英语人>词典>汉英 : 时间隧道 的英文翻译,例句
时间隧道 的英文翻译、例句

时间隧道

词组短语
time warp
更多网络例句与时间隧道相关的网络例句 [注:此内容来源于网络,仅供参考]

Various ventilation methods are discussed and the necessity to use feed-forwards traffic forecast ventilation control is put forward. Autoregressive Moving Average process is implemented to forecast traffic volume. Fuzzy intelligent control strategy is developed to address the problem that tradition control methods could hardly response to cross-river tunnel contaminant in time.

在分析了不同通风控制系统下,前馈预估控制对隧道通风控制的必要性;提出了运用自回归滑动时间序列模型对隧道交通流预测的方法;反馈控制无法及时响应隧道污染物变化情况的基础上,采用模糊控制设计隧道通风控制策略。

Xue-Wu Tunnel, which is located in Provincial Highway No.7, is the first case to use Fiber Bragger Grating Sensors Real Time Monitoring System to measure tunnel deformation.

雪雾隧道的光纤监测系统,不但使用先进的光栅式光纤技术,并设置了远端即时监控的功能,还可於灾害发生的第一时间主动发布电话语音简讯,隧道养护人员便可透过网际网路随时随地掌握现场的即时影像及监测数据。

Directed against stress properties of lining structure of loess highway tunnel, the paper selects three loess highway tunnels as relying engineering according to buried depth and soil properties, and takes field observation synthetically for the first time, which pays more attention to researches on the change regulations of pressure acting on first lining and invert, axial force of lattice girder, contact stress between first and second lining, concrete strain of second lining verse the time and distributions in different positions.

针对黄土公路隧道衬砌结构受力特性,根据埋深和土质情况,选取三座黄土公路隧道为依托工程,首次开展了大规模系统的现场测试,着重研究了一衬和仰拱围岩压力、格栅拱钢筋轴力、一衬和二衬接触应力以及二衬混凝土应变时间变化规律及分布特性。

According to the most unfavorable fire scenario for safety evaeuation, the AEST can be obtained through the spread of fire and smoke spread simulation. And the REST of different staff loads are calculated by empirical formula method. Through contrasting two times, whether evacuation passage setting can meet the evacuation requirements is confirmed, and then solutions are proposed. Then highway tunnel fire cause is discussed by Fault Tree Analysis method, and the effective measures to reduce the probability of tunnel fire are reducing the number of flammable materials and using fire-retardant or noncombustible materials for inner decoration are obtained.

以厦门金山寨隧道为例分析火灾时人员的安全疏散,针对隧道内最不利人员安全疏散的火灾场景进行分析,通过对火灾蔓延、烟气扩散进行模拟获得可用的人员安全疏散时间AEST,并用经验公式法计算不同的人员荷载下必需的人员安全疏散时间REST,对比两个时间,判别当前疏散通道的设置是否满足人员疏散要求,并对不满足安全疏散要求的工况提出解决方案。

When excavating width of block of the third layer along tunnel above tunnel increasing to 6m from 3m and excavation time not shorten, calculation results of upheave on the same position increase 2%.

3基坑第三层沿隧道纵向分段开挖的段宽由3m增加到6m后,如果开挖所花时间相同,隧道上浮量仅增加约2%。

The next exit time for the tunnel was 15:00, so I puttered around the shops for a bit, but bought nothing.

下一个出口的时间隧道是15:00 ,所以我puttered周围的一些商店,但买什么。

As restricted by tunnel clearance, transportation vehicles size and safety distance, only single-orbit transportation can be used in construction of small section shield tunnel.

小断面盾构隧道施工,因受隧道净空、运输车辆尺寸以及安全间距等方面的限制,只能采用单线轨道运输方式,随着隧道的不断延长,洞内运输时间成为制约施工进度的瓶颈。

The difference between the national "Code for design of metro"(GB50157-2003) and the NFPA130 "Standard for Fixed Guide-way Transit and Passenger Rail Systems" on calculation method for person evacuation time in the metro station fire is compared.

针对地铁车站火灾人员疏散时间计算方法的问题,比较研究国内现行《地铁设计规范》(GB50157-2003)和美国专门针对有轨交通系统的NFPA130标准的异同,其结果说明:国内设计规范关于人员疏散时间的计算方法存在不足;对区间隧道内列车着火的情况进行分析讨论,指出对列车在区间隧道内着火,且还能继续运行的情况,着火列车的运行速度对火势的发展以及人员疏散时间的影响是不可忽视的。

This research shows that the effect of shield tunnel on the adjacent building's pile foundation is time dependent, because the adjacent structure and the pile foundation are affected in a certain period of time even after the shield was excavated, and this affected time is related to the viscoelastic property of soil, the parameters of the existing tunnel and structure.

研究表明,盾构隧道对邻近建筑物及桩基的影响是时间相关的,隧道在开挖后一段时间内对周边建筑及桩基产生影响,其影响时间的长短与周边土体的粘弹性性质以及隧道和邻近建筑的参数有关。

This article embarks from the project time management, and unifies the characteristic of railroad engineering construction, conducts the research on Huang family slope first tunnel section (DK1603+080 ~ DK1603+184) engineering project time management and optimization.

本文从项目时间管理出发,结合铁路工程建设的特点,就中国铁路工程第十六局承建的武汉至广州客运专线长石村铁路隧道——黄家坡一号隧道标段(DK1603+080~DK1603+184)工程项目时间管理及优化进行了研究,文中对本项目工程计划、进度、时间管理和优化进行了阐述,在工程进度计划上进行了分析,并使用关键链法对项目计划进行了时间优化研究。

更多网络解释与时间隧道相关的网络解释 [注:此内容来源于网络,仅供参考]

baseball bat:棒球棍

备注: 球棍来了:用棒球棍(baseball bat)击中敌人. 备注: 神枪手:完成"烟花"(Fireworks)后还剩余超过2:30的时间. 备注: 加速?我们不需要!:在不使用加速(Turbo)的情况下完成"隧道探索"(Tunnel Vision).

medial epicondyle:内上髁

原处减压法(In situ decompression):在肱骨内上髁(medial epicondyle)后方,开一条与尺神经的走向相同的切口,可以将尺神经从肘隧道中"放"出来. 这个方法会切开一些韧带,尤其是那些很厚而压迫到尺神经的. 这个方法较适合比较不严重或生病时间较短的病人.

medial epicondyle:(肱骨)内上髁

原处减压法(In situ decompression): 在肱骨内上髁(medial epicondyle)后方,开一条与尺神经的走向相同的切口,可以将尺神经从肘隧道中"放"出来. 这个方法会切开一些韧带,尤其是那些很厚而压迫到尺神经的. 这个方法较适合比较不严重或生病时间较短的病人.

halogen lamp:卤钨灯

目前一般的卤钨灯(Halogen Lamp)和HID灯(High Intensity Discharge,高强度放电)在亮灯后达到最大亮度之前有一定的时间间隔. 但LED可以瞬间达到最大亮度,这对於汽车进入隧道时提高了安全性. 在寒冷地区,HID灯从点亮达到最大亮度之前的时间间隔更长,

Tunnel reverb:隧道混响 Reverb 混响时间

7 Live Room 房间混响 Reverb 混响时间 | 8 Tunnel Reverb 隧道混响 Reverb 混响时间 | 9 Sap Reverb 拍击混响 Reverb 混响时间

TTL Time to live:生存时间

transitive trust --- 可传递信任 | TTL, Time-To-Live --- 生存时间 | tunnel --- 隧道

peripheral tinnitus:周围性耳鸣

这一通道的再激发有可能对"周围性耳鸣"(peripheral tinnitus)中独立于感官的活性有贡献. 扫描隧道显微镜(STM)是纳米科学中最有用的工具之一. 但这一技术的一个严重局限性是其时间分辨率. 这个分辨率不是由隧道作用的基本物理决定的,