、转载机、刮板运输机、皮带机、破碎机等机械设备修理及配件加工,力争成为山西北部最大的煤机配件超市及修理基地,同时不断提升矿山采掘运输设备配件加工能力及修理能力。

第16/100页 首页 < ... 12 13 14 15 16 17 18 19 20 ... > 尾页
相关中文对照歌词
Rock N' Roll
I Wanna Rock (Interstate Trafficking Remix)
Robot Rock
Rock Wit It
Just Like Me
I Rock, Therefore I Am
I Wanna Rock
Rock The Shocker
Machine
War Machine
推荐网络例句

For the head-teacher of the class said that I had seriously broken the school rules,which led me to a three-day suspend class.

为什么呢?因为我的班主任说我严重的违反了校规,于是让我停课三天。

Many of them believe that the conversion of thousands of working-class folk in England spared that nation from the mass carnage and the tyranny that came with the revolution in France.

他们之中有许多人相信,在英国数以千计的劳工阶级之悔改信主使英国免於遭受如法国大革命所造成的大屠杀和专制暴政。

The popular Gawker network of news and gossip sites was shut down by a similar attack on Monday.

周一,深受欢迎的新闻与八卦网站Gawker也因为类似的攻击而瘫痪。