查询词典 acceleration-time graph
- 与 acceleration-time graph 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A graph in which any two vertices are connected by a path is called connected graph.
一个图中如果任意两个顶点都有一条路相连,则称之为连通图。
-
If any two nodes in a graph can be connected by a path along edges ,the graph is said to be connected.
如果图中任意两个结点间都能够用一条路径沿着边线连接起来,那么该图则被称为连通的。
-
In general,given two vertices V and W in a graph,it is not always possible to find a path connecting them;such a path will exist only when the graph is 'in one piece'.
D8 |一般而言,给定图的两个顶点V和W并非总能找到连接它们的路;只有当图是"在一块中"时,这样的路才存在。
-
In general,given two vertices V and W in a graph,it is not always possible to find a path connecting them(see Fig.3-9);such a path will exist only when the graph is"in one piece".
一般而言,给定图的两个顶点V和W并非总能找到连接它们的路(如图3-9所示);只有图"在一块之中"时,这样的路才存在。
-
The Cayley graph and the Sabidussi coset graph are two classical representations for these graphs.
这类图的典型代表是Cayley图和Sabidussi陪集图。
-
The second part points out the weakness in the planar graph of Heawood's counter example and also its types by GR graph. It also offers a new type of counter example so as to replace the former one.
第二部分通过GR图对希伍德反例进行了深入的探讨,指出该类型的平面图自身有破绽并给出新的反例类型以取代原反例。
-
ABSTRACT To improve the parametric design method which is based on points, lines and circles, this dissertation presents the theory and methodology of parametric design which is based on relating-graph. The expression, organization, cyclic problem, covariation and extension method of relating-graph are studied.
针对当前二维参数化方法中存在的考虑线素较为简单、循环约束问题较难解决等一系列问题,本文系统地研究了基于高层次图素的关联图形的表达、关联图形的组织、关联图形循环约束问题的解决、关联图形的联动以及关联图形的拓广等方法。
-
Detail are introduced as following: transfering the LS equation to difference equation, setting the initial conditions for different shape explosive at different initiation way (point, line, plane, divergent or convergent); the dealing method of different edge conditions; how to draw the curve graph in two dimensional space or surface graph in three dimensional space with the calculated data.
本文提出了在三维直角坐标系中爆轰波传播LS方程离散化方法,建立了相应的差分方程,研究了对不同形状炸药在多种起爆形式(点、线、面、散心、聚心)下初值条件的设定,以及各种边界条件的处理方法。
-
One is by knowledge Petri net First AND/OR graph was evolved by calculating cut set of relationship Matrix of parts which shows the assembly relation between the parts. Then the KPN was generated with AND/OR graph automatically. Running the KPN, an optimum assembly sequences was obtained last. The other is by Hopfield neural network.
一是利用知识PETRI网对装配过程进行建模,并自动规划出最佳装配序列的方法;这种方法首先根据产品装配的关联图,利用割集计算,自动生成产品装配的与/或图,由产品装配的与/或图转化成知识PETRI网,然后,运行此知识PETRI网,便可得产品的最佳装配序列。
-
With this method, the reliability to direct the constraint graph is increased, the computation complexity is reduced, and the cyclic constraint graph can be solved expediently.
应用此方法,可提高约束图有向化的可靠性、降低计算复杂度,且能方便地求解带有循环约束的约束图。
- 相关中文对照歌词
- Discos And Casinos
- Speed And Velocity
- Flashback
- Binary
- Mother Of Abominations
- Lullabye
- Shimmy Shimmy Quarter Turn
- Live 4 Love
- Minor Thing
- Overland, West Of Suez
- 推荐网络例句
-
This is the inheritance of the tribe of the children of Issachar according to their families, the cities and their villages.
19:23 这些城并属城的村庄就是以萨迦支派按着宗族所得的地业。
-
I've have enough of your garbage.
我听了你的废话。
-
After the website finished, do not lie over to waiting for a guest to fall from the day.
网站做完了以后,别躺在那里等着客人从天而降。