英语人>网络例句>rib pattern 相关的网络例句
rib pattern相关的网络例句

查询词典 rib pattern

与 rib pattern 相关的网络例句 [注:此内容来源于网络,仅供参考]

The plate beam finite element method of spatial computation is presented for the plate rib T-beam bridge with multi-rib.

由此提出了板肋式多肋T梁桥空间计算的板梁有限单元法。

Has 2 years foreign trade experience and the personnel management skill;be good at the foreign trade service the procedure and the international service each operation, like blackmails, booking, packing, loading, excels to make the international service the material (quotation, packing list, invoice, B/L, C/O, OCI, and so on); Excels with each kind of customer exchange and the coordinated cooperation; Has the good human relations ability and handling ability, and has 2 years trustee rib principle and manager the rib principle work experience, can very good processing each kind of sharp-edged situation and does each work.

具有2年的外贸经验和人事管理技能;擅长外贸业务的程序,擅长国际业务的各个操作,如打单,booking,packing,loading,擅长做国际业务的资料(quotation,packing list, invoice,B/L,C/O,OCI,等);擅长与各类客户交流和协调合作关系;具有良好的交际能力和处理能力,并具有2年的董事肋理和经理肋理的工作经验,能很好的处理各种突发情况和做好各项工作。

The system reliability analysis method of arch-bridge is presented based on the failure model of arch rib, which is the most important failure model of arch-bridge. The control sections of arch rib in the analysis of bearing capacity reliability are determined according to the "five-spot coincidence method", which is often used in arch-bridge design with Chinese code.

针对拱式桥结构体系中的主要受力构件—拱肋进行分析,借鉴拱桥设计中的&五点重合法&确定研究截面,进而根据该截面的不利情况确定荷载布置型式。

The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.

在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。

The concrete composite box net joint floor is one kind of new-style floor. It is composed of the small prefabricated component with the cast-in-place concrete rib beam. The box and rib beam form a whole structure that has continuous box section and undertake the load together.

混凝土叠合箱网梁楼盖是一种新型的楼盖形式,是由小型预制构件与现浇混凝土肋梁结合成具有连续箱型截面的整体结构,箱体与肋梁共同受力。

Numerical simulation was conducted to investigate the flow field of internal cooling passages with both rib-roughened walls and film hole suctions and discharge coefficients of film holes,with rib angles 45°,60°,90°,120°respectively.

利用有限体积法对三维不可压缩的N-S方程进行离散,对同时带肋和气膜孔出流的内流冷却通道在45°,60°,90°,120°肋的结构下进行了数值模拟。

The integrated optical chip we designed in the dissertation is composed of a symmetrical Y-branch power splitter, two phase modulators and the TE/TM mode polarizer. Here the up-electrode of phase modulator covers the rib waveguide directly. For the metal-cladded rib waveguide, the loss of different mode is different.

由于相位调制器采用上下电极结构,上电极直接覆盖在脊波导之上;因此利用金属覆盖的脊波导对不同偏振模式的光具有不同的传输损耗这一特性,将相位调制器的上电极同时作为TE/TM模式偏振器使用,这样无需制作额外的偏振器,整个器件的尺寸可以减小。

For the structure stress condition, the dead load is born mainly by continuous rigid-frame, and the live load is born by both the arch rib and the main beam, the force separately bora by the arch rib and the main beam is influenced by the whole rigidity of beam and arch, and by areas of flexible hanger rod, the structure perforce is no longer same with the common beam and arch, and the inner force analysis progress is more complex to the common bridge system, especially, the multi-direction stress analysis to the combination area of pier、 arch and beam is very difficult, for such reasons, so it is very necessary and important to have stress performance analysis in the combination area of pier、 arch and beam.

从结构受力情况来看,梁体自重主要由连续刚构承受,活载由拱肋与主梁二者共同承受,各自承受力的大小受梁、拱相互整体刚度、柔性吊杆面积的大小影响,结构性能已不同于一般的拱与梁,结构内力分析的过程较一般桥梁体系较为复杂,特别是墩、拱、梁结合处的多向受力状况的分析难度更大,所以对该桥式结构,墩、拱、梁结合部的结构受力特性进行进一步地理论分析测验研究也就显得十分必要和迫切了。

A raised rib on the surface of cloth.A worsted fabric with a distinct diagonal rib .

马裤尼一种精纺毛料纤维,带有明显的斜纹凸起罗纹

These lesions were whitish-gray and pitted in appearance, and were located on the visceral rib surface near the rib head adjacent to the pleura.

这些损伤呈灰白色,并在表面上有凹痕,它们位于接近胸膜的肋骨顶端接近内脏的部分。

第6/100页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
Pattern Of My Life
Patterns
Pattern Walks
Dance Pattern
I Want My Rib Back
The Pattern Is Broken
Closer Now
My Rib
Give Her The Keys
Ghost
推荐网络例句

The role of the environment is very important.

的作用,环境是非常重要的。

At that time, the High Court of England and Wales Court of Queen's Bench president of William Murray, Lord Mansfield in June 22, 1772 ruling:"No matter then there is the inconvenience, but there must be a decision, I can not say that this case under the law in England are permitted or authorized; are so black should be released."

当时的英格兰及威尔士高等法院王座法庭院长William Murray, Lord Mansfield于1772年6月22日宣判:「无论有那麽不便,但总要有个决定,我不能说这件案在英格兰法律之下是准许或认可;所以黑人是应该被释放。

You can't walk into a store and take something out and then, 21 days later, if you decide to keep it, you pay the store!

你不可能去商店拿回一样东西,然后21天后,在决定留下它时,才付钱给商店。