查询词典 load draft
- 与 load draft 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The main content included in the paper is as follows: The European identification methods of type of wave load is introduced and compared with the methods in Code of Hydrology for Sea Harbour. In order to reveal their difference, they are tested by the experiment data. The relation between phase and frequency are analysed through the Hilbert and wavelet transformations. And a new method of identifying the breaking wave load is set up based on the linear relation between wave height and wave press before the breakwaters. The probability distribution is tested by the statistic of experiment data. Based on the experiment data, the paper analysed the influence of reflection coefficient according to different factors, and its property is got. The work property of charmfered breakwater under breaking waves is analysed. Through the statisticof its wave press and wave force the distribution of press on the breakwater front face and its reducing effect to breaking wave force are proved.
本文基于此,通过实验研究,主要作了如下工作:介绍了欧洲波态划分方法,分析与我国方法的异同,通过实验进行了验证;通过 Hilbert 变换和小波变换对波浪破碎的相频特性进行了分析,通过建立波高与波压关系来判别破碎波浪力;对破波条件下波浪力的分布进行了统计研究,验证了其分布类型;利用实测资料,分析了不同因素对反射系数的影响,得出了不同周期、波浪要素、破碎率下反射系数体现的不同规律;分析了破碎波作用下削角堤的工作特性,通过对堤面所受的波压力和总力的统计分析,验证了压强分布规律及削角堤对波浪力的削减作用。
-
Then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
承包人在运送货物前应通知工程师或其代表有关货物的重量及其他特殊事项,还要告知他打算采取的保护,加固方法。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .
如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
The results showed that material degradation has great impact on ultimate load capacity of structure: the load factor on limit state dropped rapidly and brittle characteristics was aggravated at the same time.
结果表明材料的性能退化对结构的极限承载能力有较大影响,破坏时的载荷因子出现大幅下降,且破坏时的脆性特征加剧,有从整体破坏向局部破坏转化的趋势。
-
In the third chapter, the problem of WCDMA network capacity has been introduced from the point of wireless planning. Through the analysis on WCDMA system load factor, the interference level allowance as well as the signal to noise ratio, the relation among WCDMA system capacity, coverage and the grade of service is demonstrated. The method to compute system parameters, such as traffic volume, system capacity, load factor, disturbance allowance and plot radius is also presented.
第三章则从无线规划的角度提出了WCDMA网络的容量问题,通过对WCDMA系统的负荷因子、干扰电平容限以及信噪比的分析计算,阐述了WCDMA系统中容量和覆盖范围及服务质量三者之间的关系,并详细讨论了WCDMA无线规划中业务量、系统容量、负荷因子、干扰容限和小区半径等系统参数的确定。
-
According to heat load source of die cavity, temperature distribution gradient equations and heat flux equations and the peak value equations of temperature load at die cavity surface have been obtained with research of temperature distribution and transfer laws of die surface by unsteady heat transfer theory.
摘要根据锻模型腔热负荷来源,通过非稳态传热理论,分析研究了模具工作表面层的温度分布与传递规律,给出了型腔表面温度分布梯度和热流密度公式,并给出了锻模型腔表面的温度负荷峰值的计算公式。
-
According to heat load source of die cavity, temperature distribution gradient equations and heat flux equations and the peak value equations of temperature load at die cavity surface have been obtained with research of temperature distribution and transf
摘要根据锻模型腔热负荷来源,通过非稳态传热理论,分析研究了模具工作表面层的温度分布与传递规律,给出了型腔表面温度分布梯度和热流密度公式,并给出了锻模型腔表面的温度负荷峰值的计算公式。
- 相关中文对照歌词
- The Weight
- Draft Me
- Bulletproof
- The Weight
- The Weight
- The Weight
- Mother Load
- The Weight
- The Weight
- Take A Load Off
- 推荐网络例句
-
"Second Life is remarkably easy to work with, and is very popular,"
"第二次生命是显着容易的工作,并且很受欢迎,"
-
For example, we usually assume that materials are homogeneous and isotropic and free of internal defects or flaws.
为了得到适合有限元分析的模型,我们必须经过如图2所示的简化步骤。
-
Rev. 20:15 And if anyone was not found written in the book of life, he was cast into the lake of fire.
启二十15 无论谁在生命册上不见是记著的,就被扔在火湖里。