英语人>网络例句>furnace bed 相关的网络例句
furnace bed相关的网络例句

查询词典 furnace bed

与 furnace bed 相关的网络例句 [注:此内容来源于网络,仅供参考]

Circulating fluidized bed boiler ; water wall worn-out ; furnace sectional area ; gas velocity ; coal burning caloricity

循环流化床;水冷壁磨损;炉膛截面积;烟气速度;燃煤发热量

It uses two normal-pressure fluidized beds and makes the material circulate between the two beds, the fluidized bed boiler produces steam and the fluidized bed coal cracking furnace is used for pyrolyzing coal powder to produce meidum caloricity coal gas; the heat quantity needed for coal pyrolysis is provided by hot ash acted as heat carrier.

流化床煤气-蒸汽联产工艺及装置,它采用两个常压流化床,使物料在两床之间循环,流化床锅炉产生蒸汽,流化床煤裂解炉用来热解粉煤,产生中热值煤气;热灰作为热载体提供煤热解所需的热量。

CFB clean coal power generation technology is a kind of combustion technology for power generation, it is the internal combustion in circulating fluidized bed boiler with coal particles, and at low-temperature combustion furnace conditions add to the amount of limestone achieve desulfurization, denitration cleanliness coal power generation technology.

CFB发电技术是煤清洁燃烧发电技术的一种,它是在循环流化床锅炉内燃用颗粒煤,并在低温燃烧状况下向炉内加入适量石灰石实现脱硫、脱硝的洁净煤发电技术。

1 Oven order 5.1.1 first hearth cloth Wind board laying 200mm thickness of the bed material; About Revert cloth laying Wind board thickness 200mm bed material, to prevent Ogive burn plug secondary air pipe; 5.1.2 prior to Add a small amount of flammable wood furnace and left and right back Feeder, ignition Wind Road in oven two days before ignition; 5.1.3 ignition started Ovens need to use a small amount of diesel added to the accumulation of wood, wood ignition when combustible, wood drying to around 200 ° C, according to adjust primer wind baffle and then curves of thermal insulation and heating.

5.1烘炉顺序 5.1.1先将炉床布风板上铺设厚度为200mm的床料;左右返料器布风板上铺设厚度200mm床料,防止把风帽烧坏,堵塞二次风管; 5.1.2事先将少量易燃木柴放入炉膛和左、右返料器,点火风道应在烘炉前2天进行点火; 5.1.3开始烘炉点火时需要用少量的柴油加在堆积的木柴上,点火时木柴易燃烧,木柴烘至200℃左右后,根据情况调节引风挡板,再按升温曲线保温、升温。

Edge communications companies seamless steel pipe production line length of 400 meters, 100 meters wide by more than 300 sets of ancillary equipment, of which there is tube grinding, sawing equipment, tube furnace, piercing machine, rolling machine, stepper heating furnace, micro-stretch reducing mill, cooling bed, straightening machine, pipe cutting machine, testing machines, finishing equipment.

力通联公司无缝钢管生产线全长400米,宽100米,由300多套附属设备组成,其中有管坯修磨、锯切设备、管坯加热炉、穿孔机、轧管机、步进式加热炉、微张力减径机、冷床、矫直机、切管机、探伤机、精整设备等。

The test shows that the bed temperature is gradually reduced along the height of furnace in case of lower volatile matter content in the coal sort,but the temperature of returned material is obviously en- hanced;the bed temperature is entirely increased in the event of increasing the load,but the temperature difference be...

试验表明,煤挥发分含量较低时,床温沿炉膛高度逐渐降低,但返料温度明显升高;负荷提高,床温整体升高,但炉膛底部与中部的温差减小;一次风量增加,会导致烟气从密相区带走的热量大于燃烧放热而使床温降低。

A new desulfurization apprach for pulverized coal combustion is introduced in this paper; pulverized coal is first burn in a precombustion furnace under oxygen deficient condition (about 30% air needed in boiler is provided for precombustion), in precombustion moust of sulfur in coal is decomposed and oxidized, and evolved, the sulfur evolved is trapped in a desulfurizing fluidized bed by calsuim, and then the char and gas are introduced to the boiler furnace for complete combustion.

本文提出了一种煤粉燃烧脱硫新方案,利用煤中硫优先氧化分解释出的原理,用少量的空气(大略为锅炉实际空气用量的30%),在一前置燃烧室中,使煤粉中硫的绝大部分被分解氧化,释放出来,释放出来的硫在脱硫流化床中被石灰脱硫剂脱除,未燃烧的炭粒与烟气再吹进锅炉膛中完全燃烧。

Boilers operating wjth both forced and ind.uced draft use the forced draft fan to push air through the combustion air supply system into'the.furnace,The fan must have a discharge pressure high enough to equal the total resistance of air ducts,air heater, burners or fuel bed and any other resistance between the fan discharge and the furnace.

锅炉的运行是使用强制通风风机将空气通过空气燃烧供应系统供入炉内。风机必须有足够高的排气压力来平衡输气管、空气加热器、炉膛或燃料箱及输气管到锅炉之间所产生的全部阻力。

The main producing all kinds of heaters, electric heaters, electric equipment, electric heating devices, ALUMINIUM Copper heater, pipeline, electrical heating pipe, buried in ceramic tile, heating, ceramic electric heater, electric heating Mica stainless steel ring, SiC far-infrared heating panels, vacuum cleaning stoves, TEG cleaning furnace, aluminium oxide fluidized bed, conducting oil furnace, Organic Heat Carrier stoves, electric oven, preheat furnace components, air circulation box - Hot stove, oven insulation, Dianre Dai, finish the deployment of chutes, such as tanks.

主要生产各种加热器、电加热器、电热设备、电加热装置、铸铝铸铜加热器、流水线、电加热管、埋入式陶瓷电加热瓦、陶瓷电加热器、不锈钢云母电加热圈、碳化硅远红外电加热板、真空清洗炉、三甘醇清洗炉、三氧化二铝流化床、导热油炉、有机热载体炉、电加热炉、组件预热炉、热风循环箱式预热炉、保温烘箱、电热带、油剂调配槽、储罐等。

The high-sulfur bauxite was pretreated in muffle furnace, rotary tube furnace and fluidized bed.

摘 要:采用马弗炉、旋转管式炉和流化床对我国高硫铝土矿进行焙烧预处理。

第1/3页 1 2 3 > 尾页
推荐网络例句

It is also known as one of the most poisonous naturally occurring substances.

它也被称为一个最自然发生的有毒物质。

The greatest stress is found at the location on the cross section where V is the largest.

最大应力出现在横截面上V为最大的地方。

It is the most important three water problem which our country faces in the 21st century that flood and waterlog, drought and shortage of water, the deterioration of water environment.

洪涝灾害、干旱缺水、水环境恶化是二十一世纪我国面临的三大水问题。