英语人>词典>汉英 : 拆除...的设备 的英文翻译,例句
拆除...的设备 的英文翻译、例句

拆除...的设备

基本解释 (translations)
dismantle  ·  dismantled  ·  dismantles

更多网络例句与拆除...的设备相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper introduces the technologies and process of the decommission of uranium mines and mills in Germany,including closure of underground mines,remediation of waste rock piles,dismantling and demolition of installations and buildings,stabilization of tailings ponds and water treatment,in ...

举例介绍了德国铀矿山和水冶厂退役治理技术及进展,包括矿井关闭、废石堆治理、建筑物及设备器材的拆除、尾矿稳定、水处理等,同时简单介绍了德国铀矿冶的发展历史、铀矿山和水冶厂退役治理依据及退役监测

A lot of fireproof data are used in process of the puddling of steely course of study, steelmaking, if produce equipment to produce damaged with fireproof material, the stability of unwarrantable operation, the fireproof data that manufacturing facilities place uses is about to demolish deserted.

在钢铁业的炼铁、炼钢工序中使用许多耐火材料,假如生产设备用耐火材料发生破损,不能保证操作的稳定性,生产设备所用的耐火材料就要拆除废弃。

When an operator or a maintenance worker is radiated as a result of incorrect operation, he or she may suffers from a poor health as a result of the radiation hazard.

设备检修时含放射源仪表的拆除、安装、铅罐活门的关闭、开启,均要有专人负责,进行严格登记,并要有放射卫生防护人员现场监护。

We have a mechanical removal of the past which the equipment you need it.

我们有一个机械拆除过去的设备你需要它。

Armed with a MG34 and equipped with a German radio set, these vehicles were also equipped with cameras and sound recordings equipments.During Summer 1943, several Panhard P178s were rearmed with a 5.0cm KwK L/42 gun installed in a superstructure unarmored to the rear.

这些车保留了炮塔,拆除25mm炮,改装一挺MG34机枪,增强了电台设备,并加装了扩音喇叭。1943年夏,几辆潘哈德178换装50mm KwK L/42火炮,封闭炮塔容不下这么大的火炮只能改为敞开式。

The grill cooker is removably set in a recess in an upper portion of the multipurpose cooking apparatus.

烧烤炉可拆除地设置于复合烹调设备的上部凹槽中。

While dismantling an outdoor set in wintry conditions for Jumper , a sci-fi thriller starring Samuel Jackson, set dresser David Ritchie was fatally struck by frozen debris.

虽然在寒冷的环境中已经为跳跃者(科幻片主演塞缪尔·杰克逊)拆除了户外设备,但是一位化妆师大卫。里奇还是很不幸地被冻结的碎片击中并身亡。

To help the foundation in cooperation with the completion of construction and post-construction technical measures to solve the slipform construction equipment to remove then continued after the construction of roof slab of the technical problems.

帮助合作单位完成了基础施工与后期施工技术措施,为施工单位解决了滑模设备拆除后屋面梁板续接施工的技术问题。

2 Removal of 39.1 Improper Work, Materials or Plant The Engineer shall have authority to issue instructions from time to time, for: the removal from the Site, within such time or times as may be specified in the instruction, of any materials or Plant which, in the opinion of the Engineer, are not in accordance with the Contract, the substitution of proper and suitable materials or Plant, and the removal and proper re-execution, notwithstanding any previous test thereof of interim payment therefore, of any work which, in respect of materials, Plant or workmanship, or design by the Contractor or for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.

工程师有权随时发出指令:在指令规定的时间内一次或分几次从现场运走工程师认为不符合合同规定的任何 34 不合格工 39.1 程,材料或设备的拆除和运走材料或设备;用适用合格的材料或设备取代原来的材料或设备;对尽管先前已进行过检验或中间支付,但工程师认为材料,设备或施工工艺,或由承包人本身进行的或由其负责设计的不符合合同规定的工程拆除并重新施工。

The first building in Shanxi Grace Ha limited liability company formerly known as the Seventh Ministry of Coal Agency, the Agency Yangquan Mining Bureau, Shanxi Construction Engineering First Co., Ltd.-Hong Ha, was founded in January 23, 1953, is a state-owned large-scale integrated of construction enterprises with a national examination approved by the Ministry of Construction of the mine engineering, building construction general contracting, construction of earth and stone three-level professional qualification contractor and the state Department of Commerce approved the operation of foreign contracted engineering credentials, and has electrical and mechanical equipment installation work construction general contracting, demolition and dismantling works, plumbing works, tunnels, installation of lifting equipment, steel structure construction of six two qualified professional contractors, real estate development for the three-tier quality and size power facilities permit, boiler installation permits two special qualifications.

山西宏厦第一建设有限责任公司前身为煤炭部第七工程处、阳泉矿务局工程处、山西宏厦建筑工程第一有限公司,始建于1953年1月23日,是一家国有大型综合性施工企业,拥有国家建设部审定核准的矿山工程、房屋建设工程施工总承包、土石方工程施工专业承包三项一级资质和国家商务部核准的对外承包工程经营资格证书,并拥有机电设备安装工程施工总承包、爆破与拆除工程、管道工程、隧道、起重设备安装工程、钢结构工程施工专业承包六项二级资质、房地产开发三级资质及承装电力设施许可证、锅炉安装许可证两项特种资质。

更多网络解释与拆除...的设备相关的网络解释 [注:此内容来源于网络,仅供参考]

dismally:阴暗地/沉闷地

disloyalty /不忠实/不信/不义/ | dismally /阴暗地/沉闷地/ | dismantle /拆除...的设备/分解/去除覆盖物/

dismally:阴暗地; 沉闷地 (副)

dismal 阴沉的; 暗的; 凄凉的 (形) | dismally 阴暗地; 沉闷地 (副) | dismantle 拆除...的设备, 去除覆盖物, 分解 (动)

polluting process:污染工序

(由1993年第13号第2条增补)"石棉消减工程"(asbestos abatement work) 指用以控制石棉纤维从含石棉物料释出的任何工程或程序,包括拆除与运输含石棉物料; (由1993年第13号第2条增补)"污染工序"(polluting process) 包括放出空气污染物的烟、有关装置、机械或设备的活动、工序或操作;

remedying of defects:缺陷的修复

remedying defects, cost of 修补缺陷的成本 | remedying of defects 缺陷的修复 | removal of contractor's equipment after termination 合同终止后,承包商设备充现场拆除