First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
The stress and stability analysis of arch dam and abutment are the main task of traditional arch dam design. Nowadays there are two kinds of analysis method to use. One method is the arch-cantilever load-distribution method, in which the arch dam stress and abutment thrust are calculated, while the stability of abutment is evaluated by rigid body method or other method. The other is FEM method, which evaluates the arch dam stress and stability of abutment at the same time.
作为拱坝常规设计的主要任务—坝身和坝肩的应力和稳定分析,当今大体有两套体系可用:①用拱梁分载法分析坝身应力和坝肩推力,结合刚体法或其他方法进行坝肩稳定审核;②用有限元法对坝身应力和坝肩稳定同时进行审核。
-
A brief discussion on seismic design of high arch dams is made through the following three aspects:interaction of arch dams-foundation-reservoir water,dynamic stability of high arch dam abutment ,effect of transverse slots on seismic design of high arch dam,and those aspects referred to above is not enough for seismic design of high arch dam.
对高拱坝的抗震设计进行了分析,包括拱坝坝体-地基-库水动力相互作用分析、高拱坝坝肩抗震稳定分析、横缝对高拱坝抗震设计的影响,仅对高拱坝抗震设计研究的几个方面进行了概括总结。
-
A finite element numerical model for arch dam-gravity pier-foundation system was established to evaluate the effect of high gravity piers on the stress, deformation and anti-sliding stability of Sizhai arch dam, taking the following factors into account, such as the possible elastoplastic deformation of foundation rocks and the nonlinear interaction between the interfaces of gravity pier-dam foundation, the joint surfaces beneath the right bank, and the interfaces of arch dam-gravity pier.
摘要为评价高重力墩对四寨拱坝的应力变形和抗滑安全的影响,建立了拱坝-重力墩-地基系统的有限元数值模型,其中考虑重力墩-基础、右岸夹层和拱坝-重力墩等交界面的非线性相互作用,以及基岩材料的弹塑性变形行为。
-
With the increasing of the overburden layer thickness or the dam height, the maximum value of response acceleration in dam body assumes gradually decrease, and its characteristic distribution is uniformization, and the response acceleration of the dam slopes decrease remarkably, and response acceleration of the dam top is less than the dam bottom.With the decreasing of the overburden layer thickness, the dam foots and their nearby soil response acceleration get increasing.
随着覆盖层厚度增大或坝高增大,坝体中的反应加速度最大值分布具有逐渐递减、均匀化的变化特征;坝坡体的反应加速度递减显著的变化特征,坝顶反应加速度较坝底反应加速度小的特征;覆盖层厚度越小,坡脚及其附近土体的反应加速度越大的特征。
-
In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.
本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。
-
The purpose of opening the orifice was to sluice. The influence of fluctuating pressure upon the dam was another problem which was concerned by engineer. The paper analyzed Shuangkoudu masonry arch dam. The result indicated that the dam natural frequencies which consider the dam and the reservoir water interaction have great different from the preponderant frequencies of fluctuating pressure, the dam's first rank of vibration was far away from the high energy region of the fluctuating flow, so the sympathetic vibration would not take place.
坝身开设孔口主要目的是为了泄洪,泄洪时水流脉动压力对坝体结构动的影响是设计人员关心的另一课题,论文针对双口渡浆砌石拱坝进行了分析,研究结果表明:在考虑坝体一库水相互作用时坝体自振频率和水流脉动压力的优势频率相差较大,坝体的一阶振动远离脉动水流的高能量范围,二者不会发生共振。
-
The stability of arch dam mainly depends on the support force of downstream rockmass behind abutment of dam. If discontinuity and weak intermitted layer is existed in rockmass, abutment of arch dam will slide probably under pulling force and shear force at the both side of dam.
拱坝的抗滑稳定主要是依靠坝端下游岩体的支承,拱坝两岸山体在拱端推力和剪力的作用下,如果岩体中存在着不利于稳定的节理、裂隙或软弱夹层,便可能引起坝肩滑动。
-
Trough the analysis of stabilization safety on Tengzigou arch dam, some conclusions are obtained in the following:(1) Tengzigou arch dam is safe under normal poll level ;(2) stabilization safety factor of Tengzigou arch dam is about 4-5;(3) It is proved that combinatorial reinforcement measures are effective and feasible.
对藤子沟拱坝的数值计算和模型试验分析表明:(1)藤子沟水电站在正常蓄水位作用下,坝体和两岸坝肩是稳定的;(2)藤子沟拱坝的整体安全度大概为4~5左右;(3)东北院提出的对左岸泥岩层挖除处理并用混凝土置换的加固除险措施经研究表明该加固措施是有效、可行的。
-
The construction process are multiple parameters (such as partial-top, arch axis and elevation changes, etc.) real-time monitoring system controlled by the large-span cable crane rigger arch beam, the system pegging Cable-Stayed deduction deduction for arch beam geometric precision and adjust successfully to a high-precision steel pipe arch-arch-long, concrete-filled steel tube ensures the integrity and stability, effective control of the construction process are arch axis geometric precision.
施工过程中多参数控制实时监测系统,采用大跨度的缆索吊机吊运拱肋梁段,斜拉扣挂体系扣定拱肋梁段并调整几何精度,成功地将钢管拱肋高精度合龙成拱,保证了钢管混凝土的整体性和稳定性,有效控制施工过程中拱轴线几何精度。
- 相关中文对照歌词
- My Heart Beats Like A Drum (Dam Dam Dam)
- Arch Your It
- Stupid Love
- She Said Yeah
- She Said Yeah
- Missing
- Ying Yang Vs. Lil Jon And The East Side Boyz
- You Don't Know Me At All
- Rock Bottom
- Kisses Down Low
- 推荐网络例句
-
Warden: That's a beautiful dog, but don't bring her again.
那是条漂亮的狗,但是不要再把她带来了。
-
You get up in the morning – no hangover!
你第二天早上起来的时候—不会宿醉!
-
Usually, the whitest teeth are the two front teeth while molars are generally two shades darker.
通常,雪白的牙齿是两个战线同时臼齿齿通常有两种色系黑暗。