英语人>网络例句>computation errors 相关的网络例句
computation errors相关的网络例句

查询词典 computation errors

与 computation errors 相关的网络例句 [注:此内容来源于网络,仅供参考]

After carries on the load computation and the component section estimate, selected a pin frame to carry on the computation, the computation content including the frame beam column section size selection and the line rigidity computation; Dead load, live load, under earthquake function Liang Duan, column end moment, shearing force computation; Frame endogenic force combination; The frame beam column matches the muscle computation; The staircase matches the muscle computation and the foundation matches the muscle computation.

在进行荷载计算和构件截面估算后,选取了一榀框架进行计算,计算内容包括框架梁柱截面尺寸的选取及线刚度的计算;恒载、活载、地震作用下梁端、柱端弯矩、剪力的计算;框架内力组合;框架梁柱配筋计算;楼梯配筋计算及基础配筋计算。

Studied present measuring methods" advantages and disadvantages, and presented the necessity and importance of researching propellant transient heat transfer.2.according to 130 and aeronautic 90 rocket projectiles" structure, analysed and acquired physical and mathematical models for propellant transient heat transfer, also designed propellant temperature field simulation units for test.3.acquired discrete transient heat balance equation and temperature calculation program, and gave contrasting curves between experimental temperature values and program calculating temperature values as well as maximum errors and average square root errors between them.4.by programs based on the first class boundary condition, worked out temperature distribution in propellant temperature field simulation units at different time, analysed temperature field distribution law and main elements affecting heat transfer, acquired propellant mass weighted average temperature and one at the half position of propellant maximum thickness as well as maximum errors and average square root errors between them.5.established transient heat transfer mathematical model and temperature calculation program for the third class boundary condition, drew contrasting curves between temperature experimental values and calculation values and gave maximum errors and average square root errors between them, got temperature distribution in the simulation unit at different time and main elements affecting heat conduction, figured out propellant mass weighted average temperature and one at the half position of propellant maximum thickness as well as maximum errors and average square root errors between them.

分析了现有测试方法的优缺点,提出了研究推进剂瞬态导热的必要性和重要性。 2。根据130和航90两种火箭弹的结构,分析得到了推进剂传热的物理模型和数学模型,设计了推进剂温度场模拟实验装置。 3。得到了离散形式的瞬态热平衡方程和温度场计算程序,给出了实验温度与程序计算温度值的对比曲线及其最大偏差与均方差。 4。利用程序求出了第一类边界条件下、不同时刻推进剂温度场模拟装置中的温度分布,分析了温度场的分布规律和影响传热的主要因素,求出了推进剂质量加权平均温度和最大肉厚1/2处的温度时间曲线并给出了两者之间的最大偏差与均方差。 5。建立了第三类边界条件下的瞬态导热数学模型和温度计算程序,求出了温度实测值与计算值的对比曲线并给出了两者之间的最大偏差与均方差,得到了不同时刻温度场模拟装置的温度分布与影响导热的主要因素,求出了推进剂质量加权平均温度和最大肉厚1/2处温度及两者之间的最大偏差与均方差,讨论并确定了能代表130和航90推进剂温度的特征点的位置。

First introduced highway alignment's definition, the significance, the developing process and the CASIO series calculator in the highway surveying computation application; Using the traverse survey computation's two basic mathematical model (azimuth calculation, coordinate calculation), compile the corresponding procedure to solve echo the wire coordinate computation; With the aid in the mathematical model which three, four and so on leveling's field operations calculate, compiles the corresponding procedure to solve the road elevation survey computation; According to relaxes the circular curve principal point and the detail coordinate computation mathematical model, based on this programs the solution to relax the circular curve coordinate principal point and the detail coordinate computation, then further develops this procedure to use to calculate the circular curve principal point and the detail coordinate computation.

首先介绍了公路线路的定义、意义、发展过程和CASIO 系列计算器在公路测量计算的应用;利用导线测量计算的两种基本数学模型,编写相应的程序以解决附和导线坐标计算;借助于三、四等水准测量的外业计算的数学模型,编写相应的程序以解决公路高程测量的计算;根据缓和圆曲线主点及细部点的坐标计算的数学模型,在此基础上编程解决缓和圆曲线坐标主点及细部点坐标的计算,然后进一步开发此程序用以计算圆曲线主点及细部点的坐标计算。

Each group contains a detailed classification of different standpoints. Part 4 makes a careful study and analysis of the causes of errors and induces the causes of errors into interlingual errors,intralingual errors,limitation of basic language knowledge and writing skills and ignorance of commenting on composition and correcting errors. Part 5 draws a conclusion and sets forth some error corrections and teaching methods to reduce errors. Part 6 sets forth the authors suggestions and some problems to discuss.

并根据具体实例将不同错误类型进行了更为详细的分类及分析;第四部分分析写作错误的原因,将导致写作错误的原因归纳为语际因素,语内因素,学习者语言知识和写作技巧的限制及忽视作文评改;第五部分归纳和总结全文,通过归纳前述内容提出减少错误的教学对策和纠正错误的方法;第六部分提出本人的建议和进一步需要探讨的问题。

The main contents are as follows: the basic knowledge of reinforcement and concrete; the principle of ferroconcrete in structural design and computation; the computation of bearing capacity in the normal and oblique section of flexural member; the computation method of member in torsion, tension and compression; the computation of distortion and crack width in members of the ferroconcrete in the design principle, stress analysis and the computation of the bearing capacity in the pre-stressed concrete structure and give an outline of the tier building and multistoried building.

主要内容有:钢筋和混凝土材料的基本知识;钢筋混凝土机构设计计算原理、设计方法;受弯构件正截面、斜截面承载力计算;受弯受扭受拉构件的承载力计算方法;钢筋混凝土构件的变形和裂缝宽度计算;预应力混凝土结构设计原理、应力分析及承载力计算;并简要介绍多层及高层建筑物结构。

This thesis combined the riverbed section and plane form, from the two side of hydraulic computation and model test, put forward the method to realized the automatic computation for river closure gap hydraulic parameters and comparison and verification. And through carrying on the secondary development to AutoCAD, realized the common software of automation drawing the topographical section of model test. Based on hydraulics computation technology, finished developing the common application software for one berm-dam vertical closure hydraulic computation.

本文结合河床断面与平面形状,从水力计算与模型试验两个角度出发,提出了实现龙口水力参数计算自动化并进行验证比较的方法;并且通过对AutoCAD进行二次开发,实现了模型试验地形断面绘制自动化的通用软件;同时以水力学计算方法为基础,完成了隧洞导流条件下单戗堤立堵截流水力计算通用应用软件的开发。

The structural design is carries on the design calculation after the plan comparison and appraisal recommendation plan, this stage design primary mission is: The design material analysis and the structure arrangement, the king post endogenic force computation, the pre-stressed steel ties the estimate and the arrangement, the computation king post section geometry characteristic, the steel tie the loss of prestress computation, the king post section intensity checking calculation, the king post nose partial bearing strength checking calculation, the king post distortion checking calculation and part compositions and so on lane board computation.

结构设计是根据方案评比后的推荐方案进行设计计算,这一阶段的设计主要任务是:设计资料分析及构造布置、主梁内力计算、预应力钢束的估算及其布置、计算主梁截面几何特性、钢束预应力损失计算、主梁截面强度验算、主梁端部的局部承压强度验算、主梁变形验算和行车道板计算等部分组成。

The boundary condition of small scope is provided by the computation result of large scope, and the computation is also stable after two periods. The computation of temperature field begins and it is stable after six periods. The computation is conducted at three different tide levels, including spring tide, still tide and neap tide.

大范围的流场计算在两个周期后达到稳定,开始计算小范围的流场,小范围的边界条件由大范围计算结果提供,小范围的流场在计算后两个周期后达到稳定,开始计算小范围的温度场,温度场的计算在六个周期后达到稳定。

The boundary condition of small scope is provided by the computation result of large scope, and the computation is also stable after two periods. The computation of temperature field begins and it is stable after six periods. The computation is conducted at three different tide levels, including spring tide, still tideand neap tide.

大范围的流场计算在两个周期后达到稳定,开始计算小范围的流场,小范围的边界条件由大范围计算结果提供,小范围的流场在计算后两个周期后达到稳定,开始计算小范围的温度场,温度场的计算在六个周期后达到稳定。

In this design introduced the transmission covers the punch holes the ramming craft analysis, the craft plan formulation, arranges the specimen map design, the always ramming strength computation and the center of pressure computation, the cutting edge size computation, the spring, the rubber computation and selects, the raised mold, the concave mold or the convex-concave mold structural design and all that die the components structural design, draws up the mold assembly drawing and the work detail drawing, the compilation design instruction booklet, fills in the ramming craft card and the work components machine-finishing technological process card, raised pays attention to, the concave mold coordinate processing.

本设计中介绍了传动盖冲孔的冲压工艺分析,工艺方案的分析和制定,排样图的设计,总的冲压力计算及压力中心的计算,刃口尺寸的计算,弹簧的计算和选用,凸模、凹模或凸凹模结构设计以及其他冲模零件的结构设计,绘制模具装配图和工作零件图,编写设计说明书,填写冲压工艺卡和工作零件机械加工工艺过程卡,注意凸、凹模的配合加工。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Hymn For The Dead
Inside Out
Doubt
History
Goliaths Disarm Their Davids
Know How
Can't Have It All At Once
I Love My Computer
Conquer All
Holocaust
推荐网络例句

A backer of an Afghan law that critics say legalizes marital rape has rejected the international outcry as foreign meddling.

饱受批评的一项法律的拥护者说合法化的婚内暴力不会受国际舆论的干涉。

Years ago, a ancient Egyptian fleet went to the Land of punt for seeking a kind of flavor named "myrrh", and aromatic plants which has dense exotic style for the queen Hatshepsut.

3500年前的一个古埃及的舰队到&彭特之地&寻找一种叫没药的香料。

I didn't tell him anything except that I needed the money.

我什么都没告诉他,只是说我需要钱。