英语人>网络例句>completion test 相关的网络例句
completion test相关的网络例句

查询词典 completion test

与 completion test 相关的网络例句 [注:此内容来源于网络,仅供参考]

Signalmen who have worked for more than one year and 70 new telegraph operators are subjected to Pattern Number Coding Ability Test, Ravens Progress Matrices, Memory Span Test, Distribution of Attention Test, Knocking Board Test, Choice Reaction Time Test, Action Speed Test, Action Stability Test, 16PF Test, Cornell Medical Index, SAS and SDS. hi the meanwhile their supervisors appraise the performance levels based on five grades from 5,4,3,2 and I .

研究对象为某军区工作1年以上的通信专业技术人员469名,另有作为预测效度检验的报训队新兵70名,分别接受图形数字编码能力测验、瑞文标准推理测验、记忆广度测验、注意分配测验、敲击板测验、选择反应时测验、动作速度测验、动作稳定性测验、卡特尔16PF测验、康奈尔测验、抑郁自评量表测验、焦虑自评量表测验;同时进行专业水平评价。

Donor sends out donation à Wait for schools which have been approved for construction à EEP assigns school to donor on a first-come-first-serve basis à EEP sends out school application and brief description of school condition to donor à Approved school begins construction – on average, six months is needed to finish construction. However, if circumstances are not ideal (e.g., inclement weather, bad road conditions and etc) or if the school is located in a very remote area (workers need to carry building materials up the mountain) then a longer time is necessary à Construction completed à Spring and Fall season, EEP volunteers inspect completed schools and take pictures for completion reports à Upon return to the US, prepare pictures and completion reports for donors (Approximately 2-3 months time)à Send out school completion reports to donors

捐款人寄出捐款后→等待申请审核通过的学校→燃灯基金会依捐款人捐款时间的先后,安排审核通过的学校给捐款人→燃灯基金会寄出申请学校的旧校资料,及学校现况照片给捐款人→受助学校动工至学校竣工一般需要六个月,若遇雨季或路断或比较偏远的山区(所有建材需由人工扛上山)则会更久时间→学校竣工后→春、秋两季燃灯基金会义工亲自前往验收并拍照→义工返美国后,整理完工学校照片及竣工资料给捐款人(大约二~三个月整理时间)→寄给捐款人竣工报告书。

According to theory analysis and example computation, the following conclusions are obtained.1. During the analysis on the cable shape in the suspension bridge"s completion state, the pre-displacement of saddle and the case that the cable and stiff girder commonly bear the second-stage dead load should be considered.2. When supposing the construction ideal initial state in the first time, if the initial state model is established according the cable"s span central sag in the bridge"s completion state, and the reasonable correction formulation is created in the iteration process, the result can converges fast.3. The cable shape in the bridge"s completion state is not parabolic, nor catenary. It is between parabola and catenary. Actually it is funicular polygon closer to the catenary.

通过理论分析和实例的计算表明:1在悬索桥主缆成桥线形分析过程中,须考虑主塔鞍座的偏位以及二期恒载由主缆和加劲梁共同承担的实际情况;2在第一次假设施工理想初态时,以成桥状态已知的主缆跨中垂度建立施工理想初态模型,同时在迭代计算的过程中,建立合理的修正公式,才能使收敛的速度快:3在成桥状态时主缆的线形既不是抛物线,也不是悬链线,而是介于抛物线与悬链线之间,更接近于悬链线的索多边形。

Not every partial positive definite Toeplitz matrix has Toeplitz positive definite completion and not every par2 tial positive definite matrix which has positive definite completion has Toeplitz positive definite completion.

并不是所有的部分正定Toeplitz 矩阵都有Toeplitz 正定完成,也并不是每个有正定完成的部分正定矩阵都有 Toeplitz 正定完成。

First design a reasonable XML Schema structure and under the restriction of XML Schema use XML to describe the UML class diagram and the related specification, and then extract the test specification of method from XML test script. Test specification refers to predicate sequences in the form of conjunctive normal form, extracted from basic constraint conditions of variables included in test scripts and expected outputs. Each conjunctive normal form can be transformed to an inequation set, and adopt 1×1 domain test strategy to every inequation set to produce the domain test matrix, which in turn produce the test case.

首先设计合理的XML Schema结构,并在该XML Schema的有效性约束下,用XML对UML类图及相关性约束进行脚本描述;其次对XML测试脚本进行分析,提取方法的测试规约说明,所谓测试规约说明就是从测试脚本中包含的变量的基本约束条件以及期望输出中抽取得到的以合取范式形式存在的谓词序列;每一合取范式对应一个不等式组,对每一个不等式组采用1×1域测试策略,生成域测试矩阵,最终得到测试用例。

Cell culture cytotoxic test, skin allergy test, intracutaneous stimulation test, primary skin stimulation test, hemolysis test , general acute toxicity test and pyrogenicity test were performed according to the manual of the national standards of medical materials.

方法带瓣牛颈静脉经单宁酸处理后按国家医用材料的要求进行浸提液的制备、细胞毒性试验、过敏试验、皮内刺激试验、原发性皮肤刺激试验、溶血试验、急性全身毒性试验及热原试验等生物学评价试验。

The biocompatibility of poly(3-hydroxybutyrate-co-hydroxyocatanoate), a new biodegradable co-polymer scaffold, was evaluated with a series of tests, including cytotoxicity test, acute systemic toxicity test, hemolysis test, pyrogen test, genetic toxicity test, intracutaneous stimulation test and subcutaneous implantation test.

文章选用细胞毒性实验、急性全身毒性实验、溶血实验、热源实验、皮内刺激实验、遗传毒性实验和皮下植入实验等7个生物相容性实验对生物可降解支架材料羟基丁酸与羟基辛酸共聚体的生物相容性进行评价。

Methods Total of 164 patients with first-episode schizophrenia were evaluated before treatment, at the end of 12 weeks treatment and then annually till 5 years on 10 cognitive function tests, including Weschler adult intelligence scale, Weschler memory scale, grooved pegboard test, finger tapping test, motor function test, hand coordination test, trail making test A and B, Wisconsin card sort test, and verbal fluency test, together with BPRS, SANS and GAF. Results The scores on all cognitive function tests were not significantly related to total scores of BPRS, SANS and GAF before treatment.

对164例首发精神分裂症患者进行随访观察,于治疗前、治疗12周末、治疗1年末、2年末、3年末、4年末、5年末各做1次韦氏成人智力量表、韦氏记忆量表、铁槽铁钉测验、手指敲击试验、动作功能测验、手功能协调测验、连线测验A和B、威斯康星卡片分类测验及言语流利性测验等10项神经心理测查及简明精神症状评定量表、阴性症状评定量表、功能总体评定量表评定。

Some methods aiming at the two problems have been researched. First, the optimal number of ATE site can be calculated based on a cost model of DAT-ATE. Second, the problem of test schedule which is equitant with two-dimensional Bin-Packing problem is presented. Then a TCG denotation satisfied with T-admissible rule is more convenient for combinational optimization. With Simulated annealing algorithm, better test scheduling results can be achieved; but there is no great optimization space because the efficiency of scheduling is greater than 90%. Third, A novel test compression method——Multi-capture testing is proposed to compress the stimuli. And the ATPG results show that MC achieves high compression ratio which is greater than 90% in some large-scale circuits. MISR, widely used in LBIST, is employed to compress the responses. The aliasing analysis demonstrates that the fault coverage reduction is little due to the existence of aliasing. Fourth, an improved TIC (called S-TIC) aiming at structured test is proposed based on ARM's TIC. A MC scheduling algorithm is proposed to compute the SoC test time and combine MC vectors to SoC test vectors. The scheduling results shows that test time is greatly reduced when using the proper scheduling priority.

首先,给出了低成本ATE的成本模型,根据此模型得到最低测试成本时系统级测试调度的基本参数——测试Site数;其次,本文将DAT-Scan方式的SoC测试调度等价为两维BP问题,为有效地求解该问题,将该BP问题表示为TCG图并通过模拟退火算法解决其求解过于复杂的问题,调度的结果表明该方法在测试时间上有一定改善,并指出DAT-Scan测试调度效率已经大于90%,进一步优化的空间较小;第三,本文尝试通过测试压缩来解决激励所需的测试带宽,提出了Multi-capture结构并解决了MC测试过程中的&矢量&退化问题,MC测试的ATPG结果表明其测试压缩率很高(大电路接近90%);第四,在激励获得很高压缩比的情况下,测试响应也需压缩,本文采用LBIST中常用的MISR作为MC测试的响应压缩电路,理论分析和实验结果都证明了MC测试的别名对故障覆盖率影响较小(小于2%),并对两类别名的成因做了具体分析;第五,在MC测试及其响应压缩的基础上,本文改进了ARM公司的测试控制器TIC使之适合于MC测试,为了解决MC测试矢量合成问题,本文抽取了MC测试模型,通过固定优先级的MC测试调度模拟将MC矢量合成为ATE矢量,并模拟出了总的MC测试时间。

4 Results of nondestructive test for weld joints shall be graded according to JB 4730. Following requirements shall be met: a For radial test, quality grade of radial transillumination can't be lower than Grade AB, and that of weld joints shall meet table 10; b For supersonic test, approval standard for weld joints are as follows: 1 For weld joints of 100% supersonic test, grade Ⅰ. 2 For weld joints of local supersonic test, grade Ⅱ. c For magnetic particle test and penetration test, grade Ⅰ.

7.5.4 管道焊接接头的无损检测应按 JB 4730 进行焊缝缺陷等级评定,并符合下列要求: a 射线检测时,射线透照质量等级不得低于 AB 级,焊接接头经射线检测后的合格等级应符合表 10 的规定; b 超声波检测时,管道焊接接头经检测后的合格标准如下: 1 规定进行 100%超声波检测的焊接接头 I 级合格; 2 局部进行超声波检测的焊接接头 II 级合格; c 磁粉检测和渗透检测的焊接接头 I 级合格。

第3/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Test Of Time
Put It To The Test
Across The Nation
Across The Nation
Piss Test (Interlude)
Test Drive
Truth
Test Drive
I Cram To Understand
I Cram To Understand U
推荐网络例句

"The operators will suffer a temporary decrease in the number of consumers and short message services as people may not like having to provide their ID cards for a phone number," Xu Junqi, vice-dean with the Policy-Making Institute of the Telecommunications Research Centre under MII, said yesterday.

信息产业部下属的通信决策研究院副主任徐俊其昨天说:&实行手机实名制后,人们可能不太情愿用身份证注册手机号,所以通信运营商会暂时面临用户减少和短信用户减少的问题。&

I don't believe in make-believe!

我不相信这些虚构的故事。

The edible root of the beet .Fodder preserved in a silo; silage.

贮窖的饲料贮藏在贮窖中的饲料;青贮作物