英语人>网络例句>plate beam 相关的网络例句
plate beam相关的网络例句

查询词典 plate beam

与 plate beam 相关的网络例句 [注:此内容来源于网络,仅供参考]

Then according to the cascade of IPS and LPS, the multi-stage rearrangeable nonblocking Omega network was introduced. Moreover, the method of bipartition graph was adopted to ascertain the node state of each stage. At last, a module of the rearrangeable nonblocking Omega network, which was integrated with polarizing beam-splitter,λ/2 wave plate and perfect shuffle Plates, was constructed.

该方法通过逆混洗(Inverse Perfect Shuffle, IPS)和左混洗(Lott Perfect Shuffle, LPS)的串联,构成多级的可重排、无阻塞的Omega网络,采用二分图法依次确定各级节点开关的状态,最后通过偏振分光棱镜(Polarizing Beam Splitter, PBS)、半波片(λ/2 wave plate)和PS Plate的组合,得到可重排、无阻塞的Omega网络交换模块。

Steel moment-resisting frames with welded beam-to-column connection were traditionally regarded as having excellent performance, and widely adopted in steel constructions, but this opinion changed after the 1994 Northrige earthquake and the 1995 Hyogoken-Nanbu earthquake. These earthquakes also arouse engineers to resurvey the behavior of end-plate connections. It is well known that end-plate connections have definite flexibility, which can increase damp, prolong period, and decease swing of structure. So it can reduce the damage, and is one of the best choices for resisting earthquake.

中文题名钢框架梁柱端板连接在循环荷载作用下的破坏机理及抗震设计对策副题名外文题名 Collapse mechanism and design criterion of steel beam-to-column end-plate connections under cyclic load 论文作者郭兵导师顾强学科专业结构工程研究领域\研究方向学位级别博士学位授予单位西安建筑科技大学学位授予日期2002 论文页码总数127页关键词钢结构框架结构抗震设计钢框架梁柱端板连接馆藏号BSLW /2003 /TU392 /6 传统观点认为,梁柱焊接刚性连接具有较好的抗震性能,因此在工程中得到了广泛地应用,但1994年的Northrige地震和1995年的阪神地震改变了这种传统观点,这两次地震也引起了工程技术人员对端板连接的再审视。

A channel stiffener for end-plate beam-to-column connections is introduced to meet some architectural needs in this study.

本文介绍了梁柱端板连接的一种满足某种建筑要求的加劲方法,即采用槽钢代替传统的加劲方式作为加劲肋。

Based on plate-beam structure and layer-plate model, the time delay on sloughing rockburst in mines is studied.

研究表明,在压应力集中区内,近自由表面的裂纹在低侧压时,将平行于壁面沿最大压力方向扩展,在一定的压力下,受自由表面的影响,这种扩展是不稳定的。

Compared with the research of the geometric nonlinear finite element method home and aboard in the components such as bar, plate, beam and shell element, the present problems is analyzed and the future research direction is described for the theoretical research and program design of geometric nonlinear finite element method.

综合比较了几何非线性有限元法在杆、梁、板、壳等方面的国内外研究成果,指出目前仍存在的问题,提出今后的发展方向,为几何非线性有限元的理论研究与程序设计提供参考。

In addition, the matters needing attention in prestress stretching are presented in order to ensure construction quality of concrete hollow plate beam .

结合具体的工程概况,对模板的制作与安装、预应力波纹管安装、穿束方法、浇筑混凝土等关键工序的质量控制要点作了阐述,并提出预应力张拉的注意事项,从而确保混凝土空心板梁的质量。

The plate beam finite element method of spatial computation is presented for the plate rib T-beam bridge with multi-rib.

由此提出了板肋式多肋T梁桥空间计算的板梁有限单元法。

The paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects,such technologies as:manufacturing and fixing of reinforcement,steel reinforcement fixing baseplate,web plate and top plate respectively and lifting the steel skeleton into form,requirements of design and manufacturing and way of utilization for dismantling-erection type formwork and hydraulic formwork,optimization of concrete ratio,concrete pouring process of two ends of beam in priority over the middle,in sequence of first baseplate followed by web plate and top plate at last,concrete pouring in inclined section and in horizontal layer,concrete vibration mainly byexternal vibrator in assistance with internal vibrator,methods and regulation for steam curing of concrete,dual controls over stress and strain to ensure quality of prestressing workmanship,construction method of effective beam moving by heavy-weight special moving facility,some regulations and key notes about construction of grouting under pressure,beam ends sealing,water-proof layer on the bridge surface system,protective coating.

文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力~应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。

Experiment 1. Observation of electron beam deflection in the electric field Will voltage electron beam deflection plate to tie the direction switch "is" location, rotating clockwise direction deflection plate voltage Potentiometers (RP2), the electron beam is deflected upward, the greater the voltage between the deflection plate, the electron beam deflection angle the bigger.

实验一。观察电子束在电场中的偏转将电子束偏转板电压方向开关扳到&上正&位置,顺时针方向旋转偏转板电压电位器(RP2),电子束则向上偏转,偏转板之间电压越大,则电子束偏转的角度越大。

Will voltage electron beam deflection plate to tie the direction switch "is" location, rotating clockwise direction deflection plate voltage Potentiometers (RP2), the electron beam is deflected upward, the greater the voltage between the deflection plate, the electron beam deflection angle the bigger.

实验一。观察电子束在电场中的偏转将电子束偏转板电压方向开关扳到&上正&位置,顺时针方向旋转偏转板电压电位器(RP2),电子束则向上偏转,偏转板之间电压越大,则电子束偏转的角度越大。

第1/16页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

It is also known as one of the most poisonous naturally occurring substances.

它也被称为一个最自然发生的有毒物质。

The greatest stress is found at the location on the cross section where V is the largest.

最大应力出现在横截面上V为最大的地方。

It is the most important three water problem which our country faces in the 21st century that flood and waterlog, drought and shortage of water, the deterioration of water environment.

洪涝灾害、干旱缺水、水环境恶化是二十一世纪我国面临的三大水问题。