英语人>网络例句>drainage 相关的网络例句
drainage相关的网络例句

查询词典 drainage

与 drainage 相关的网络例句 [注:此内容来源于网络,仅供参考]

cerebral hemorrhage of 46 ventricle grave (be more than 20ml) patient to divide two groups into A, B randomly, a group 22, use microscopical technical ossicle window opens haematoma of skull grave head cleared art + group of;B of art of the drainage outside ventricle 24, in art of drainage of puncture of haematoma of head of grave of be issued to lower levels of CT fixed position + art of the drainage outside ventricle.

方法46例脑室型丘脑出血(大于20ml)患者随机分成A、B两组,A组22例,采用显微技术小骨窗开颅丘脑血肿清除术+脑室外引流术;B组24例,在CT定位下行丘脑血肿穿刺引流术+脑室外引流术。

After analyzing the CMT drainage mass under different initial condition, the primary result has been concluded: The CMT drainage velocity is related to the change of CMT pressure, the drainage mass of CMT without sparger increase monotonously along with time, and has a obvious inflexion.

遮流板对减小凝结起着积极的作用,在蒸汽完全凝结和部分蒸汽快速凝结阶段下CMT加遮流板其凝结换热系数较无遮流板时减小了3—5倍。

Methods autohemic blood from femoral artery of dogs was taken and injected to one side pleural cavity with the same volume of normal saline and air to establish a model of hemopneurothorax on dogs .then 24 the dogs were divided into experimental group and control group at random with 12 dogs in each group. to observe and analyze the time of chest tube insertion,the intensity of resistance to pulling and drainage effect between the thoracentesis technique of invented minute invasion closed-chest drainage and traditional closed-chest drainage.

利用家犬自体股动脉穿刺采血注入一侧胸腔、同时注入等量盐水及空气的方法建立家犬血气胸模型,并将其随机分成实验组(n=12)和对照组(n=12),观察分析自制微创胸腔闭式引流装置与传统胸腔闭式引流装置的置管时间、抗拉强度、引流效果等。

Connected with cross section patterns of freeway, the design method of drainable base course system and edge drainage system which meet to request are given too. The aggregate grading and mixture ratio of porous cement-treated macadam are obtained based on accurate survey on material properties and lots of laboratory experiments. After the construction of experiment road, a summary of mixing, spreading, roller compaction and maintenance process about subsurface drainage system is made, and the analysis on the cost of construction about drainable base course is also carried. According to the test of coefficient of permeability, porosity and strength of compression about local test samples and core samples, the paper concludes that main performance index of subsurface drainage system has achieved the design anticipated effect.

结合高速公路横断面型式,提出了适合要求的排水基层排水系统和边缘排水系统设计方案;在进行详细材料调查和大量室内试验的基础上,提出了多孔隙水泥稳定碎石基层的集料级配和混合料配合比;修建了路面内部排水系统试验路,根据试验路工程的施工情况,对路面内部排水系统施工的拌和、摊铺、碾压和养护工艺进行了总结;并对排水基层造价进行了分析;通过对现场取样试件、芯样的渗透系数、孔隙率和抗压强度的测试,证明路面内部排水系统的主要性能指标均达到了设计预期的效果。

Results:There were no abdominal pain and fever,jaundice faded away gradually postoperation.Biliary drainage was 300ml-1000ml/d more or less.Colour of bile changed into normal by degrees.Intra peritoneal drainage was open and the colour was light bloody.Amount of drainage dropped off day after day.Whole blood cell test, serum glutamic pyruvic transaminase,serum glutamic oxalacetic transarninase,total serum protein,serum albumin and serum globulin returned to normal in first week postoperation.Serum bilirubin,serum glutamyltranspetidase and serum alkaline phosphatase declined gradually in first week postoperation.T-tube was clipped at twelfth day postoperation.T-tube Cholangiography was clear at 24~ day postoperation.

结果:术后无上腹部绞痛、高热,黄疸逐渐减退,每日引流胆汁300ml-1000ml不等,由淡黄色混浊、内有胆泥过渡到金黄色清亮的正常胆汁,腹腔引流通畅,引流液为淡红色,量从最初的200ml迅速过渡到10ml,血常规、血清谷丙转氨酶、谷草转氨酶、总蛋白、白蛋白、球蛋白等1周内均恢复正常,血清总胆红素、直接胆红素、间接胆红素、谷氨酰转肽酶、碱性磷酸酶逐渐下降,术后12d夹闭T管,术后24d T管造影提示左、右肝管及胆总管下端通畅,无狭窄。

Through analyzing main factors on the parameter of drainage networks expanse, this thesis ascertains a new parameter form ofdrainage networks expense and regressively analyses each parameter of drainage networks expanse by statistical software SPSS, approving that the new drainage networks expanse is a better parameter compared with other parameters of drainpipe net expense.

本文通过对排水管网费用函数各主要影响因素的分析,推求出新的排水管网费用函数形式,并利用SPSS统计软件对各个排水管网费用函数进行了回归分析,证实新的排水管网费用函数与其它排水管网费用函数相比较为较优函数。

Under the demand of wrecking-drainage system in different gradient deep mines, a mathematics model for analyzing the hydraulic transient of the sideling large-scale submersible motor pump drainage system is established, and the hydraulic transient of six different angles of the drainage system caused by power failure are calculated.

针对不同倾斜角度深部矿井中抢险排水的要求,建立了斜置大型潜水电泵排水系统水力过渡过程分析的数学模型,计算了6种不同矿井倾角排水系统的事故停机水力过渡过程。

To observe and analyze the time of chest tube insertion,the intensity of resistance to pulling and drainage effect between the thoracentesis technique of invented minute invasion closed-chest drainage and traditional closed-chest drainage.

利用家犬自体股动脉穿刺采血注入一侧胸腔、同时注入等量盐水及空气的方法建立家犬血气胸模型,并将其随机分成实验组(n=12)和对照组(n=12),观察分析自制微创胸腔闭式引流装置与传统胸腔闭式引流装置的置管时间、抗拉强度、引流效果等。

It discusses the daily drainage design from system,tube materials,appendix,venthole, tube layout and pavement as well as rain-water drainage,and analyzes problems which should be noticed during drainage design,so as to improve the general designing level of ours.

对日常的排水设计从系统、管材及附件、通气管、管道布置及敷设和屋面雨水的排出等方面进行了论述,并分析了设计中应注意的问题,以完善和提高整体设计水平。

Waste water drainage system of Longhu Street, total length is 3.7km, drainage cross section is 2.5×3m spear plate culvert,(4) presently, capable of connecting with city drainage system 1.5km across 108 National Road to planned sewage treatment plant, it is a 3×5m drainage canal.

龙湖街污水排水系统,全长3.7公里,排水断面2.5 X 3M的盖板涵。⑷穿越108国道至规划的污水处理厂目前可接入城市排水系统1.5公里,为3 X 5M的排水明渠。

第3/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Next time I see you,I shall give you a black eye.

下次我看见你,我会打你一顿。

In this paper,design scheme of classification system of wood surface color is established.

提出了木质板材颜色分类的系统设计方案。

With a few exceptions (a sea-monster attack seems to go on forever), this is where the film outdoes its predecessor.

不出什么意外(似乎永远都有海怪的攻击),这可能是这部片优于前作的地方了。