查询词典 evaluation test
- 与 evaluation test 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
According to hydrogen pressure vessel and non-heat pressure vessel of power supply corporation in chongqing electric net as research object , applying exoterica analyse and physical chemistry test to hydrogen pressure vessel and non-heat pressure vessel and carrying through the safety performance evaluation and analyse and research of test .
以重庆电网内发供电企业内装置的氢气压力容器及非热力压力容器为研究对象,应用理论分析和物理化学试验相结合的方法,对氢气压力容器及非热力压力容器进行安全性能评估和检验的分析和研究。
-
The compose of system of evaluation of education of quality of student of major of omnibus school normal school builds the place with carry out include to evaluate content of systematic target, establish test, organization test to carry out certainly wait for link.
地方综合性院校师范专业学生素质教育评价体系的构建和实施包括确定评价体系目标、确立考评内容、组织考评实施等环节。
-
In classroom teaching evaluation, we should pay more attention to the students status. In reference to the practice of Chinese language teaching and teaching assessment theories in Wushen Banner, I posed the evaluation ways for new curriculum in Wushen Banner, a remote national minority area. And I made a lot of experiments.
最后结合乌审旗语文教学实际和有关评价理论,在对乌审旗初中语文教学评价现状进行调查分析的基础上,提出了像乌审旗这样偏远的少数民族地区应对新课程改革的评价对策并进行了实验。
-
In order to overcome these deficiencies, after analyzed characters ofseveral popular functions in image Sharpness evaluation, a new image sharpness evaluation model was presented which is based on the image absolute central moment.
该模型通过引入图像中心距和高通滤波图像中心距的线性组合,在保持评价结果良好全局性的同时提高了其局部量化精度。
-
The full text takes strategic performance evaluation principle as center, elaborating Balanced Scorecard to account the card of the cent with the fusion of the public section performance evaluation.
全文以战略性的绩效评估理念为中心,阐述了平衡计分卡与公共部门绩效评估的融合性。
-
In order to improve the objectivity of green degree evaluation for manufacturing process of accouterment part,base on the characteristic of the green manufactureing of accouterment part and the request of evaluation for green manufacture a rough comprehensive method base on rough-set theory is proposed to evaluate the green degree.
为提高产品零件制造工艺绿色度评价的客观性,根据军品零件绿色制造的特点和绿色制造评价的要求,应用粗糙集原理,提出了粗糙集综合绿色度评价法。
-
In this model, injury indexes were quantified and classified scientifically and reasonably, and then the injury and injury degree were evaluated by multiplayer fuzzy synthetic evaluation, so that higher scientific evaluation of injury and injury degree and more transparent and fair adjudge to anti dumping injury research were obtained.
对反倾销调查过程中的一系列损害指标进行量化,并合理地对指标进行分类,用多层模糊综合评判方法判定损害及损害程度。这样使损害及损害程度的认定更加具有科学性,也使反倾销损害调查的裁决更加具有公正性和透明度。
-
According to evaluation of the thermal, hydraulic, environmental and mechanic characteristics and energy performance of building and VAV air-conditioning system, and evaluation of the control performance of local control loops using the simulator of VAV system, this paper presents five on-line supervisory control strategies for local control loops: on-line optimization of VAV supply air static pressure set-point, on-line optimization of AHU supply air temperature set-point, on-line optimization of on/off set of CAV sub-system, on-line optimization of outdoor air set-point and on-line optimization of chilled water secondary pump pressure set-point.
通过数字仿真器对建筑物及其变风量空调系统的热力、动力、环境和能耗等运行特性的模拟,以及对系统常规采用的下位机控制回路可控性和稳定性等控制特性的研究和分析,本文先从局部的角度开展了系统局部优化的研究。提出并在仿真器上分别实施了VAV送风静压设定的实时优化,AHU送风温度设定的实时优化,CAV子系统开/停的实时优化,新风量设定的实时优化以及二级泵冷媒水供水压差设定的实时优化。
-
It also designs the AHP and fuzzy overall evaluation methods to the risk evaluation system of PPP item and analyses the allocation of risks with model of mathematics from the unitary and optimize angle.
最后,本文理论联系实际,对我国运用PPP的典型工程实例——北京地铁四号线项目的风险进行了实证分析,得出北京地铁四号线引入PPP模式其意义不仅在四号线本身,它将成为我国基础设施建设融资模式的一个新样本。
-
The post-evaluation of highway construction project goal sustainability is analytic evaluation made after the completion and a period of operation of the project , through analyzing and evaluating for condition of exterior (development of social and economy, management of system and code , condition of highway net , construction of corresponding establishment ) and interiority (system of function , interior management and circumstances of service , charge for highway and the condition of operation), to judge the project of highway operate smoothly or not , and the project have the ability to achieve the target of safety , expeditor , shortcut , higher benefit and lower cost persistently or not .
公路建设项目目标持续性后评价是指公路建设项目在建成通车后一段时间,通过对外部条件(社会经济发展、管理体制与法规、公路网状况、配套设施建设)和内部条件(运行机制、内部管理与服务情况、公路收费及运营状况)等的分析评价,来判断此公路建设项目是否能顺利的持续运营下去,并且和有能力持续实现它安全、通畅、快捷、高效益和低成本这一目标。
- 相关中文对照歌词
- Test Of Time
- Put It To The Test
- Across The Nation
- Across The Nation
- Piss Test (Interlude)
- Test Drive
- Truth
- The Evaluation
- Test Drive
- I Cram To Understand
- 推荐网络例句
-
After explaining total design of automated test system for microcircuit , the thesis introduces GPIB standard .
文章在说明了微电路模块自动测试系统的总体设计后,对GPIB标准进行了介绍。
-
He interceded in my behalf.
他替我说情。
-
The greatest quality of axle load: vehicle carrying the largest single-axis by the total mass.
最大轴载质量:汽车单轴所承载的最大总质量。