查询词典 moving average
- 与 moving average 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Rolling tube equipment, goods fork, adjusting-distance fork, pushing and pulling equipment, cardboard box clip, fork clip, side-moving, brick transporting equipment, paper winding clip, non-arm clip, flexible fork, circle-pole clip, bucket clip, dual-functional fork, multi-functional tray fork, carrying-load stabilizing equipment, soft package clip, dumping and reversing fork frame, front-moving fork, revolving fork, multi-functional steel arm clip, revolving fork.
各种叉车属具:卷管器、货叉、调距叉、推拉器、纸箱夹、叉夹、侧移叉、砖块搬运器、纸卷夹、无臂夹、伸缩叉架、圆杆夹、桶夹、两用叉夹、多用托盘叉、载荷稳定器、软包夹、倾翻叉架、前移叉、旋转器、多用刚臂夹、旋转叉
-
Equipped with a box cutter, a rechargeable cordless 4.8-volt screwdriver, a measuring tape, a level, a putty knife, and more, this all-in-one kit features 135 tools that get you up to speed for moving in, fixing up, moving out, and everything in between.
配有一个盒子刀,可充电无绳4.8伏的螺丝刀,一个皮尺,一个层面上,一个油灰刀等等,这一切功能于一身的功能,135套工具,让你加快速度,在移动,固定起来,迁出,并在一切之间。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .
如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
This effect can arise, for instance, on a machine-tool compound slide, where the top slide is moving in the X direction, while the cross slide is simultaneously moving in the Y direction.
这种效应可能会出现,例如,在机床滑动化合物,其中最幻灯片是在X方向移动,而同时交叉幻灯片是在Y方向发展。
-
In the system function, it must realize moving the machine hand, moving the sugar dish, providing the paper, cutting paper, curling, connecting the sugar, crest the sugar and dialing the sugar etc. All these functions need the different power. It can be controlled with the transmission system.
系统功能中要实现机械手转位、送糖盘转位、供纸、剪纸、抄纸、接糖、顶糖及拨糖等功能,它们都需要不同大小的动力,这就需要传动系统的调节。
-
At the same time,three dynamic models of cylinder powder green-preform are set up ,which are :die and corefixed on the die shoe , core moving with green-preform, core and die moving downwardin relation to green-preform. The theoretical equations of the green-preform densities andpressing stresses of the three pressing conditions are also derived.
同时建立了凹模与型芯固定在下模座、型芯随压坯一起运动和型芯与凹模相对于压坯向下运动等三种圆环形粉末压坯压制的力学模型,导出了这三种压制条件下的压坯密度与压制压力的理论公式;其结果能够指导粉末冶金模具设计,为发挥模具材料的潜力提供依据。
-
A controlled number of these dots are purposely moving uniformly in the same direction, and the test subject simply has to say whether he believes those dots are moving to the left or right.
一定数量的点被控制着均匀的向同一方向移动,而被测试者只被要求简单的说出他认为这些点的移动方向是向左还是向右。
- 相关中文对照歌词
- Average Guy
- Keep Moving
- Ordinary Average Guy
- Sicker Than Yo Average
- Average B-side
- Slow Down
- Everyday Superhero
- Club Rocker
- No Average Angel
- Extraordinary
- 推荐网络例句
-
The system can be widely used in belt weighing and batching process control,etc.
介绍了基于智能模糊控制的嵌入式配料系统的设计方法,对模糊PID控制过程和系统调零作了重点的讨论,同时给出了PID控制的程序流程图和系统定长调零子程序。
-
"I dunno," she answered,"but if you show me aroun', I'll recognize it from the lighthouse just outside the porthole."
"我不知道,"她回答说,"如果你能带我转转,我能认出来的,因为灯塔就在舷窗外。"
-
That experience was of great benefit to me.
那次经历对我很有益处。