查询词典 buttress root
- 与 buttress root 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Based on engineering practice,the paper introduces in detail the construction technique of abutment on pier top and temporary buttress,the construction technique at 0 section,the construction technology of casting concrete for cantilever and cast-in-situ concrete section for side span and the construction technology at closure section ,sums up the key construction technique of conti.
结合该工程实际,对墩顶支座及临时支墩施工技术、0号段施工技术、悬臂浇筑及边跨现浇段施工工艺、合龙段施工工艺等进行了详细的介绍,总结了大桥连续刚构关键施工技术,实践证明这些施工工艺和控制技术是可行的,为以后类似工程提供了借鉴。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Jane covered with tile-ridge, with Qian Yan Gallery, Yan Zhu 4, 7 brackets, known as the "hidden carved brackets", was recorded on the early history of the "arch buttress" the example of the kind, Taiyuan only one example of this.
覆以简瓦素脊,前檐带廊,檐柱四根,斗拱七朵,俗称&隐刻斗拱&,是早期史籍上记载的&扶壁拱&的实物例证,太原仅此一例。
-
1 Condenser on evaporative cooling hydro-generator (generator/motor) shall be collocated evenly on buttress pier of upper bracket or on concrete wall in generator turbine pit.
1 蒸发冷却水轮发电机的冷凝器尽量均匀的布置在上机架的支墩上或布置在发电机机坑内的混凝土墙壁上。
-
The elimination of measures: an additional pipeline and buttress the town pier, reinforced pipe support to change the operating parameters, change operating parameters to avoid the resonance zone.
消除措施:加设管道镇墩和支墩,加固管道支撑,改变运行参数,改变运行参数避开共振区。
-
When it comes to handling the hydraulic force of high internal pressures, the brute strength of the buttress thread is clearly the best.
如果所处理的流体介质具有很高的内部静水压力,则坚固结实的锯齿螺纹就是最好的选择。
-
The two threading lines could process round thread, buttress thread, premium connection, and so on.
两条车丝线可加工圆螺纹、偏梯形螺纹、特殊螺纹等。
-
We need an round to buttress thread double pin sub.
需要一个圆扣和梯型扣双公短节。
-
The finite element models for contact problems of connectors of buttress and round thread s of casing are established with the elasto-plastic FEM.
用弹塑性有限元法建立了套管偏梯形和圆形螺纹接头接触问题的有限元力学模型。
- 相关中文对照歌词
- Chug-A-Lug
- Man Piaba
- Our Lady Of Pigalle
- The Root
- Love Of Money
- Take It To The Root
- Root Down
- Poison
- Valentine
- Hawg For You
- 推荐网络例句
-
As a dominant party,CPC government should play a guardian,supervisee and guarantee role to overcome all the difficulties in the development of charitable cause and bring it into full play in the establishment of harmonious society on policies and regulations basis.
在中国共产党的文献中第一次把发展慈善事业提到&最广泛最充分地调动一切积极因素,不断提高构建社会主义和谐社会的能力&的高度来认识。近年来,社会学界对慈善事业的理论专著发表较多,有鉴于此,笔者不揣浅陋,谈谈自己的认识和见解。
-
Flow through the land, the land of the scale of operation allows the effectiveness of the land may be raised.
通过土地的流转,土地的规模经营可以让土地的效益得到提升。
-
This is known as broker assisted trading and some brokers offer options like Interactive Voice Response System for placing orders by telephone and wireless trading systems for making orders by using web-enabled cellular phones or other handheld devices.
这是被称为经纪人协助交易和一些经纪人提供选项如交互式语音应答系统下订单的电话及无线交易系统,为决策命令,利用可上网手机或其他手持装置上。