英语人>词典>汉英 : 投产 的英文翻译,例句
投产 的英文翻译、例句

投产

词组短语
put into production · starting up · put into production in commission · completion and commissioning · put on production
更多网络例句与投产相关的网络例句 [注:此内容来源于网络,仅供参考]

Company is the largest acetic acid, ADC foaming agent, bleaching powder and rubber manufacturing enterprises TBSI, the hydrazine hydrate separation purification technology has been put into operation in the test, hydrogen peroxide oxidation ADC technology has achieved a stable production, 40,000 tons / ion-exchange membrane caustic soda and add years of frozen liquid chlorine production units have been, it is worth noting, the company leading products are highly effective fungicides calcium hypochlorite, can be used for family, food and public places in the battle against the bactericidal.

公司是国内最大的醋酸、ADC发泡剂、漂精粉和橡胶硫化促进剂生产企业,其水合肼提纯分离中试技术已投产、双氧水氧化法ADC技术也已实现稳定生产, 4万吨/年离子膜烧碱及新增液氯化冷冻机组也已投产,值得注意的是,公司主导产品漂粉精属于高效杀菌剂,可用于家庭、餐饮及公共场所的杀菌灭毒。

First stage started from May of 2007, three aluminium foil process lines with investment 38 million US Dollars, yearly capacity 20 000 metric tons, will put into production in April of 2008; second stage started from February of 2008 with investment 25 million US Dollars and the capacity 30 000 metric tons, three aluminium foil process lines; The third stage will start from the year 2009 with about investment 175 million US Dollars, six aluminium foil process lines, twelve casting-roll process lines and three cold-roll process lines.

一期工程3条铝箔生产线于2007年5月份开始施工,年产铝箔20 000吨,投资2.57亿元,于2008年4月份实现投产;二期工程于2008年2月份动工兴建,在一期工程的基础上再建设3条铝箔生产线,投资1.5亿元,投产后企业年生产铝箔能力将达50 000吨;三期工程包括6条铝箔生产线、20条铸轧生产线和3条冷轧生产线,计划2009年开始兴建,投资约12亿元。

Brief Introduction of Enterprise : Hebei Pan's is popular the group subordinate's Pan Uygur environmental protection project limited company is Pan is popular group 97 years in July and the Czechoslovakian Uygur all the branches except infantry prestige plan limited liability company pools capital 3 million US dollar constructing use cow dung to produce the methane, with the methane electricity generation, moors the fluid, moors the dregs production organic fertilizer the energy environmental protection project, at present generates electricity the part to put into service, the organic fat part 2000 square meters produced the host workshop already to complete, the equipment components arrived, went into production completely still must the fund 14 million Yuan.

企业概况:河北潘兴集团下属的潘维环保工程有限公司是潘兴集团97年7月与捷克维特科威策股份有限公司合资300万美元兴建的利用牛粪产生沼气,用沼气发电,沼液、沼渣生产有机肥料的能源环保型项目,目前发电部分已投入运营,有机肥部分2000平米生产主车间已经完成,部分设备已到位,完全投产尚需资金1400万元。进展情况:有机肥2000平米生产车间已完成,部分设备已到位,完成投产尚需资金1400万元。

By seeing about, we chose the vertical technology and determined the quality indexes and process parameters after comparing the grinding efficiency, energy consumption and final cost of vibromill, ball mill, rolling press and vertical mill. The production line run well after start of operation, the quality of the S95-slag power was stable, and realized efficiency goals in the current year.

经考察了解,并分析振动磨、球磨机、辊压机及立磨系统工艺粉磨效率、能耗、成本等优缺点的基础上,选用了立磨系统工艺,确定了质量控制指标及生产工艺参数,投产后生产线生产运行状况良好,S95级矿渣粉产品质量稳定,实现了当年投产当年达效的目标。

However,the liquid water exists on the inner wall and the pipeline sinkage before the line comes on stream will have a humidification function to the natural gas,because of which the dew point tempera...

但输气管道投产前存在于管道内壁和管道低洼处的液态水对天然气有增湿作用,导致天然气露点在输气管道投产初期不能满足管输要求。

However, the liquid water exists on the inner wall and the pipeline sinkage before the line comes on stream will have a humidification function to the natural gas, because of which the dew point temperature of natural gas can not meet the requirement of gas transmission at the early stage of the pipeline commissioning.

但输气管道投产前存在于管道内壁和管道低洼处的液态水对天然气有增湿作用,导致天然气露点在输气管道投产初期不能满足管输要求。

To meet requirement of production and quicken rolling speed, No.2 heating furnace was put into operation in 2002 and No.3 in 2007. All automatic control was adopted, displacement of walking beam was detected by displacement transducer, and acceleration and deceleration control of walking beam was carried out through proportional valve and by use of slope technique in program of GE 90-70 PLC, thus, travelling speed of walking beam can be controlled and lift and release of slab can be operated lightly.

为适应生产的需要,加快轧制速度,2002年投产的2号加热炉和2007年投产的3号加热炉均采用全自动控制,利用位移传感器检测步进梁的位移量,通过比例阀以及在GE90-70PLC程序中采用斜坡技术对步进梁运动进行加减速控制,达到控制步进梁运行速度的目的,实现对板坯的轻拿轻放。

Company to expand production in 2005, with the Brothers (that is incorporated into the building materials company Jingbang Kong) complement each other, helping and supporting each other, co-operation centrifugal glass wool carpets production line 2, specializing in the production of centrifugal glass wool.

公司于2005年扩大投产,与兄弟公司(即并入靖邦实业的建材公司)优势互补、相互帮扶,共同投产离心玻璃棉毡生产线2条,专业生产离心玻璃棉。

In only 12 month, Tanan Shenran 150 thousand M3 per day LNG project has finished the work from the very beginning to the very end. This project has created a milestone on China gas history, it is not only the first on constructing period, but also make many first on technology: The first self-owned intellectual property LNG plant which is nitrogen expanding and recycling refrigerating in China; the first plant which are all made in China; the first plant which use the parallel connection temperature expander refrigerate technology; the first use the pressure dryness vaporizer technology on Nitrogen gas liquefaction and purity system; the first use the deep fat stove technology in purity system; the piston nitrogen compressor is the biggest in China and etc.

短短12个月内,泰安深燃日产15万立方米液化天然气工程项目完成了从立项到投产的全部建设工程,该套项目的顺利投产完成创造了中国燃气史上的一个新的里程碑,不仅在建设周期上创造了第一,在技术方面同样创造了多个第一:我国首个具有自有知识产权的氮气膨胀、循环制冷液化天然气设备,填补了国内在这一技术领域的空白,对我国名族天然气液化事业的发展产生了积极的推动作用;首次实现设备国产化达到100%;首次采用并联双温区的膨胀机制冷技术;首次将等压干燥脱水技术应用于天然气液化系统、净化系统;首次在净化系统采用了导热油炉、单炉双温区共用形式;所采用的单级双列活塞式氮气压缩机位国内最大等技术。

In only 12 month, Tanan Shenran 150 thousand M3 per dayLNG project has finished the work from the very beginning to the very end. This project has created a milestone on China gas history, it is not only the first on constructing period, but also make many first on technology: The first self-owned intellectual property LNG plant which is nitrogen expanding and recycling refrigerating in China; the first plant which are all made in China; the first plant which use the parallel connection temperature expander refrigerate technology; the first use the pressure dryness vaporizer technology on Nitrogen gas liquefaction and purity system; the first use the deep fat stove technology in purity system; the piston nitrogen compressor is the biggest in China and etc.

短短12个月内,泰安深燃日产15万立方米液化天然气工程项目完成了从立项到投产的全部建设工程,该套项目的顺利投产完成创造了中国燃气史上的一个新的里程碑,不仅在建设周期上创造了第一,在技术方面同样创造了多个第一:我国首个具有自有知识产权的氮气膨胀、循环制冷液化天然气设备,填补了国内在这一技术领域的空白,对我国名族天然气液化事业的发展产生了积极的推动作用;首次实现设备国产化达到100%;首次采用并联双温区的膨胀机制冷技术;首次将等压干燥脱水技术应用于天然气液化系统、净化系统;首次在净化系统采用了导热油炉、单炉双温区共用形式;所采用的单级双列活塞式氮气压缩机位国内最大等技术。

更多网络解释与投产相关的网络解释 [注:此内容来源于网络,仅供参考]

put/bring sth. into operation:使投产,运转

483.operate on sb. 给某人做手术 | put/bring sth. into operation 使投产,运转 | 484.be of the opinion 持有的看法

go into (enter ) full operation; be full operation; befully operational:全面投产开工

全球变暖 global warming | 全面投产开工 go into (enter ) full operation; be full operation; befully operational | 拳头产品 knockout product or competitive product

go into (enter ) full operation; be full operation; be fully operational:全面投产开工

全球变暖 global warming | 全面投产开工 go into (enter ) full operation; be full operation; be fully operational | 拳头产品 knockout product or competitive product

in commission:投产

in commercial quantity 工业规模地 | in commission 投产 | in compression 受压

putting into operation in compliance with standard:达标投产

pusher in the secondary of hydrogen bomb 氢弹次级推进层 | putting into operation in compliance with standard 达标投产 | putting-into-service 投运

input-output analysis:投产出产分析,投产出产分析,投入产出分析

input-output accounting 投入产出核算 | input-output analysis 投产出产分析,投产出产分析,投入产出分析 | input-output analysis method 投入产出分析法

put into production:将...投产,开始生产

put...into operation 将...投入生产,实施,开动 | put...into production将...投产,开始生产 | put off 推迟,延期;消除;推脱,脱下

LS Launch Sign-Off:投产验收

LRR Launch Readiness Review 投产准备就绪论证 | LS Launch Sign-Off 投产验收 | LSL Lower Specification Limit 低参数限制

nonproducing reserves:未投产储量

nonprimary reflection 非一次反射 | nonproducing reserves 未投产储量 | nonproducing 非生产的

commissioning:投产

管线置换投产(commissioning)是什么样个过程?管线置换投产(commissioning)是什么样个过程?请教高手:管线置换投产(commissioning)是什么样个过程??